EPA Air · stack tests by state, industry and year
Pipeline transportation (NAICS 4862): stack tests in Michigan, 2017
- 21Stack tests
A stack test measures what a source actually emits, at the stack, against the limit in its permit. Each row is one stack test recorded during 2017 at a Michigan source whose primary industry code is NAICS 4862. A facility filing more than one industry code is counted under the first one on its record.
Pipeline transportation (NAICS 4862) in Michigan, other years
Other industries in Michigan, 2017
- Utilities (NAICS 2211) 79
- Waste management and remediation (NAICS 5622) 22
- Petroleum and coal products manufacturing (NAICS 3241) 18
- Fabricated metal product manufacturing (NAICS 3328) 11
- Transportation equipment manufacturing (NAICS 3361) 11
- Primary metal manufacturing (NAICS 3311) 8
- Transportation equipment manufacturing (NAICS 3363) 7
- Paper manufacturing (NAICS 3221) 7
- Plastics and rubber products manufacturing (NAICS 3261) 7
- Primary metal manufacturing (NAICS 3315) 7
- Utilities (NAICS 2213) 6
- Chemical manufacturing (NAICS 3251) 6
- Utilities (NAICS 2212) 6
- Nonmetallic mineral product manufacturing (NAICS 3273) 5
- Primary metal manufacturing (NAICS 3313) 5
- Wood product manufacturing (NAICS 3212) 4
- Food manufacturing (NAICS 3113) 4
- Educational services (NAICS 6113) 4
- Chemical manufacturing (NAICS 3254) 3
- Professional, scientific and technical services (NAICS 5413) 3
- Nonmetallic mineral product manufacturing (NAICS 3279) 3
Air-emissions stack tests recorded in Michigan, 2017
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2017-11-28 | ANR PIPELINE-COLD SPRINGS12 /BLUE LAKE/ COLD SPRINGS 1 | MANCELONA, Kalkaska, MI | Pass | State |
| 2017-10-12 | ANR PIPELINE - CENTRAL CHARLTON COMPRESSOR STATION | JOHANNESBURG, Otsego, MI | Pass | State |
| 2017-10-04 | ANR PIPELINE-COLD SPRINGS12 /BLUE LAKE/ COLD SPRINGS 1 | MANCELONA, Kalkaska, MI | Pass | State |
| 2017-10-04 | ANR PIPELINE-COLD SPRINGS12 /BLUE LAKE/ COLD SPRINGS 1 | MANCELONA, Kalkaska, MI | Fail | State |
| 2017-10-03 | BLUEWATER GAS STORAGE FACILITY - COLUMBUS | COLUMBUS, St. Clair, MI | Pass | State |
| 2017-09-26 | CONSUMERS ENERGY - ST. CLAIR COMPRESSOR STATION | IRA, St. Clair, MI | Pass | State |
| 2017-09-14 | ANR PIPELINE CO - WOOLFOLK COMPRESSOR STATION | BIG RAPIDS, Mecosta, MI | Pass | State |
| 2017-09-13 | VECTOR PIPELINE L.P. WASHINGTON COMPRESSOR STATION | WASHINGTON, Macomb, MI | Pass | State |
| 2017-08-29 | ANR PIPELINE-COLD SPRINGS12 /BLUE LAKE/ COLD SPRINGS 1 | MANCELONA, Kalkaska, MI | Pass | State |
| 2017-08-15 | ANR PIPELINE-COLD SPRINGS12 /BLUE LAKE/ COLD SPRINGS 1 | MANCELONA, Kalkaska, MI | Pass | State |
| 2017-07-17 | CONSUMERS ENERGY - RAY COMPRESSOR STATION | ARMADA, Macomb, MI | Pass | State |
| 2017-06-28 | DTE GAS COMPANY - WILLOW RUN COMPRESSOR STATION | YPSILANTI, Washtenaw, MI | Pass | State |
| 2017-06-26 | CONSUMERS ENERGY - ST. CLAIR COMPRESSOR STATION | IRA, St. Clair, MI | Pass | State |
| 2017-06-19 | ANR PIPELINE CO - WOOLFOLK COMPRESSOR STATION | BIG RAPIDS, Mecosta, MI | Pass | State |
| 2017-06-06 | ANR PIPELINE-COLD SPRINGS12 /BLUE LAKE/ COLD SPRINGS 1 | MANCELONA, Kalkaska, MI | Fail | State |
| 2017-05-16 | ANR PIPELINE COMPANY - BRIDGMAN COMPRESSOR STATION | BRIDGMAN, Berrien, MI | Pass | State |
| 2017-05-11 | ANR PIPELINE CO - WOOLFOLK COMPRESSOR STATION | BIG RAPIDS, Mecosta, MI | Pass | State |
| 2017-04-26 | CONSUMERS ENERGY - RAY COMPRESSOR STATION | ARMADA, Macomb, MI | Pass | State |
| 2017-03-28 | CONSUMERS ENERGY - WHITE PIGEON COMPRESSOR STATION — high-priority violation on file | WHITE PIGEON, St. Joseph, MI | Pass | State |
| 2017-03-08 | GREAT LAKES GAS TRANSMISSION STATION #8 | CRYSTAL FALLS, Iron, MI | Pass | State |
| 2017-03-07 | CONSUMERS ENERGY - OVERISEL COMPRESSOR STATION | HAMILTON, Allegan, MI | Pass | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the stack test. Figures from EPA’s ICIS-AIR download.