NPDES AZR10I0PO · Clean Water Act
NA-17-W14 TUBA CITY FAILED DRAINFIELDS, Tuba City, AZ: NPDES AZR10I0PO discharge permit, effluent exceedances, inspections, penalties
NA-17-W14 TUBA CITY FAILED DRAINFIELDS, Tuba City, Arizona: General permit coverage AZR10I0PO, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Administratively continued; issued August 3, 2021, term to February 15, 2022, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 66 were issued before AZR10I0PO. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I0PO
- 2021-06-21: N71 BIRDSPRINGS, AZ, Birdsprings: AZR10I0OY, held by Navajo Division of Transportation
- 2021-06-24: N71(3)2&4 BIRDSPRINGS, AZ., Birdsprings: AZR10I0P5, held by BIA, NRDOT, DIVISION OF TRANPORTATION
- 2021-07-21: NA-18-U69 RAM PASTURES CISTERNS, Del Muerto: AZR10I0PC, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-07-21: NA-17-W14, TUBA CITY FAILED DRAINFIELD, Tuba City: AZR10I0PH, held by Navajo Area Indian Health Service
- 2021-08-03: NA-18-U43/XR6 PINON SCATTERED, Pinon: AZR10I0PM, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-09-03: TUBA CITY SCATTERED HOUSING 2017 (F54), Tuba City: AZR10I0PX, held by Navajo Area Indian Health Service
- 2021-09-08: SRP - NGS RETIREMENT POND CLOSURE, Page: AZR10I0Q3, held by Patrick Shaw
- 2021-09-08: SRP - NGS RETIREMENT LANDFILL CLOSURE, Page: AZR10I0Q5, held by Patrick Shaw
- 2021-09-13: NA-20-LB8 CHILCHINBETO YOUNG SCATTERED CISTERNS, Chilchinbeto: AZR10I0Q9, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-09-27: TWENTY (20) PUBLIC RENTAL DWELLING HOUSING UNITS, Winslow: AZR10I0QD, held by LAM Corporation
NA-17-W14 TUBA CITY FAILED DRAINFIELDS among its neighbors
37 discharge permits are in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004); AZR10I0PO is one.
Other permits in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004)
- MOENKOPI WASH DRAINAGE IMPROVEMENTS, Tuba City: AZR10I1DN
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, minor, term to 2022-02-15
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXT, Tuba City: AZR10I0WH, minor, term to 2027-02-16
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXTENSIONS, Cameron: AZR10I0WX, minor, term to 2027-02-16
- NA-17-U03 GAP WASH CROSSING PHASE 2, The Gap: AZR10I0ZA, minor, term to 2027-02-16
- NA-17-U03, GAP WASH CROSSINGS, PHASE 2, Tuba City: AZR10I0Z5, minor, term to 2027-02-16
- NA-17-W14, TUBA CITY FAILED DRAINFIELD, Tuba City: AZR10I0PH, minor, term to 2022-02-15
- NA-17-XP2, COALMINE CANYON GOLDSPRINGS EXT, PHASE 1, Tuba City: AZR10I16S, minor, term to 2027-02-16
- NA-17-XQ2 GAP WASH CROSSING PHASE 1, Gap: AZR10I0ZB, minor, term to 2027-02-16
- NA-17-XQ2, GAP WASH CROSSINGS, PHASE 1, Tuba City: AZR10I0Z6, minor, term to 2027-02-16
What stands out
- Its term runs 196 days, August 3, 2021 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-17-W14 TUBA CITY FAILED DRAINFIELDS |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0PO |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 3, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Tuba City, AZ 86045 |
| Subwatershed | Kerley Valley-Moenkopi Wash (Local Drainage) (HUC 150200181004) |
NPDES AZR10I0PO: effluent limits and exceedances
NA-17-W14 TUBA CITY FAILED DRAINFIELDS (NPDES AZR10I0PO): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I0PO: no pollutant row on file.
NPDES AZR10I0PO: inspections, violations and enforcement
NPDES AZR10I0PO (NA-17-W14 TUBA CITY FAILED DRAINFIELDS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I0PO
NPDES AZR10I0PO: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I0PO
NPDES AZR10I0PO: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.