ECUA - CENTRAL WATER RECLAMATION FACILITY, Cantonment, FL: NPDES FL0559351 discharge permit, effluent exceedances, inspections, penalties

ECUA - CENTRAL WATER RECLAMATION FACILITY, Cantonment, Florida: Individual permit FL0559351, held by Emerald Coast Utilities Authority; Publicly owned treatment works; Administratively continued; issued November 6, 2012, term to November 5, 2017, by Florida Department of Environmental Protection; discharges to International Paper?s Rainwater Tract wetland.

8 of the 16 pollutants listed for NPDES FL0559351 have no violation or effluent exceedance.

  • IC25 Static Renewal 7 Day Chronic Ceriodaphnia dubia: 4 limits, 15 violations of any kind, 15 effluent exceedances, latest July 31, 2018, largest 65% over the limit.
  • % of fecal coliform samples < detectable: 1 limit, 11 violations of any kind, 10 effluent exceedances, latest December 31, 2018, largest 33% over the limit.
  • Solids, total suspended: 1 limit, 1 violation of any kind, 1 effluent exceedance, latest April 30, 2016, largest 40% over the limit.
  • Nitrogen, total [as N]: 6 limits, 5 violations of any kind.
  • Phosphorous, in total orthophosphate: 4 limits, 4 violations of any kind.
  • Phosphorus, total [as P]: 6 limits, 2 violations of any kind.
  • Nitrogen, ammonia total [as N]: 5 limits, 2 violations of any kind.
  • Nitrite + Nitrate total [as N]: 4 limits, 2 violations of any kind.
  • BOD, carbonaceous [5 day, 20 C]: 4 limits.
  • IC25 Static Renewal 7 Day Chronic Chrpimephales: 4 limits.
  • pH: 3 limits.
  • Flow, in conduit or thru treatment plant: 2 limits.
  • Temperature, water deg. centigrade: 1 limit.
  • Ammonia, unionized: 1 limit.
  • Chlorine, total residual: 1 limit.
  • Coliform, fecal general: 1 limit.
  • October 3, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 18, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 17, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 7, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 5, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 2, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 1, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • August 22, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • August 15, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • August 6, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • July 10, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • June 12, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • June 5, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • June 3, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • May 28, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • May 26, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • May 19, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • May 13, 2026: WW SSO - Discharge to Waters (ST6).
  • May 10, 2026: WW SSO - Discharge to Waters (ST6).
  • April 4, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • April 3, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • March 10, 2026: Audit (S).
  • March 1, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • February 20, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • February 17, 2026: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • December 21, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • November 19, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • November 3, 2025: WW SSO - Discharge to Waters (ST6).
  • October 8, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • October 1, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 26, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 21, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • September 2, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • August 2, 2025: WW SSO - Discharge to Waters (ST6).
  • July 30, 2025: WW SSO - Discharge to Waters (ST6).
  • July 22, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • July 21, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • July 17, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • July 14, 2025: WW SSO - Discharge to Waters (ST6).
  • July 12, 2025: WW SSO - Discharge to Waters (ST6).
  • July 11, 2025: WW SSO - Discharge to Waters (ST6).
  • May 30, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • May 25, 2025: WW SSO - Discharge to Waters (ST6).
  • May 21, 2025: WW SSO - Discharge to Waters (ST6).
  • April 21, 2025: WW SSO - Discharge to Waters (ST6).
  • April 19, 2025: WW SSO - Discharge to Waters (ST6).
  • April 11, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • March 18, 2025: WW SSO - Discharge to Waters (ST6).
  • March 2, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • February 28, 2025: WW SSO - Overflow to Dry Land or Building Backup (ST6).
  • February 19, 2025: WW SSO - Discharge to Waters (ST6).

Florida holds 151 Publicly owned treatment works coverages of this permit type in EPA’s file; 11 were issued before FL0559351. Emerald Coast Utilities Authority holds 12 permits in Florida.

Other permits held by Emerald Coast Utilities Authority

Coverages issued nearest FL0559351

ECUA - CENTRAL WATER RECLAMATION FACILITY among its neighbors

67 discharge permits are in the Elevenmile Creek subwatershed (HUC 031401070101); FL0559351 is one. Its county: 333, 8 major; FL0559351 is major permit.

Other permits in the Elevenmile Creek subwatershed (HUC 031401070101)

What stands out

  • Its term runs 4 years and 364 days, November 6, 2012 to November 5, 2017; the term ended 3,236 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on October 3, 2026.
  • In the 365 days to September 15, 2026, it was dated 28 single-event violations, 1 inspection.
  • 3 of its 16 pollutants on file have an effluent exceedance (19%); 16 are under a numeric limit; the largest exceedance is IC25 Static Renewal 7 Day Chronic Ceriodaphnia dubia at 65% over its limit.
  • It is one of 23,564 discharge permits on the register in Florida; 151 of them (0.6%) are in its program, Publicly owned treatment works, and it is a major discharger.

Identity

FacilityECUA - CENTRAL WATER RECLAMATION FACILITY
PermitteeEmerald Coast Utilities Authority
NPDES IDFL0559351
StatusAdministratively continued
TypeIndividual permit
ClassMajor
Facility typePublicly owned treatment works
ProgramPublicly owned treatment works
IssuedNovember 6, 2012
ExpiresNovember 5, 2017
AgencyFlorida Department of Environmental Protection
AddressCantonment, FL 32533
Receiving waterInternational Paper?s Rainwater Tract wetland
SubwatershedElevenmile Creek (HUC 031401070101)

NPDES FL0559351: effluent limits and exceedances

ECUA - CENTRAL WATER RECLAMATION FACILITY (NPDES FL0559351): 16 pollutants on file, 16 limited; 8 with a violation of any kind, 3 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
IC25 Static Renewal 7 Day Chronic Ceriodaphnia dubia41515July 31, 201865% over the limit
% of fecal coliform samples < detectable11110December 31, 201833% over the limit
Solids, total suspended111April 30, 201640% over the limit
Nitrogen, total [as N]650
Phosphorous, in total orthophosphate440
Phosphorus, total [as P]620
Nitrogen, ammonia total [as N]520
Nitrite + Nitrate total [as N]420
BOD, carbonaceous [5 day, 20 C]400
IC25 Static Renewal 7 Day Chronic Chrpimephales400
pH300
Flow, in conduit or thru treatment plant200
Temperature, water deg. centigrade100
Ammonia, unionized100
Chlorine, total residual100
Coliform, fecal general100

NPDES FL0559351: inspections, violations and enforcement

NPDES FL0559351: 252 single-event violations

The newest 50 of 252.

DateWhat EPA recordedAgency
October 3, 2026WW SSO - Overflow to Dry Land or Building BackupST6
September 18, 2026WW SSO - Overflow to Dry Land or Building BackupST6
September 17, 2026WW SSO - Overflow to Dry Land or Building BackupST6
September 7, 2026WW SSO - Overflow to Dry Land or Building BackupST6
September 5, 2026WW SSO - Overflow to Dry Land or Building BackupST6
September 2, 2026WW SSO - Overflow to Dry Land or Building BackupST6
September 1, 2026WW SSO - Overflow to Dry Land or Building BackupST6
August 22, 2026WW SSO - Overflow to Dry Land or Building BackupST6
August 15, 2026WW SSO - Overflow to Dry Land or Building BackupST6
August 6, 2026WW SSO - Overflow to Dry Land or Building BackupST6
July 10, 2026WW SSO - Overflow to Dry Land or Building BackupST6
June 12, 2026WW SSO - Overflow to Dry Land or Building BackupST6
June 5, 2026WW SSO - Overflow to Dry Land or Building BackupST6
June 3, 2026WW SSO - Overflow to Dry Land or Building BackupST6
May 28, 2026WW SSO - Overflow to Dry Land or Building BackupST6
May 26, 2026WW SSO - Overflow to Dry Land or Building BackupST6
May 19, 2026WW SSO - Overflow to Dry Land or Building BackupST6
May 13, 2026WW SSO - Discharge to WatersST6
May 10, 2026WW SSO - Discharge to WatersST6
April 4, 2026WW SSO - Overflow to Dry Land or Building BackupST6
April 3, 2026WW SSO - Overflow to Dry Land or Building BackupST6
March 1, 2026WW SSO - Overflow to Dry Land or Building BackupST6
February 20, 2026WW SSO - Overflow to Dry Land or Building BackupST6
February 17, 2026WW SSO - Overflow to Dry Land or Building BackupST6
December 21, 2025WW SSO - Overflow to Dry Land or Building BackupST6
November 19, 2025WW SSO - Overflow to Dry Land or Building BackupST6
November 3, 2025WW SSO - Discharge to WatersST6
October 8, 2025WW SSO - Overflow to Dry Land or Building BackupST6
October 1, 2025WW SSO - Overflow to Dry Land or Building BackupST6
September 26, 2025WW SSO - Overflow to Dry Land or Building BackupST6
September 21, 2025WW SSO - Overflow to Dry Land or Building BackupST6
September 2, 2025WW SSO - Overflow to Dry Land or Building BackupST6
August 2, 2025WW SSO - Discharge to WatersST6
July 30, 2025WW SSO - Discharge to WatersST6
July 22, 2025WW SSO - Overflow to Dry Land or Building BackupST6
July 21, 2025WW SSO - Overflow to Dry Land or Building BackupST6
July 17, 2025WW SSO - Overflow to Dry Land or Building BackupST6
July 14, 2025WW SSO - Discharge to WatersST6
July 12, 2025WW SSO - Discharge to WatersST6
July 11, 2025WW SSO - Discharge to WatersST6
May 30, 2025WW SSO - Overflow to Dry Land or Building BackupST6
May 25, 2025WW SSO - Discharge to WatersST6
May 21, 2025WW SSO - Discharge to WatersST6
April 21, 2025WW SSO - Discharge to WatersST6
April 19, 2025WW SSO - Discharge to WatersST6
April 11, 2025WW SSO - Overflow to Dry Land or Building BackupST6
March 18, 2025WW SSO - Discharge to WatersST6
March 2, 2025WW SSO - Overflow to Dry Land or Building BackupST6
February 28, 2025WW SSO - Overflow to Dry Land or Building BackupST6
February 19, 2025WW SSO - Discharge to WatersST6

NPDES FL0559351: 1 inspection

DateWhat EPA recordedAgency
March 10, 2026AuditS

NPDES FL0559351 (ECUA - CENTRAL WATER RECLAMATION FACILITY): no formal enforcement action and informal enforcement action on file.

Watch NPDES FL0559351

NPDES FL0559351: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FL0559351

NPDES FL0559351: 16 pollutant rows, 253 dated events; ICIS-NPDES download, loaded September 15, 2026.