NPDES AKR10H0CM · Clean Water Act
ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420, Livengood, AK: NPDES AKR10H0CM discharge permit, effluent exceedances, inspections, penalties
ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420, Livengood, Alaska: General permit coverage AKR10H0CM, held by Kodi Long; Construction stormwater; Effective; issued August 9, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation; Highway, Street, and Bridge Construction.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 455 were issued before AKR10H0CM. Kodi Long holds 8 permits in Alaska.
Other permits held by Kodi Long
- RUSSIAN RIVER CAMPGROUND ACCESS PHASE 2, Cooper Landing: AKR10H062, issued 2024-10-24
- CURRY QUARRY BALLAST PRODUCTION - 2023, Curry: AKR10H07Y, issued 2023-10-25
- ALASKA HIGHWAY MP 1235-1268 REHABILITATION (CONST MP 1252-1268), Northway: AKR10H0NJ, issued 2025-07-11
- RUBY SLOUGH ROAD REHABILITATION, Ruby: AKR10H0UL, issued 2025-05-26
- RUBY SLOUGH ROAD CONTRACTOR-PROVIDED SUPPORT SITES, Ruby: AKR10H0UM, issued 2025-05-26
- DALTON HIGHWAY MP 90-104 RESURFACING, Fairbanks: AKR10H0X2, issued 2025-11-05
- ELLIOTT HIGHWAY MP 43-51 RESURFACING, Livwengood: AKR10H149, issued 2026-06-02
Coverages issued nearest AKR10H0CM
- 2023-08-02: MTA FTTX FIRE LAKE WO 694-32592, Eagle River: AKR10H0C5, held by Robbie Nash
- 2023-08-03: SANDHILL 38, Anchorage: AKR10H0C9, held by Ashley Plooy
- 2023-08-07: TRACT 1A WOLFGLEN ROAD CONSTRUCTION, Talkeetna: AKR10H0CE, held by Sloan Sunderland
- 2023-08-08: OLD MATANUSKA TOWNHOUSE DEVELOPMENT PHII, Wasilla: AKR10H0CJ, held by Aren Schurosky
- 2023-08-09: DEDICATED MATERIAL DISPOSAL SITE FOR AMATS: HILAND RD MP 0 TO 3.2 PAVEMENT PRESE, Eagle River: AKR10H0CL, held by Ken Griner
- 2023-08-10: DEDICATED MATERIAL DISPOSAL SITE FOR AMATS: HILAND RD MP 0 TO 3.2 PAVEMENT PRESE, Eagle River: AKR10H0CR, held by Daniel Janke
- 2023-08-10: ELLIOTT HIGHWAY MP 51-63 REHABILITATION, Livengood: AKR10H0CS, held by Katherine Keith
- 2023-08-10: 100TH AVE SURFACE REHABILITATION MINNESOTA DR TO VICTOR RD., Anchorage: AKR10H0CT, held by Justin Shields
- 2023-08-10: 35 MILE ORV, Juneau: AKR10H0CW, held by George Schaaf
- 2023-08-10: 100TH AVE SURFACE REHABILITATION MINNESOTA DR TO VICTOR RD, Anchorage: AKR10H0CX, held by Melinda Kohlhaas
ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420 among its neighbors
Its county: 111, 0 major; AKR10H0CM is minor permit.
Other permits in the county
- ALAN R. NEWBY SR / LITTLE BOULDER CREEK, Unknown: AKG370430, minor, term to 2010-10-07
- ARMSTRONG NOLAN CREEK MINE SITE, Bettles: AKG370D89, minor, term to 2026-02-28
- BARRY L. CLAY / SWIFT CREEK (SETTLING POND), Unknown: AKG370384, minor, term to 2010-10-07
- BARRY LAMBETH / JENNI CREEK, Unknown: AKG370574, minor, term to 2005-10-03
- BEATON PATH NUGGET CREEK MINE SITE, Circle: AKG370A31, minor, term to 2014-10-31
- BENNETT LONG CREEK DRAINAGE MINE SITE, Ruby: AKG370C88, minor, term to 2020-07-31
- BLACKWELL K-12 RENOVATION PHASE 1, Anvik: AKR10H0QZ, minor, term to 2026-01-31
- BOREAL RESOURCES INC / JIM PUP CREEK, Unknown: AKG370404, minor, term to 2014-10-31
- BRADY GOLD DUST CREEK MINE SITE, Central: AKG370C44, minor, term to 2020-07-31
- CHALKYITSIK AIRPORT IMPROVEMENTS, Chalkyitsik: AKR10H0HK, minor, term to 2026-01-31
What stands out
- Its term runs 2 years and 175 days, August 9, 2023 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420 |
|---|---|
| Permittee | Kodi Long |
| NPDES ID | AKR10H0CM |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 9, 2023 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Livengood, AK 99790 |
| NAICS | 237310 – Highway, Street, and Bridge Construction |
NPDES AKR10H0CM: effluent limits and exceedances
ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420 (NPDES AKR10H0CM): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H0CM: no pollutant row on file.
NPDES AKR10H0CM: inspections, violations and enforcement
NPDES AKR10H0CM (ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H0CM
NPDES AKR10H0CM: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H0CM
NPDES AKR10H0CM: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.