Clean Water Act discharge permit · NPDES AZR10I0ZB
NA-17-XQ2 GAP WASH CROSSING PHASE 1, Gap, AZ: NPDES AZR10I0ZB discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
NA-17-XQ2 GAP WASH CROSSING PHASE 1, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY, holds NPDES permit AZR10I0ZB. EPA’s file records it issued May 2, 2023 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for NA-17-XQ2 GAP WASH CROSSING PHASE 1: its NPDES ID, its permit type and status, its dates, its address in Gap, Arizona. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES AZR10I0ZB.
What stands out
- Its term runs 3 years and 290 days, May 2, 2023 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | NA-17-XQ2 GAP WASH CROSSING PHASE 1 |
|---|---|
| Permittee as filed | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0ZB |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | May 2, 2023 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Gap, AZ 86020 |
| Subwatershed | Kerley Valley-Moenkopi Wash (Local Drainage) (HUC 150200181004) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES AZR10I0ZB.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES AZR10I0ZB.
Inspections
EPA’s inspection file holds no inspection for NPDES AZR10I0ZB.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES AZR10I0ZB.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, AZR10I0ZB.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID AZR10I0ZB there.
NA-17-XQ2 GAP WASH CROSSING PHASE 1, Gap, Arizona: Coverage under a general permit AZR10I0ZB, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued May 2, 2023, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 160 were issued before AZR10I0ZB. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I0ZB
- 2023-04-24: FREMONT ROAD AND DUNES ROAD EXTENSION PHASE 2, Mohave Valley: AZR10I0Z0, held by McCormick Construction Company
- 2023-04-26: JOURNEY TO RECOVERY (JTR) RESIDENTIAL TREATMENT FACILITY, Scottsdale: AZR10I0Z4, held by Kitchell Contractors Inc., of AZ
- 2023-04-27: NA-17-U03, GAP WASH CROSSINGS, PHASE 2, Tuba City: AZR10I0Z5, held by Navajo Area Indian Health Service
- 2023-04-27: NA-17-XQ2, GAP WASH CROSSINGS, PHASE 1, Tuba City: AZR10I0Z6, held by Navajo Area Indian Health Service
- 2023-05-02: NA-17-U03 GAP WASH CROSSING PHASE 2, The Gap: AZR10I0ZA, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-05-05: NA-20-LC9 FOREST LAKE CISTERN HOMES, Forest Lake: AZR10I0ZC, held by Navajo Area Indian Health Service
- 2023-05-05: NA-18-U62 MANY FARMS LAKE PHASE 4 CISTERNS, Many Farms: AZR10I0ZD, held by Navajo Area Indian Health Service
- 2023-05-09: NA-20-LE4 CHINLE SCATTERED CISTERNS, Chinle: AZR10I0ZE, held by Navajo Area Indian Health Service
- 2023-05-09: MANY FARMS MEDICAL REFERRAL NA-18-F73, Many Farms: AZR10I0ZF, held by Navajo Area Indian Health Service
- 2023-05-11: NA-20-LD6 RED VALLEY GRACE BEGAY W/L EXT CISTERNS, Red Valley: AZR10I0ZG, held by Navajo Area Indian Health Service
NA-17-XQ2 GAP WASH CROSSING PHASE 1 among its neighbors
37 discharge permits are in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004); AZR10I0ZB is one.
Other permits in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004)
- MOENKOPI WASH DRAINAGE IMPROVEMENTS, Tuba City: AZR10I1DN
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, minor, term to 2022-02-15
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXT, Tuba City: AZR10I0WH, minor, term to 2027-02-16
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXTENSIONS, Cameron: AZR10I0WX, minor, term to 2027-02-16
- NA-17-U03 GAP WASH CROSSING PHASE 2, The Gap: AZR10I0ZA, minor, term to 2027-02-16
- NA-17-U03, GAP WASH CROSSINGS, PHASE 2, Tuba City: AZR10I0Z5, minor, term to 2027-02-16
- NA-17-W14 TUBA CITY FAILED DRAINFIELDS, Tuba City: AZR10I0PO, minor, term to 2022-02-15
- NA-17-W14, TUBA CITY FAILED DRAINFIELD, Tuba City: AZR10I0PH, minor, term to 2022-02-15
- NA-17-XP2, COALMINE CANYON GOLDSPRINGS EXT, PHASE 1, Tuba City: AZR10I16S, minor, term to 2027-02-16
- NA-17-XQ2, GAP WASH CROSSINGS, PHASE 1, Tuba City: AZR10I0Z6, minor, term to 2027-02-16
Nearby on the register
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The NA-17-XQ2 GAP WASH CROSSING PHASE 1 permit is one of 2 storm water construction permits on EPA's NPDES register in Gap, this one included. It also sits among 37 NPDES permits in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed, this one included. The permit lists 0 pollutants under a numeric limit and 0 pollutants with an effluent exceedance.