NPDES AKR10GI51 · Clean Water Act
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage, AK: NPDES AKR10GI51 discharge permit, effluent exceedances, inspections, penalties
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage, Alaska: General permit coverage AKR10GI51, held by Wolfgang Junge - AK DOT&PF; Construction stormwater; Effective; issued October 13, 2022, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 286 were issued before AKR10GI51. Wolfgang Junge - AK DOT&PF holds 7 permits in Alaska.
Other permits held by Wolfgang Junge - AK DOT&PF
- NEWTOK AIRPORT RELOCATION _2, Newtok: AKR10GM20, issued 2021-06-01
- FEMA - NOV 2018 EQ ER CLARK-WOLVERINE ROAD, Palmer: AKR10GN71, issued 2021-08-04
- ANC TAXILANES E1, E3 AND E G RECONSTRUCTION, Anchorage: AKR10GP79, issued 2022-09-16
- EAST HILL ROAD PAVEMENT PRESERVATION_2, Homer: AKR10GP80, issued 2023-05-08
- EAGLE RIVER LOOP PEDESTRIAN UNDERCROSSING-NOV 2018_2, Eagle River: AKR10GQ35, issued 2022-10-13
- AMATS CHUGACH FOOTHILL CONNECTOR PHASE II, Anchorage: AKR10GQ96, issued 2022-05-23
Coverages issued nearest AKR10GI51
- 2022-10-05: SITKA- KATLIAN BAY ROAD, Sitka: AKR10GB41, held by Joseph Williams - K&E Alaska, Inc.
- 2022-10-10: EAST HILL ROAD PAVEMENT PRESERVATION, Homer: AKR10GP77, held by Ken Griner - Southcentral Construction, Inc.
- 2022-10-10: WASHBURN STREET AREA RECLAMATION PROJECT, Anchorage: AKR10GR20, held by Shawn Casey - Bristol Prime Contractors, LLC
- 2022-10-11: EGEGIK CITY VEHICLE MAINTENANCE FACILITY, Egegik: AKR10H04N, held by Chris Smith, Bethel Contracting LLC
- 2022-10-12: LAKE LOUISE ROAD RESURFACING _2, Glennallen: AKR10GO64, held by Joe Kemp - Alaska DOT&PF Northern Region
- 2022-10-13: STERLING HIGHWAY MP 45-60 SUNRISE TO SKILAK LAKE _2, Cooper Landing: AKR10GL54, held by Wolfgang Junge
- 2022-10-13: EAGLE RIVER LOOP PEDESTRIAN UNDERCROSSING-NOV 2018_2, Eagle River: AKR10GQ35, held by Wolfgang Junge - AK DOT&PF
- 2022-10-14: LAKE LOUISE ROAD RESURFACING, Glennallen: AKR10GO60, held by Kodi Long - Qayaq Construction, LLC
- 2022-10-14: EAGLE RIVER LOOP PEDESTRIAN UNDERCROSSING-NOV 2018, Eagle River: AKR10GQ33, held by Mark Erickson - Mass Excavation, Inc.
- 2022-10-14: CAMPBELL WOODS SUBDIVISION IMPROVEMENTS PH IV, Anchorage: AKR10H011, held by Derek Betts, Granite Construction Company
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION among its neighbors
19 discharge permits are in the Turnagain Arm subwatershed (HUC 190203020705); AKR10GI51 is one. Its county: 555, 4 major; AKR10GI51 is minor permit.
Other permits in the Turnagain Arm subwatershed (HUC 190203020705)
- ALPINE VIEW CHALETS, Girdwood: AKR10H0RB, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS, Anchorage: AKR10H03Q, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS FY2019, Anchorage: AKR10H03M, minor, term to 2026-01-31
- BIRD CREEK, Bird Creek: AKR10H0UA, minor, term to 2026-01-31
- GWID TRANSMISSION LINE GIRDWOOD TO INDIAN, Girdwood: AKR10H104, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0Y6, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0YD, minor, term to 2031-01-31
- HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage: AKR10GI41, minor, term to 2026-01-31
- QUARTZ CREEK TRANSMISSION LINE REBUILD GIRDWOOD TO INDIAN, Anchorage: AKR10H0G0, minor, term to 2026-01-31
- SEWARD HIGHWAY MP 100 TO 105 IMPROVEMENTS, Girdwood: AKR10GE56, minor, term to 2021-01-31
What stands out
- Its term runs 3 years and 110 days, October 13, 2022 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HSIP SEWARD HIGHWAY ROCKFALL MITIGATION |
|---|---|
| Permittee | Wolfgang Junge - AK DOT&PF |
| NPDES ID | AKR10GI51 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 13, 2022 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Anchorage, AK 99504 |
| Subwatershed | Turnagain Arm (HUC 190203020705) |
NPDES AKR10GI51: effluent limits and exceedances
HSIP SEWARD HIGHWAY ROCKFALL MITIGATION (NPDES AKR10GI51): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GI51: no pollutant row on file.
NPDES AKR10GI51: inspections, violations and enforcement
NPDES AKR10GI51 (HSIP SEWARD HIGHWAY ROCKFALL MITIGATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GI51
NPDES AKR10GI51: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GI51
NPDES AKR10GI51: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.