Velarion Records
Free: one email when NPDES FLR05H567 changes. Unsubscribe any time.

NPDES FLR05H567 · Clean Water Act

CENTRAL LANDFILL, Milton, FL: NPDES FLR05H567 discharge permit, effluent exceedances, inspections, penalties

CENTRAL LANDFILL, Milton, Florida: General permit coverage FLR05H567, held by Santa Rosa County; Industrial stormwater; Effective; issued July 30, 2018, term to July 29, 2023, by Florida Department of Environmental Protection; Solid Waste Landfill.

No violation or effluent exceedance is on file for any of the 2 pollutants listed for NPDES FLR05H567.

  • Solids, total suspended: 2 limits.
  • Iron, total recoverable: 2 limits.
  • April 28, 2021: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
  • April 28, 2021: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • April 28, 2021: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • April 28, 2021: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • April 28, 2021: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 1,962 were issued before FLR05H567. Santa Rosa County holds 6 permits in Florida.

Other permits held by Santa Rosa County

Coverages issued nearest FLR05H567

CENTRAL LANDFILL among its neighbors

14 discharge permits are in the Pelican Bayou-Jakes Bayou Frontal subwatershed (HUC 031401050302); FLR05H567 is one. Its county: 199, 2 major; FLR05H567 is minor permit.

Other permits in the Pelican Bayou-Jakes Bayou Frontal subwatershed (HUC 031401050302)

What stands out

  • Its term runs 4 years and 364 days, July 30, 2018 to July 29, 2023; the term ended 1,173 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
  • Its newest dated event on file is a single-event violation on April 28, 2021, 1,995 days before EPA's file was loaded.
  • No dated event in the 365 days to October 14, 2026.
  • EPA's file dates 5 events for it, all in 2021.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityCENTRAL LANDFILL
PermitteeSanta Rosa County
NPDES IDFLR05H567
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedJuly 30, 2018
ExpiresJuly 29, 2023
AgencyFlorida Department of Environmental Protection
AddressMilton, FL 32583
Receiving water impaired303(D) Listed
SubwatershedPelican Bayou-Jakes Bayou Frontal (HUC 031401050302)
NAICS562212 – Solid Waste Landfill
SIC4953 – Refuse Systems
Other EPA IDs (FRS)RCRA handler FLR000153957; ICIS-AIR source FL0000001211300172

NPDES FLR05H567: effluent limits and exceedances

CENTRAL LANDFILL (NPDES FLR05H567): 2 pollutants on file, 2 limited; 0 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended200
Iron, total recoverable200

NPDES FLR05H567: inspections, violations and enforcement

NPDES FLR05H567: 5 single-event violations

DateWhat EPA recordedAgency
April 28, 2021WW Storm Water Non-Construction - Failure to properly operate and maintain BMPsST6
April 28, 2021WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
April 28, 2021WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
April 28, 2021WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
April 28, 2021WW Storm Water Non-Construction - Failure to Conduct InspectionsST6

NPDES FLR05H567 (CENTRAL LANDFILL): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05H567

NPDES FLR05H567: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05H567

NPDES FLR05H567: 2 pollutant rows, 5 dated events; ICIS-NPDES download, loaded October 14, 2026.