PHOENIX SOUTH POINTE, Orange Beach, AL: NPDES ALR10C4PF discharge permit, effluent exceedances, inspections, penalties
PHOENIX SOUTH POINTE, Orange Beach, Alabama: General permit coverage ALR10C4PF, held by Phoenix South Point, LLC; Construction stormwater; Administratively continued; issued December 14, 2023, term to March 31, 2026, by State.
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 4,555 were issued before ALR10C4PF.
Coverages issued nearest ALR10C4PF
- 2023-12-13: SANCA LANE, Silverhill: ALR10C4P4, held by Cummans Construction, Inc
- 2023-12-13: THE PRESERVE PHASE 6, Auburn: ALR10C4P6, held by 68 Ventures, LLC
- 2023-12-14: HOOPER DEVELOPMENT - EXIT 299, Hanceville: ALR10C4P9, held by Hooper Enterprises of Cullman, LLC
- 2023-12-14: STEEPLECHASE, Athens: ALR10C4PA, held by Jimmy Bryan Construction
- 2023-12-14: GREENPOND - CITIZENS WATER SYSTEM INTERCONNECTION, Woodstock: ALR10C4PE, held by Greenpond Water System
- 2023-12-15: MCVAY PHASE 11 ELDERBERRY LANE, Spanish Ft: ALR10C4PL, held by McVay Construction Company Inc
- 2023-12-19: JORDAN ROAD SMALL BAY INDUSTRIAL, Huntsville: ALR10C4HG, held by Twenty Lake Holdings, LLC
- 2023-12-19: EMERALD RIDGE, Calera: ALR10C4PQ, held by Adams Homes, LLC
- 2023-12-19: SAMFORD FRESHMAN HOUSING, Homewood: ALR10C4PS, held by Robins & Morton
- 2023-12-19: THE RANCHES AT SHELBY LAKES-LOT 13, Shelby: ALR10C4PU, held by Bess Homes & Enterprises, LLC
PHOENIX SOUTH POINTE among its neighbors
88 discharge permits are in the Perdido Pass-Frontal Gulf of Mexico subwatershed (HUC 031401070204); ALR10C4PF is one. Its county: 1,240, 6 major; ALR10C4PF is minor permit.
Other permits in the Perdido Pass-Frontal Gulf of Mexico subwatershed (HUC 031401070204)
- ABACO ORANGE BEACH, Orange Beach: ALR10C3QC, minor, term to 2026-03-31
- ABBEY ROAD, Orange Beach: ALR10C5TL, minor, term to 2026-03-31
- ABC NEW WAREHOUSE, Orange Beach: ALR10C7CU, minor, term to 2026-03-31
- ABERDEEN VILLAS, Gulf Shores: ALR10BH02, minor, term to 2026-03-31
- AMBER ISLE, Orange Beach: ALR108840, minor, term to 2016-03-31
- ATLAS CONDOMINIUM, Orange Beach: ALR10C1ZF, minor, term to 2026-03-31
- AU-GULF COAST ENGINEERING RESEARCH STATION, Orange Beach: ALR10C6W6, minor, term to 2026-03-31
- BEACH WALKING DISTRICT IMPROVEMENTS, Gulf Shores: ALR10C037, minor, term to 2021-03-31
- BINGER, Orange Beach: ALR10C6W1, minor, term to 2026-03-31
- BP-ST-002-180-016 PS1873, Orange Beach: ALR10BEYA, minor, term to 2021-03-31
What stands out
- Its term runs 2 years and 107 days, December 14, 2023 to March 31, 2026; the term ended 168 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PHOENIX SOUTH POINTE |
|---|---|
| Permittee | Phoenix South Point, LLC |
| NPDES ID | ALR10C4PF |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 14, 2023 |
| Expires | March 31, 2026 |
| Agency | State |
| Address | Orange Beach, AL 36561 |
| Subwatershed | Perdido Pass-Frontal Gulf of Mexico (HUC 031401070204) |
NPDES ALR10C4PF: effluent limits and exceedances
PHOENIX SOUTH POINTE (NPDES ALR10C4PF): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10C4PF: no pollutant row on file.
NPDES ALR10C4PF: inspections, violations and enforcement
NPDES ALR10C4PF (PHOENIX SOUTH POINTE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10C4PF
NPDES ALR10C4PF: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10C4PF
NPDES ALR10C4PF: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.