NPDES AKR10GL28 · Clean Water Act
DENALI HIGHWAY MP 25 ROCK CREEK BRIDGE REPLACEMENT, Gakona, AK: NPDES AKR10GL28 discharge permit, effluent exceedances, inspections, penalties
DENALI HIGHWAY MP 25 ROCK CREEK BRIDGE REPLACEMENT, Gakona, Alaska: General permit coverage AKR10GL28, held by Alaska DOT&PF Northern Region; Construction stormwater; Effective; issued May 2, 2021, term to January 31, 2026, by ADEC; discharges to Delta River; Rock Creek; Wetlands.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 79 were issued before AKR10GL28. Alaska DOT&PF Northern Region holds 8 permits in Alaska.
Other permits held by Alaska DOT&PF Northern Region
- RICHARDSON HWY MP 159-167 RECONSTRUCTION _2, Delta Junction: AKR10GF97, issued 2021-03-02
- STEESE HIGHWAY CHENA HOT SPRINGS ROAD RAMP TERMINI_2, Fairbanks: AKR10GH54, issued 2021-04-15
- PARKS HIGHWAY MP 315 LITTLE GOLDSTREAM BRIDGE _2, Nenana: AKR10GK07, issued 2021-03-09
- 3RD STREET WIDENING, Fairbanks: AKR10GK30, issued 2021-03-25
- GROWDEN AREA ACCESSIBILITY IMPROVEMENTS, Fairbanks: AKR10GN55, issued 2021-07-22
- GULKANA RIVER BOAT LAUNCH, Gakona: AKR10GO21, issued 2021-08-23
- RICHARDSON HIGHWAY MP 298 REVETMENT, Salcha: AKR10GP56, issued 2022-03-22
Coverages issued nearest AKR10GL28
- 2021-04-27: SEWARD HWY PASSING LANES MP 37-52 PAVEMENT PRESERV, Cooper Landing: AKR10GF58, held by AK DOT&PF
- 2021-04-27: DALTON HIGHWAY FIBER OPTIC CABLE REHABILITATION, Coldfoot: AKR10GI48, held by Matt Peterson - Quintillion Networks, LLC
- 2021-04-28: FTG218D MISSILE FIELD 4, CP04 MISSILE FIELD INFRA, Fort Greely: AKR10FY63, held by Neeser Construction Inc
- 2021-04-30: DENALI HWY MP 25 ROCK CR. BRIDGE REPLACEMENT, Gakona: AKR10GL25, held by Tutka, LLC
- 2021-05-01: KING SUB - 91ST AVE A ST, Anchorage: AKR10ES73, held by David Hartman - Hartman Construction and Equipment
- 2021-05-03: HAMILTON SUBDIVISION, Eagle River: AKR10FS52, held by Andre Spinelli - Spinell Homes, Inc.
- 2021-05-07: MULDOON ROAD OVERHEAD TO UNDERGROUND CONVERSION_3, Anchorage: AKR10GH77, held by Yelena Saville - Chugach Electric Association
- 2021-05-07: SANDHILL RESERVE_3, Anchorage: AKR10GJ50, held by Jacob Petersen - Merit Homes. LLC
- 2021-05-10: BNC SAND PIT, Bethel: AKR10FL23, held by Stephen Walsh - Faulkner Walsh Constructors
- 2021-05-12: JUMBO DOME ROAD CORRIDOR, Healy: AKR10DY05, held by Rich Sivils - Usibelli Coal Mine
DENALI HIGHWAY MP 25 ROCK CREEK BRIDGE REPLACEMENT among its neighbors
Its county: 61, 3 major; AKR10GL28 is minor permit.
Other permits in the county
- 60 NORTH SEAFOODS, Cordova: AKNOE0305, minor, term to 2027-06-05
- ABLES SUBDIVISION BLOCK 2 LOTS 1234, Glenallen: AKR10FW83, minor, term to 2026-01-31
- ALASKA AIRLINES CORDOVA STATION, Cordova: AKR06AC12, minor, term to 2020-03-31
- ALASKA WILD SEAFOOD PARTNERS LLC, Cordova: AKNOE0300, minor, term to 2027-04-20
- ALASKA WILD SEAFOOD PARTNERS, LLC, Cordova: AKG521008, minor, term to 2027-05-31
- ALYESKA - TAPS - RGV 125 AREA PIPING INTEGRITY MONITORING AT PLMP 794.2, Valdez: AKG002346, minor, term to 2024-09-30
- CITY OF VALDEZ HOUSING & INFRASTRUCTURE PROJECT, Valdez: AKR10H001, minor, term to 2026-01-31
- CORDOVA FIBER TO THE HOME, Cordova: AKR10H0PK, minor, term to 2026-01-31
- CROWLEY FUELS LLC VALDEZ FACILITY, Valdez: AKR06AC57, minor, term to 2025-03-31
- CVTC KLUTINA - EDGERTON HWY FTTH, Copper Center: AKR10GN88, minor, term to 2026-01-31
What stands out
- Its term runs 4 years and 274 days, May 2, 2021 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DENALI HIGHWAY MP 25 ROCK CREEK BRIDGE REPLACEMENT |
|---|---|
| Permittee | Alaska DOT&PF Northern Region |
| NPDES ID | AKR10GL28 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 2, 2021 |
| Expires | January 31, 2026 |
| Agency | ADEC |
| Address | Gakona, AK 99586 |
| Receiving water | Delta River; Rock Creek; Wetlands |
NPDES AKR10GL28: effluent limits and exceedances
DENALI HIGHWAY MP 25 ROCK CREEK BRIDGE REPLACEMENT (NPDES AKR10GL28): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GL28: no pollutant row on file.
NPDES AKR10GL28: inspections, violations and enforcement
NPDES AKR10GL28 (DENALI HIGHWAY MP 25 ROCK CREEK BRIDGE REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GL28
NPDES AKR10GL28: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GL28
NPDES AKR10GL28: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.