NPDES FLR05G122 · Clean Water Act
WASTE MANAGEMENT OF MILTON, FL, Milton, FL: NPDES FLR05G122 discharge permit, effluent exceedances, inspections, penalties
WASTE MANAGEMENT OF MILTON, FL, Milton, Florida: General permit coverage FLR05G122, held by Waste Management Inc. of Florida; Industrial stormwater; Effective; issued May 28, 2021, term to May 27, 2026, by Florida Department of Environmental Protection.
- August 11, 2026: Evaluation (S).
- March 19, 2024: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- March 19, 2024: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- March 19, 2024: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,828 were issued before FLR05G122. Waste Management Inc. of Florida holds 15 permits in Florida.
Other permits held by Waste Management Inc. of Florida
- KEY LARGO TRANSFER STATION, Key Largo: FLR05B794, issued 2017-01-22
- CUDJOE KEY TRANSFER STATION, Summerland Key: FLR05B795, issued 2017-01-22
- LONG KEY TRANSFER STATION, Long Key: FLR05B796, issued 2017-01-22
- WASTE MANAGEMENT OF MARTIN COUNTY, Hobe Sound: FLR05B960, issued 2017-01-23
- WASTE MANAGEMENT OF BAY COUNTY, Panama City: FLR05C075, issued 2021-03-20
- WASTE MANAGEMENT OF PALM CITY, Palm City: FLR05C113, issued 2012-01-09
- MONARCH HILL, Coconut Creek: FLR05F437, issued 2017-04-20
- ORLANDO TRANSFER STATION, Orlando: FLR05F527, issued 2017-05-22
- WM OF CHARLOTTE COUNTY, Punta Gorda: FLR05G877, issued 2019-05-06
- WMIF - FORT PIERCE TRANSFER AND RECYCLING FACILITY, Fort Pierce: FLR05H561, issued 2018-09-07
Coverages issued nearest FLR05G122
- 2021-05-23: THE COCA-COLA COMPANY FLAVOR MANUFACTURING APOPKA, Apopka: FLR05A763, held by Coca Cola Company Flavor Manufacturing Apopka
- 2021-05-23: NAVAL STATION MAYPORT, Jacksonville: FLR05A970, held by Naval Station Mayport
- 2021-05-24: H R LEWIS PETROLEUM CO, Jacksonville: FLR05G968, held by H R Lewis Petroleum Co
- 2021-05-28: FLORIDA SEPTIC INC, Hawthorne: FLR05C283, held by Florida Septic Inc
- 2021-05-28: TRANE, Panama City: FLR05E326, held by Trane
- 2021-05-28: WM RECYCLING DEERFIELD (AKA RECYCLING SUN 11), Deerfield Beach: FLR05H967, held by Waste Management Inc of Florida
- 2021-05-28: WM RECYCLING LANTANA (AKA WM RECYCLING SUN 5), Lantana: FLR05H968, held by Waste Management Inc of Florida
- 2021-05-29: CHARLES LARSEN MEMORIAL POWER PLANT, Lakeland: FLR05A183, held by City Of Lakeland Lakeland Electric
- 2021-05-29: C D MCINTOSH POWER PLANT, Lakeland: FLR05A184, held by Lakeland Electric And Water Utilities
- 2021-05-29: ARMELLINI EXPRESS LINES INC, Palm City: FLR05A281, held by Armellini Express Lines Inc
WASTE MANAGEMENT OF MILTON, FL among its neighbors
14 discharge permits are in the Pelican Bayou-Jakes Bayou Frontal subwatershed (HUC 031401050302); FLR05G122 is one. Its county: 199, 2 major; FLR05G122 is minor permit.
Other permits in the Pelican Bayou-Jakes Bayou Frontal subwatershed (HUC 031401050302)
- 7-ELEVEN, Milton: FLR20IP34, minor, term to 2030-09-19
- 7-ELEVEN STORE NO. 42621, Milton: FLG074462, minor, term to 2030-05-19
- AMERICAN CONCRETE SUPPLY - MILTON, Milton: FLG110721, minor, term to 2025-12-26
- CENTRAL LANDFILL, Milton: FLR05H567, minor, term to 2023-07-29
- CENTRAL LANDFILL, Milton: FLR10WP16, minor, term to 2029-02-18
- CYDI - MILTON TERMINAL, Milton: FLR05G833, minor, term to 2023-11-29
- DIST 1 ME FACILITY, Milton: FLR10XM99, minor, term to 2030-03-13
- SANTA ROSA COUNTY LANDFILL MAINTENANCE FACILITY, Milton: FLR10WP73, minor, term to 2029-02-24
- SHADY OAKS PLACE SUBDIVISION, Bagdad: FLG074527, minor, term to 2030-07-15
- SUNDIAL WWTP, Milton: FLR10YL49, minor, term to 2031-05-02
What stands out
- Its term runs 4 years and 364 days, May 28, 2021 to May 27, 2026; the term ended 111 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- Its newest dated event on file is an inspection on August 11, 2026, 35 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 4 events for it, from 2024 to 2026; the busiest year is 2024 with 3.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | WASTE MANAGEMENT OF MILTON, FL |
|---|---|
| Permittee | Waste Management Inc. of Florida |
| NPDES ID | FLR05G122 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | May 28, 2021 |
| Expires | May 27, 2026 |
| Agency | Florida Department of Environmental Protection |
| Address | Milton, FL 32583 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Pelican Bayou-Jakes Bayou Frontal (HUC 031401050302) |
NPDES FLR05G122: effluent limits and exceedances
WASTE MANAGEMENT OF MILTON, FL (NPDES FLR05G122): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR05G122: no pollutant row on file.
NPDES FLR05G122: inspections, violations and enforcement
NPDES FLR05G122: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| March 19, 2024 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| March 19, 2024 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| March 19, 2024 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
NPDES FLR05G122: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| August 11, 2026 | Evaluation | S |
NPDES FLR05G122 (WASTE MANAGEMENT OF MILTON, FL): no formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05G122
NPDES FLR05G122: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05G122
NPDES FLR05G122: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded September 15, 2026.