NPDES ALR10C4PE · Clean Water Act
GREENPOND - CITIZENS WATER SYSTEM INTERCONNECTION, Woodstock, AL: NPDES ALR10C4PE discharge permit, effluent exceedances, inspections, penalties
GREENPOND - CITIZENS WATER SYSTEM INTERCONNECTION, Woodstock, Alabama: General permit coverage ALR10C4PE, held by Greenpond Water System; Construction stormwater; Effective; issued December 14, 2023, term to March 31, 2026, by State.
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 4,555 were issued before ALR10C4PE.
Coverages issued nearest ALR10C4PE
- 2023-12-13: STATOM ROAD & CHISHOLM ROAD SITE, Florence: ALR10C4L7, held by Oakley Land Company, LLC
- 2023-12-13: SANCA LANE, Silverhill: ALR10C4P4, held by Cummans Construction, Inc
- 2023-12-13: THE PRESERVE PHASE 6, Auburn: ALR10C4P6, held by 68 Ventures, LLC
- 2023-12-14: HOOPER DEVELOPMENT - EXIT 299, Hanceville: ALR10C4P9, held by Hooper Enterprises of Cullman, LLC
- 2023-12-14: STEEPLECHASE, Athens: ALR10C4PA, held by Jimmy Bryan Construction
- 2023-12-14: PHOENIX SOUTH POINTE, Orange Beach: ALR10C4PF, held by Phoenix South Point, LLC
- 2023-12-15: MCVAY PHASE 11 ELDERBERRY LANE, Spanish Ft: ALR10C4PL, held by McVay Construction Company Inc
- 2023-12-19: JORDAN ROAD SMALL BAY INDUSTRIAL, Huntsville: ALR10C4HG, held by Twenty Lake Holdings, LLC
- 2023-12-19: EMERALD RIDGE, Calera: ALR10C4PQ, held by Adams Homes, LLC
- 2023-12-19: SAMFORD FRESHMAN HOUSING, Homewood: ALR10C4PS, held by Robins & Morton
GREENPOND - CITIZENS WATER SYSTEM INTERCONNECTION among its neighbors
16 discharge permits are in the Caffee Creek subwatershed (HUC 031502020406); ALR10C4PE is one. Its county: 543, 4 major; ALR10C4PE is minor permit.
Other permits in the Caffee Creek subwatershed (HUC 031502020406)
- ACSTPAA-0007(549) PS 2079, Tuscaloosa: ALR10C1MW, minor, term to 2026-03-31
- ALABAMA PIGMENTS COMPANY, LLC, Mccalla: AL0081507, minor, term to 2023-02-28
- BAMA CONCRETE BIRMINGHAM WOODSTOCK PLANT, Woodstock: ALG110299, minor, term to 2022-08-31
- BLOCTON - CENTREVILLE 46KV TIE LINE, West Blocton: ALR10AY86, minor, term to 2016-03-31
- HIGHWAY 11 RECYCLING, Woodstock: ALG180819, minor, term to 2017-09-30
- RIVER BEND, West Blocton: ALR163783, minor, term to 2012-05-04
- THYSSENKRUPP MATERIALS WOODSTOCK, Woodstock: ALR10BHP8, minor, term to 2021-03-31
- TOWN OF WEST BLOCTON, West Blocton: ALL074195, minor, term to 2025-12-31
- VANCE SS-MERCEDES BATTERY PLANT 115KV TL, Vance: ALR10C0DM, minor, term to 2021-03-31
- WASTE RECOVERY SITE NO. 1, West Blocton: AL0074829, minor, term to 2012-09-30
What stands out
- Its term runs 2 years and 107 days, December 14, 2023 to March 31, 2026; the term ended 168 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GREENPOND - CITIZENS WATER SYSTEM INTERCONNECTION |
|---|---|
| Permittee | Greenpond Water System |
| NPDES ID | ALR10C4PE |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 14, 2023 |
| Expires | March 31, 2026 |
| Agency | State |
| Address | Woodstock, AL 35188 |
| Subwatershed | Caffee Creek (HUC 031502020406) |
NPDES ALR10C4PE: effluent limits and exceedances
GREENPOND - CITIZENS WATER SYSTEM INTERCONNECTION (NPDES ALR10C4PE): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10C4PE: no pollutant row on file.
NPDES ALR10C4PE: inspections, violations and enforcement
NPDES ALR10C4PE (GREENPOND - CITIZENS WATER SYSTEM INTERCONNECTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10C4PE
NPDES ALR10C4PE: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10C4PE
NPDES ALR10C4PE: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.