NPDES FLR05C116 · Clean Water Act
TALLEYRAND MARINE TERMINAL, Jacksonville, FL: NPDES FLR05C116 discharge permit, effluent exceedances, inspections, penalties
TALLEYRAND MARINE TERMINAL, Jacksonville, Florida: General permit coverage FLR05C116, held by Jacksonville Port Authority; Industrial stormwater; Administratively continued; issued February 4, 2021, term to February 3, 2026, by Florida Department of Environmental Protection; discharges to ST JOHNS RIVER.
- Iron, total recoverable: 2 limits, 2 violations of any kind.
- Zinc, total recoverable: 2 limits, 2 violations of any kind.
- Aluminum, total recoverable: 2 limits, 2 violations of any kind.
- Lead, total recoverable: 2 limits, 2 violations of any kind.
- March 6, 2026: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- March 6, 2026: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- March 6, 2026: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- March 6, 2026: Evaluation (S).
- June 7, 2024: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- June 7, 2024: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- June 7, 2024: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- June 7, 2024: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- June 7, 2024: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- June 7, 2024: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- March 22, 2022: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- March 22, 2022: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- March 22, 2022: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- March 22, 2022: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- March 22, 2022: WW Storm Water Non-Construction - Failure to submit required report (non-DMR) (ST6).
- April 1, 2020: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- April 1, 2018: WW Storm Water Non-Construction - Failure to Monitor (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,622 were issued before FLR05C116. Jacksonville Port Authority holds 2 permits in Florida.
Other permits held by Jacksonville Port Authority
- BLOUNT ISLAND MARINE TERMINAL, Jacksonville: FLR05C066, issued 2021-02-04
Coverages issued nearest FLR05C116
- 2021-01-29: WM INDIAN RIVER COUNTY, Vero Beach: FLR05H907, held by Waste Management Inc of Florida
- 2021-01-30: PERMA-FIX OF FLORIDA INC, Gainesville: FLR05B553, held by Perma-Fix Of Florida Inc
- 2021-02-01: PREFERRED MATERIALS INC - BRADENTON BLOCK, Bradenton: FLR05H938, held by Preferred Materials Inc
- 2021-02-01: INTEGRITY POOL DEVELOPMENT, Bradenton: FLR05I603, held by Integrity Pool Development, LLC
- 2021-02-04: BLOUNT ISLAND MARINE TERMINAL, Jacksonville: FLR05C066, held by Jacksonville Port Authority
- 2021-02-04: T P SMITH WATER RECLAMATION FACILITY, Tallahassee: FLR05E114, held by City of Tallahassee
- 2021-02-05: PANAMA CITY PEC, Panama City: FLR05I605, held by Rolling Frito-Lay Sales LP
- 2021-02-07: WMIF - PINELLAS MRF, Clearwater: FLR05C354, held by Waste Management Inc of Florida
- 2021-02-07: NAVAL SUPPORT ACTIVITY - PANAMA CITY, Panama City Beach: FLR05G134, held by Naval Support Activity Panama City
- 2021-02-07: NAVAL SUPPORT ACTIVITY-PANAMA CITY, Panama City Beach: FLRNEF352, held by Naval Support Activity Panama City
TALLEYRAND MARINE TERMINAL among its neighbors
150 discharge permits are in the Arlington River subwatershed (HUC 030801031503); FLR05C116 is one. Its county: 1,042, 17 major; FLR05C116 is minor permit.
Other permits in the Arlington River subwatershed (HUC 030801031503)
- 7 UP/SNAPPLE SOUTHEAST, Jacksonville: FLR05C316, minor, term to 2022-03-08
- ACC JACKSONVILLE, Jacksonville: FLR05J119, minor, term to 2028-11-23
- ALL - BRITE SALES CO INC, Jacksonville: FLRNEE453, minor, term to 2021-08-12
- AMERITERPENES LLC, Jacksonville: FLR05J417, minor, term to 2030-10-31
- ARLINGTON MARINA INC, Jacksonville: FLR05G804, minor, term to 2024-02-21
- ARLINGTON PLACE, Jacksonville: FLR10VL84, minor, term to 2027-09-24
- BARTON PRINTING INC, Jacksonville: FLRNEF113, minor, term to 2022-09-02
- BAYMEADOWS RD, Jacksonville: FLR10WT31, minor, term to 2029-04-20
- BELFORT CREEK, Jacksonville: FLR10YA59, minor, term to 2030-10-26
- BERMAN BROTHERS INC, Jacksonville: FLR05G229, minor, term to 2026-02-13
What stands out
- Its term runs 4 years and 364 days, February 4, 2021 to February 3, 2026; the term ended 224 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is single-event violation and inspection on March 6, 2026, 193 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 3 single-event violations, 1 inspection.
- EPA's file dates 17 events for it, from 2018 to 2026; the busiest year is 2024 with 6.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | TALLEYRAND MARINE TERMINAL |
|---|---|
| Permittee | Jacksonville Port Authority |
| NPDES ID | FLR05C116 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | February 4, 2021 |
| Expires | February 3, 2026 |
| Agency | Florida Department of Environmental Protection |
| Address | Jacksonville, FL 32206 |
| Receiving water | ST JOHNS RIVER |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Arlington River (HUC 030801031503) |
| Other EPA IDs (FRS) | RCRA handler FLT110081858 |
NPDES FLR05C116: effluent limits and exceedances
TALLEYRAND MARINE TERMINAL (NPDES FLR05C116): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Iron, total recoverable | 2 | 2 | 0 | ||
| Zinc, total recoverable | 2 | 2 | 0 | ||
| Aluminum, total recoverable | 2 | 2 | 0 | ||
| Lead, total recoverable | 2 | 2 | 0 |
NPDES FLR05C116: inspections, violations and enforcement
NPDES FLR05C116: 16 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| March 6, 2026 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| March 6, 2026 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| March 6, 2026 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| June 7, 2024 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| June 7, 2024 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| June 7, 2024 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| June 7, 2024 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| June 7, 2024 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| June 7, 2024 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| March 22, 2022 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| March 22, 2022 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| March 22, 2022 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| March 22, 2022 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| March 22, 2022 | WW Storm Water Non-Construction - Failure to submit required report (non-DMR) | ST6 |
| April 1, 2020 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| April 1, 2018 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
NPDES FLR05C116: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 6, 2026 | Evaluation | S |
NPDES FLR05C116 (TALLEYRAND MARINE TERMINAL): no formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05C116
NPDES FLR05C116: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05C116
NPDES FLR05C116: 4 pollutant rows, 17 dated events; ICIS-NPDES download, loaded September 15, 2026.