NPDES FLG110891 · Clean Water Act
THE PRESTRESS GROUP INC READY MIXED CONCRETE PLANT, Miami, FL: NPDES FLG110891 discharge permit, effluent exceedances, inspections, penalties
THE PRESTRESS GROUP INC READY MIXED CONCRETE PLANT, Miami, Florida: General permit coverage FLG110891, held by The De Moya Group Inc; Effective; issued October 18, 2017, term to October 17, 2022, by Florida Department of Environmental Protection; Ready-Mix Concrete Manufacturing.
Other permits held by The De Moya Group Inc
- TURNPIKE (HEFT), Miami: FLR10NR15, issued 2014-02-03
- SR 821 (HEFT)WIDENING FROM S - KILLIAN PKWY TO N - SUNSET DR, Miami: FLR10PG09, issued 2015-05-17
- I-95 EXPRESS 3A-1, Fort Lauderdale: FLR20AR43, issued 2016-04-30
- E1T28 - RIVER ROAD, Venice: FLR20FA10, issued 2021-12-13
- WEST VILLAGES VILLAGE D ROUNDABOUT, Venice: FLR20FV65, issued 2022-11-11
- DESIGN BUILD E1U79, Naples: FLR20GA78, issued 2023-02-13
- SR 70, Bradenton: FLR20GV64, issued 2023-12-15
THE PRESTRESS GROUP INC READY MIXED CONCRETE PLANT among its neighbors
44 discharge permits are in the Black Creek Canal subwatershed (HUC 030902061602); FLG110891 is one. Its county: 1,003, 37 major; FLG110891 is minor permit.
Other permits in the Black Creek Canal subwatershed (HUC 030902061602)
- AHS OLD CUTLER NORTH, Miami: FLR10UV39, minor, term to 2026-12-01
- AHS OLD CUTLER SOUTH, Miami: FLR10UV41, minor, term to 2026-12-01
- AUDI SOUTH, Palmetto Bay: FLR10UX93, minor, term to 2027-01-29
- AVALON KENDALL, Miami: FLR10XT65, minor, term to 2030-06-27
- BAY POINTE APARTMENTS, Miami: FLR10VG59, minor, term to 2027-06-11
- BECKMAN COULTER KENDALL FACILITY, Miami: FLR05J104, minor, term to 2028-10-19
- BLACK POINT WASTEWATER TREATMENT PLANT, Cutler Bay: FLR20HC78, minor, term to 2029-04-03
- BLUE HERON PARK, Miami: FLR10YC30, minor, term to 2030-12-04
- CAPISTRANO, Cutler Bay: FLR20HR27, minor, term to 2029-11-06
- CATALYST AT GOULDS, Miami: FLR10XY78, minor, term to 2030-09-18
What stands out
- Its term runs 4 years and 364 days, October 18, 2017 to October 17, 2022; the term ended 1,458 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; the file names no program for it, and it is a minor discharger.
Identity
| Facility | THE PRESTRESS GROUP INC READY MIXED CONCRETE PLANT |
|---|---|
| Permittee | The De Moya Group Inc |
| NPDES ID | FLG110891 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | October 18, 2017 |
| Expires | October 17, 2022 |
| Agency | Florida Department of Environmental Protection |
| Address | Miami, FL 33186 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Black Creek Canal (HUC 030902061602) |
| NAICS | 327320 – Ready-Mix Concrete Manufacturing |
| SIC | 3273 – Ready-Mixed Concrete |
NPDES FLG110891: effluent limits and exceedances
THE PRESTRESS GROUP INC READY MIXED CONCRETE PLANT (NPDES FLG110891): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLG110891: no pollutant row on file.
NPDES FLG110891: inspections, violations and enforcement
NPDES FLG110891 (THE PRESTRESS GROUP INC READY MIXED CONCRETE PLANT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLG110891
NPDES FLG110891: one email when its EPA record changes — $99/month.
Permits near NPDES FLG110891
NPDES FLG110891: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.