NPDES AKR10GI41 · Clean Water Act
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage, AK: NPDES AKR10GI41 discharge permit, effluent exceedances, inspections, penalties
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage, Alaska: General permit coverage AKR10GI41, held by Jeremy Ingram - HI-TECH Rockfall Construction, lnc.; Construction stormwater; Effective; issued June 22, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation; Other Heavy and Civil Engineering Construction.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 423 were issued before AKR10GI41.
Coverages issued nearest AKR10GI41
- 2023-06-16: ANC TAXIWAY Z WEST IMPROVEMENTS, Anchorage: AKR10H0AG, held by Todd Porter
- 2023-06-19: PARKS HIGHWAY MP 231 ENHANCEMENTS, Denali National Park: AKR10GQ44, held by Anton Johansen - Great Northwest INC
- 2023-06-19: CRIPPLE CREEK RESTORATION DAM, Fairbanks: AKR10H00L, held by Royce Drennon, Drennon Construction & Consulting, Inc.
- 2023-06-21: EKWOK AIRPORT RESURFACING_2, Ekwok: AKR10GP62, held by John Binder
- 2023-06-21: FNSB TRANSIT FACILITY, Fairbanks: AKR10H013, held by Dustin Pruett
- 2023-06-22: CRIPPLE CREEK ROAD STABILIZATION & COAL CREEK CROSSING PROJECT NO. 52959-5, Healy: AKR10H0AA, held by Royce Drennon
- 2023-06-23: FTW410 REPAIR BUILDING 1001, Fort Wainwright: AKR10GJ93, held by James Sauceda
- 2023-06-23: FTG233 COMMUNICATIONS CENTER_2, Fort Greely: AKR10GL93, held by James Sauceda
- 2023-06-23: EIE443 TURBINE GENERATOR REPLACEMENT_2, Eielson Afb: AKR10GQ08, held by James Sauceda
- 2023-06-23: NIL003 NINILCHIK HARBOR REVETMENT REPLACEMENT, Ninilchick: AKR10H03T, held by James Sauceda
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION among its neighbors
19 discharge permits are in the Turnagain Arm subwatershed (HUC 190203020705); AKR10GI41 is one. Its county: 555, 4 major; AKR10GI41 is minor permit.
Other permits in the Turnagain Arm subwatershed (HUC 190203020705)
- ALPINE VIEW CHALETS, Girdwood: AKR10H0RB, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS, Anchorage: AKR10H03Q, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS FY2019, Anchorage: AKR10H03M, minor, term to 2026-01-31
- BIRD CREEK, Bird Creek: AKR10H0UA, minor, term to 2026-01-31
- GWID TRANSMISSION LINE GIRDWOOD TO INDIAN, Girdwood: AKR10H104, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0Y6, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0YD, minor, term to 2031-01-31
- HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage: AKR10GI51, minor, term to 2026-01-31
- QUARTZ CREEK TRANSMISSION LINE REBUILD GIRDWOOD TO INDIAN, Anchorage: AKR10H0G0, minor, term to 2026-01-31
- SEWARD HIGHWAY MP 100 TO 105 IMPROVEMENTS, Girdwood: AKR10GE56, minor, term to 2021-01-31
What stands out
- Its term runs 2 years and 223 days, June 22, 2023 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HSIP SEWARD HIGHWAY ROCKFALL MITIGATION |
|---|---|
| Permittee | Jeremy Ingram - HI-TECH Rockfall Construction, lnc. |
| NPDES ID | AKR10GI41 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 22, 2023 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Anchorage, AK 99504 |
| Subwatershed | Turnagain Arm (HUC 190203020705) |
| NAICS | 237990 – Other Heavy and Civil Engineering Construction |
| SIC | 1542 – Nonresidential Construction |
NPDES AKR10GI41: effluent limits and exceedances
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION (NPDES AKR10GI41): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GI41: no pollutant row on file.
NPDES AKR10GI41: inspections, violations and enforcement
NPDES AKR10GI41 (HSIP SEWARD HIGHWAY ROCKFALL MITIGATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GI41
NPDES AKR10GI41: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GI41
NPDES AKR10GI41: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.