NPDES AKR10H0CS · Clean Water Act
ELLIOTT HIGHWAY MP 51-63 REHABILITATION, Livengood, AK: NPDES AKR10H0CS discharge permit, effluent exceedances, inspections, penalties
ELLIOTT HIGHWAY MP 51-63 REHABILITATION, Livengood, Alaska: General permit coverage AKR10H0CS, held by Katherine Keith; Construction stormwater; Effective; issued August 10, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 457 were issued before AKR10H0CS. Katherine Keith holds 40 permits in Alaska.
Other permits held by Katherine Keith
- DALTON HIGHWAY MP 289 TO 305 REHABILITATION _2, Deadhorse: AKR10GP96, issued 2023-11-30
- NOORVIK AIRPORT REHABILITATION, Noorvik: AKR10H00U, issued 2024-10-14
- SAINT MARY'S AIRPORT IMPROVEMENTS, St Mary'S: AKR10H051, issued 2024-10-25
- NENANA-TOTCHAKET RD, Nenana: AKR10H05A, issued 2025-06-26
- RICHARDON HWY MP 359 RAILROAD GRADE SEPERATED FACILITY & RICHARDSON HWY MP 357-3, Fairbanks: AKR10H05U, issued 2023-03-03
- DALTON HIGHWAY MP 18-37 RECONSTRUCTION, Livengood: AKR10H06G, issued 2023-03-24
- ALASKA HIGHWAY PASSING LANES MP 1330-1400, Tok: AKR10H07D, issued 2024-08-15
- GLENN HWY PARKS TO S. INNER SPRINGER LOOP (PHASE II), Palmer: AKR10H0DN, issued 2026-03-02
- MARSHALL AIRPORT IMPROVEMENTS, Marshall: AKR10H0GC, issued 2024-04-02
- OLD STEESE HIGHWAY SHOULDER WIDENING, Fairbanks: AKR10H0GH, issued 2024-04-10
Coverages issued nearest AKR10H0CS
- 2023-08-07: TRACT 1A WOLFGLEN ROAD CONSTRUCTION, Talkeetna: AKR10H0CE, held by Sloan Sunderland
- 2023-08-08: OLD MATANUSKA TOWNHOUSE DEVELOPMENT PHII, Wasilla: AKR10H0CJ, held by Aren Schurosky
- 2023-08-09: DEDICATED MATERIAL DISPOSAL SITE FOR AMATS: HILAND RD MP 0 TO 3.2 PAVEMENT PRESE, Eagle River: AKR10H0CL, held by Ken Griner
- 2023-08-09: ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420, Livengood: AKR10H0CM, held by Kodi Long
- 2023-08-10: DEDICATED MATERIAL DISPOSAL SITE FOR AMATS: HILAND RD MP 0 TO 3.2 PAVEMENT PRESE, Eagle River: AKR10H0CR, held by Daniel Janke
- 2023-08-10: 100TH AVE SURFACE REHABILITATION MINNESOTA DR TO VICTOR RD., Anchorage: AKR10H0CT, held by Justin Shields
- 2023-08-10: 35 MILE ORV, Juneau: AKR10H0CW, held by George Schaaf
- 2023-08-10: 100TH AVE SURFACE REHABILITATION MINNESOTA DR TO VICTOR RD, Anchorage: AKR10H0CX, held by Melinda Kohlhaas
- 2023-08-11: ZODIAK MANOR DRAINAGE IMPROVEMENT PROJECT, Anchorage: AKR10GN60, held by Shay Throop
- 2023-08-17: COPPER RIVER BOAT LAUNCH FACILITIES IMPROVEMENTS (FLAP), Chitina: AKR10H0D5, held by Royce Drennon
ELLIOTT HIGHWAY MP 51-63 REHABILITATION among its neighbors
Its county: 111, 0 major; AKR10H0CS is minor permit.
Other permits in the county
- ALAN R. NEWBY SR / LITTLE BOULDER CREEK, Unknown: AKG370430, minor, term to 2010-10-07
- ARMSTRONG NOLAN CREEK MINE SITE, Bettles: AKG370D89, minor, term to 2026-02-28
- BARRY L. CLAY / SWIFT CREEK (SETTLING POND), Unknown: AKG370384, minor, term to 2010-10-07
- BARRY LAMBETH / JENNI CREEK, Unknown: AKG370574, minor, term to 2005-10-03
- BEATON PATH NUGGET CREEK MINE SITE, Circle: AKG370A31, minor, term to 2014-10-31
- BENNETT LONG CREEK DRAINAGE MINE SITE, Ruby: AKG370C88, minor, term to 2020-07-31
- BLACKWELL K-12 RENOVATION PHASE 1, Anvik: AKR10H0QZ, minor, term to 2026-01-31
- BOREAL RESOURCES INC / JIM PUP CREEK, Unknown: AKG370404, minor, term to 2014-10-31
- BRADY GOLD DUST CREEK MINE SITE, Central: AKG370C44, minor, term to 2020-07-31
- CHALKYITSIK AIRPORT IMPROVEMENTS, Chalkyitsik: AKR10H0HK, minor, term to 2026-01-31
What stands out
- Its term runs 2 years and 174 days, August 10, 2023 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ELLIOTT HIGHWAY MP 51-63 REHABILITATION |
|---|---|
| Permittee | Katherine Keith |
| NPDES ID | AKR10H0CS |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 10, 2023 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Livengood, AK 99790 |
NPDES AKR10H0CS: effluent limits and exceedances
ELLIOTT HIGHWAY MP 51-63 REHABILITATION (NPDES AKR10H0CS): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H0CS: no pollutant row on file.
NPDES AKR10H0CS: inspections, violations and enforcement
NPDES AKR10H0CS (ELLIOTT HIGHWAY MP 51-63 REHABILITATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H0CS
NPDES AKR10H0CS: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H0CS
NPDES AKR10H0CS: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.