NPDES FLR05I243 · Clean Water Act
SUNSHINE WELDING-MAIN, Cape Canaveral, FL: NPDES FLR05I243 discharge permit, effluent exceedances, inspections, penalties
SUNSHINE WELDING-MAIN, Cape Canaveral, Florida: General permit coverage FLR05I243, held by Sunshine Welding; Industrial stormwater; Administratively continued; issued July 29, 2018, term to July 28, 2023, by Florida Department of Environmental Protection.
No violation or effluent exceedance is on file for any of the 4 pollutants listed for NPDES FLR05I243.
- Nitrite + Nitrate total [as N]: 2 limits.
- Iron, total recoverable: 2 limits.
- Zinc, total recoverable: 2 limits.
- Aluminum, total recoverable: 2 limits.
- November 4, 2022: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- November 4, 2022: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- October 29, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- October 29, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- October 29, 2019: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- October 29, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- October 29, 2019: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- October 29, 2019: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 1,960 were issued before FLR05I243. Sunshine Welding holds 3 permits in Florida.
Other permits held by Sunshine Welding
- SUNSHINE WELDING, SCALLOP, Port Canaveral: FLR05I242, issued 2018-07-29
- SUNSHINE WELDING, Cape Canaveral: FLRNEE207, issued 2008-06-13
Coverages issued nearest FLR05I243
- 2018-07-27: INDIAN RIVER BIODIESEL, Fort Pierce: FLRNEF548, held by Indian River Biodiesel, LLC
- 2018-07-28: ADVANCE AUTO PARTS DISTRIBUTION CENTER #29, Lakeland: FLR05G704, held by Advance Stores Company Inc
- 2018-07-28: M & K USED AUTO PARTS AND SALES, Vero Beach: FLR05H565, held by M&K Used Auto Parts Inc
- 2018-07-28: MANASOTA OPTICS INC, Sarasota: FLRNEF546, held by Manasota Optics Inc
- 2018-07-29: SUNSHINE WELDING, SCALLOP, Port Canaveral: FLR05I242, held by Sunshine Welding
- 2018-07-30: JOHNS MANVILLE, Jacksonville: FLR05F735, held by Johns Manville
- 2018-07-30: CENTRAL LANDFILL, Milton: FLR05H567, held by Santa Rosa County
- 2018-08-03: FEDERAL MARINE TERMINALS INC, Palmetto: FLR05G774, held by Federal Marine Terminals Inc
- 2018-08-04: DANTZLER INC, Jacksonville: FLR05G744, held by Dantzler, Inc
- 2018-08-09: MOCKINGBIRD WAY MULCHING FACILITY HOUSEHOLD HAZARDOUS WASTE, Titusville: FLRNEE177, held by Brevard Co Solid Waste Managemt Dept.
SUNSHINE WELDING-MAIN among its neighbors
Its county: 713, 5 major; FLR05I243 is minor permit.
Other permits in the county
- 192 STORAGE FACILITY, Melbourne: FLR20FX41, minor, term to 2027-12-14
- 20 WEST POINT DR VERTOLLI, Cocoa Beach: FLG074383, minor, term to 2030-03-17
- 360 DEGREE OFFICE BUILDING, Palm Bay: FLR20IN12, minor, term to 2030-08-27
- 415 SOUTH BANANA RIVER, Merritt Island: FLR10VI91, minor, term to 2027-07-29
- 41784 - 7 ELEVEN WEST MELBOURNE, Melbourne: FLR20FD88, minor, term to 2027-02-10
- 7-ELEVEN NO. 32138, Rockledge: FLG915284, minor, term to 2030-11-11
- 774 GERLITZ - NEW CONSTRUCTION, Palm Bay: FLR10XY07, minor, term to 2030-09-11
- 84 LUMBER YARD EXPANSION, Palm Shores: FLR20BS29, minor, term to 2022-10-26
- 9075 ELLIS ROAD, West Melbourne: FLR20IH86, minor, term to 2030-06-08
- ABC SUPPLY ROCKLEDGE, Rockledge: FLR20HF47, minor, term to 2029-05-08
What stands out
- Its term runs 4 years and 364 days, July 29, 2018 to July 28, 2023; the term ended 1,145 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on November 4, 2022, 1,411 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 8 events for it, from 2019 to 2022; the busiest year is 2019 with 6.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | SUNSHINE WELDING-MAIN |
|---|---|
| Permittee | Sunshine Welding |
| NPDES ID | FLR05I243 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | July 29, 2018 |
| Expires | July 28, 2023 |
| Agency | Florida Department of Environmental Protection |
| Address | Cape Canaveral, FL 32920 |
NPDES FLR05I243: effluent limits and exceedances
SUNSHINE WELDING-MAIN (NPDES FLR05I243): 4 pollutants on file, 4 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Nitrite + Nitrate total [as N] | 2 | 0 | 0 | ||
| Iron, total recoverable | 2 | 0 | 0 | ||
| Zinc, total recoverable | 2 | 0 | 0 | ||
| Aluminum, total recoverable | 2 | 0 | 0 |
NPDES FLR05I243: inspections, violations and enforcement
NPDES FLR05I243: 8 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| November 4, 2022 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| November 4, 2022 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| October 29, 2019 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| October 29, 2019 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| October 29, 2019 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| October 29, 2019 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| October 29, 2019 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| October 29, 2019 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
NPDES FLR05I243 (SUNSHINE WELDING-MAIN): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05I243
NPDES FLR05I243: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05I243
NPDES FLR05I243: 4 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.