NPDES AKR10GI48 · Clean Water Act
DALTON HIGHWAY FIBER OPTIC CABLE REHABILITATION, Coldfoot, AK: NPDES AKR10GI48 discharge permit, effluent exceedances, inspections, penalties
DALTON HIGHWAY FIBER OPTIC CABLE REHABILITATION, Coldfoot, Alaska: General permit coverage AKR10GI48, held by Matt Peterson - Quintillion Networks, LLC; Construction stormwater; Administratively continued; issued April 27, 2021, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 74 were issued before AKR10GI48.
Coverages issued nearest AKR10GI48
- 2021-04-19: GIL ACCESS ROAD IMPROVEMENTS_2, Fairbanks: AKR10GK85, held by Fairbanks Gold Mining, Inc.
- 2021-04-21: DILLINGHAM DOWNTOWN STREETS REHABILITATION_3, Dillingham: AKR10GF59, held by AK DOT&PF
- 2021-04-22: KOTZEBUE AIRPORT SUPPORT SITES, Kotzebue: AKR10GJ81, held by COLASKA, INC. dba QAP
- 2021-04-22: CCS EARLY LEARNING, Wasilla: AKR10GK96, held by F-E Contracting, Inc.
- 2021-04-27: SEWARD HWY PASSING LANES MP 37-52 PAVEMENT PRESERV, Cooper Landing: AKR10GF58, held by AK DOT&PF
- 2021-04-28: FTG218D MISSILE FIELD 4, CP04 MISSILE FIELD INFRA, Fort Greely: AKR10FY63, held by Neeser Construction Inc
- 2021-04-30: DENALI HWY MP 25 ROCK CR. BRIDGE REPLACEMENT, Gakona: AKR10GL25, held by Tutka, LLC
- 2021-05-01: KING SUB - 91ST AVE A ST, Anchorage: AKR10ES73, held by David Hartman - Hartman Construction and Equipment
- 2021-05-02: DENALI HIGHWAY MP 25 ROCK CREEK BRIDGE REPLACEMENT, Gakona: AKR10GL28, held by Alaska DOT&PF Northern Region
- 2021-05-03: HAMILTON SUBDIVISION, Eagle River: AKR10FS52, held by Andre Spinelli - Spinell Homes, Inc.
DALTON HIGHWAY FIBER OPTIC CABLE REHABILITATION among its neighbors
Its county: 111, 0 major; AKR10GI48 is minor permit.
Other permits in the county
- ALAN R. NEWBY SR / LITTLE BOULDER CREEK, Unknown: AKG370430, minor, term to 2010-10-07
- ARMSTRONG NOLAN CREEK MINE SITE, Bettles: AKG370D89, minor, term to 2026-02-28
- BARRY L. CLAY / SWIFT CREEK (SETTLING POND), Unknown: AKG370384, minor, term to 2010-10-07
- BARRY LAMBETH / JENNI CREEK, Unknown: AKG370574, minor, term to 2005-10-03
- BEATON PATH NUGGET CREEK MINE SITE, Circle: AKG370A31, minor, term to 2014-10-31
- BENNETT LONG CREEK DRAINAGE MINE SITE, Ruby: AKG370C88, minor, term to 2020-07-31
- BLACKWELL K-12 RENOVATION PHASE 1, Anvik: AKR10H0QZ, minor, term to 2026-01-31
- BOREAL RESOURCES INC / JIM PUP CREEK, Unknown: AKG370404, minor, term to 2014-10-31
- BRADY GOLD DUST CREEK MINE SITE, Central: AKG370C44, minor, term to 2020-07-31
- CHALKYITSIK AIRPORT IMPROVEMENTS, Chalkyitsik: AKR10H0HK, minor, term to 2026-01-31
What stands out
- Its term runs 4 years and 279 days, April 27, 2021 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DALTON HIGHWAY FIBER OPTIC CABLE REHABILITATION |
|---|---|
| Permittee | Matt Peterson - Quintillion Networks, LLC |
| NPDES ID | AKR10GI48 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 27, 2021 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Coldfoot, AK 99701 |
NPDES AKR10GI48: effluent limits and exceedances
DALTON HIGHWAY FIBER OPTIC CABLE REHABILITATION (NPDES AKR10GI48): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GI48: no pollutant row on file.
NPDES AKR10GI48: inspections, violations and enforcement
NPDES AKR10GI48 (DALTON HIGHWAY FIBER OPTIC CABLE REHABILITATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GI48
NPDES AKR10GI48: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GI48
NPDES AKR10GI48: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.