EPA Air · stack tests by state, industry and year
Pipeline transportation (NAICS 4862): stack tests in Michigan, 2023
- 19Stack tests
A stack test measures what a source actually emits, at the stack, against the limit in its permit. Each row is one stack test recorded during 2023 at a Michigan source whose primary industry code is NAICS 4862. A facility filing more than one industry code is counted under the first one on its record.
Pipeline transportation (NAICS 4862) in Michigan, other years
Other industries in Michigan, 2023
- Utilities (NAICS 2211) 39
- Waste management and remediation (NAICS 5622) 33
- Transportation equipment manufacturing (NAICS 3361) 13
- Chemical manufacturing (NAICS 3251) 12
- Utilities (NAICS 2212) 11
- Petroleum and coal products manufacturing (NAICS 3241) 10
- Primary metal manufacturing (NAICS 3311) 9
- Utilities (NAICS 2213) 6
- Educational services (NAICS 6113) 6
- Paper manufacturing (NAICS 3221) 6
- Transportation equipment manufacturing (NAICS 3363) 6
- Fabricated metal product manufacturing (NAICS 3328) 5
- Nonmetallic mineral product manufacturing (NAICS 3273) 5
- Food manufacturing (NAICS 3113) 4
- Plastics and rubber products manufacturing (NAICS 3261) 4
- Food manufacturing (NAICS 3112) 4
- Wood product manufacturing (NAICS 3212) 3
- Primary metal manufacturing (NAICS 3315) 3
Air-emissions stack tests recorded in Michigan, 2023
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2023-11-14 | CONSUMERS ENERGY - ST. CLAIR COMPRESSOR STATION | IRA, St. Clair, MI | Pass | State |
| 2023-09-26 | DTE GAS COMPANY - KALKASKA COMPRESSOR STATION | KALKASKA, Kalkaska, MI | Pass | State |
| 2023-09-12 | CONSUMERS ENERGY - ST. CLAIR COMPRESSOR STATION | IRA, St. Clair, MI | Pass | State |
| 2023-09-12 | BLUEWATER GAS STORAGE FACILITY - COLUMBUS | COLUMBUS, St. Clair, MI | Pass | State |
| 2023-09-07 | CONSUMERS ENERGY - RAY COMPRESSOR STATION | ARMADA, Macomb, MI | Pass | State |
| 2023-08-29 | CONSUMERS ENERGY - RAY COMPRESSOR STATION | ARMADA, Macomb, MI | Pass | State |
| 2023-07-20 | VECTOR PIPELINE L.P., ATHENS COMPRESSOR STATION | ATHENS, Calhoun, MI | Pass | State |
| 2023-07-18 | VECTOR PIPELINE L.P. WASHINGTON COMPRESSOR STATION | WASHINGTON, Macomb, MI | Pass | State |
| 2023-07-13 | CONSUMERS ENERGY - ST. CLAIR COMPRESSOR STATION | IRA, St. Clair, MI | Pass | State |
| 2023-07-06 | ANR PIPELINE CO - WOOLFOLK COMPRESSOR STATION | BIG RAPIDS, Mecosta, MI | Pass | State |
| 2023-06-27 | ANR PIPELINE COMPANY - HAMILTON COMPRESSOR STATION | HAMILTON, Allegan, MI | Pending | State |
| 2023-05-19 | ANR PIPELINE COMPANY - BRIDGMAN COMPRESSOR STATION | BRIDGMAN, Berrien, MI | Fail | State |
| 2023-05-09 | DTE GAS COMPANY - WILLOW RUN COMPRESSOR STATION | YPSILANTI, Washtenaw, MI | Pass | State |
| 2023-04-14 | SEMCO ENERGY GAS COMPANY - MORTON WELLS FACILITY | MARYSVILLE, St. Clair, MI | Pass | State |
| 2023-04-04 | CONSUMERS ENERGY - WHITE PIGEON COMPRESSOR STATION — high-priority violation on file | WHITE PIGEON, St. Joseph, MI | Pending | State |
| 2023-03-29 | DTE GAS COMPANY - WILLOW RUN COMPRESSOR STATION | YPSILANTI, Washtenaw, MI | Pass | State |
| 2023-02-28 | CONSUMERS ENERGY - OVERISEL COMPRESSOR STATION | HAMILTON, Allegan, MI | Pass | State |
| 2023-02-24 | ANR PIPELINE COMPANY LINCOLN COMPRESSOR STATION | LAKE GEORGE, Clare, MI | Pass | State |
| 2023-02-21 | CONSUMERS ENERGY - WHITE PIGEON COMPRESSOR STATION — high-priority violation on file | WHITE PIGEON, St. Joseph, MI | Pass | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the stack test. Figures from EPA’s ICIS-AIR download.