NPDES FLR05I263 · Clean Water Act
GULF COAST SUPPLY & MANUFACTURING LLC, Sebring, FL: NPDES FLR05I263 discharge permit, effluent exceedances, inspections, penalties
GULF COAST SUPPLY & MANUFACTURING LLC, Sebring, Florida: General permit coverage FLR05I263, held by Gulf Coast Supply & Manufacturing, LLC; Industrial stormwater; Administratively continued; issued September 17, 2018, term to September 16, 2023, by Florida Department of Environmental Protection.
No violation or effluent exceedance is on file for any of the 4 pollutants listed for NPDES FLR05I263.
- Nitrite + Nitrate total [as N]: 2 limits.
- Iron, total recoverable: 2 limits.
- Zinc, total recoverable: 2 limits.
- Aluminum, total recoverable: 2 limits.
- July 27, 2023: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- July 27, 2023: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- July 27, 2023: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- August 23, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- August 23, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- August 23, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,000 were issued before FLR05I263.
Coverages issued nearest FLR05I263
- 2018-09-10: ALUMNI FOREST PRODUCTS, Lake City: FLR05I252, held by Idaho Timber, LLC
- 2018-09-10: AMAZON.COM SERVICES LLC MIA1, Opa Locka: FLR05I266, held by Amazon.com Services LLC
- 2018-09-10: USPS FORT PIERCE VEHICLE MAINTENANCE FACILITY, Fort Pierce: FLRNEE726, held by United States Postal Service
- 2018-09-13: HIALEAH TRANSFER STATION, Miami: FLR05B475, held by Waste Connections of Florida, Inc.
- 2018-09-14: WESTPORT WASTEWATER TREATMENT FACILITY, Port Saint Lucie: FLR05H590, held by Port St. Lucie, City of
- 2018-09-23: JOHN'S METAL, Palatka: FLR05G748, held by John's Auto Parts of Bunnell Inc
- 2018-09-23: TRACKER BOAT CENTER, Tallahassee: FLR05H576, held by TMBC, LLC
- 2018-09-23: TRACKER BOAT CENTER, Palm Bay: FLR05I269, held by TMBC, LLC
- 2018-09-24: FIRST TRANSIT, INC #57221, Boynton Beach: FLR05F761, held by First Transit
- 2018-09-27: CEMEX - RIVIERA BEACH BLOCK, Riviera Beach: FLR05B248, held by CEMEX Construction Materials Florida LLC
GULF COAST SUPPLY & MANUFACTURING LLC among its neighbors
23 discharge permits are in the Lower Arbuckle Creek subwatershed (HUC 030901011802); FLR05I263 is one. Its county: 86, 0 major; FLR05I263 is minor permit.
Other permits in the Lower Arbuckle Creek subwatershed (HUC 030901011802)
- ADVANCED DRAINAGE SYSTEM, Sebring: FLR05I250, minor, term to 2023-08-16
- ALPHA GENERAL SERVICES INC., Sebring: FLRNEF827, minor, term to 2027-06-12
- DIVERSIFIED CPC INTERNATIONAL, Sebring: FLR05J064, minor, term to 2028-08-03
- E-STONE USA CORPORATION, Sebring: FLR05G996, minor, term to 2025-04-27
- FUNDER BY GENESIS PRODUCTS, Sebring: FLRNEG085, minor, term to 2030-08-27
- GENPAK, Sebring: FLR05G107, minor, term to 2018-08-29
- HIGHLANDS CO LANDFILL, Sebring: FLR20HS83, minor, term to 2029-11-27
- HUCKE MANUFACTURING INC, Sebring: FLR10XS78, minor, term to 2030-06-12
- JIMS AUTO SALVAGE INC, Sebring: FLR05G191, minor, term to 2026-03-31
- MID-STATE PRECAST, Sebring: FLR05J516, minor, term to 2031-04-18
What stands out
- Its term runs 4 years and 364 days, September 17, 2018 to September 16, 2023; the term ended 1,095 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on July 27, 2023, 1,146 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 6 events for it, from 2019 to 2023.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | GULF COAST SUPPLY & MANUFACTURING LLC |
|---|---|
| Permittee | Gulf Coast Supply & Manufacturing, LLC |
| NPDES ID | FLR05I263 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | September 17, 2018 |
| Expires | September 16, 2023 |
| Agency | Florida Department of Environmental Protection |
| Address | Sebring, FL 33870 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Arbuckle Creek (HUC 030901011802) |
NPDES FLR05I263: effluent limits and exceedances
GULF COAST SUPPLY & MANUFACTURING LLC (NPDES FLR05I263): 4 pollutants on file, 4 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Nitrite + Nitrate total [as N] | 2 | 0 | 0 | ||
| Iron, total recoverable | 2 | 0 | 0 | ||
| Zinc, total recoverable | 2 | 0 | 0 | ||
| Aluminum, total recoverable | 2 | 0 | 0 |
NPDES FLR05I263: inspections, violations and enforcement
NPDES FLR05I263: 6 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| July 27, 2023 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| July 27, 2023 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| July 27, 2023 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| August 23, 2019 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| August 23, 2019 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| August 23, 2019 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
NPDES FLR05I263 (GULF COAST SUPPLY & MANUFACTURING LLC): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05I263
NPDES FLR05I263: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05I263
NPDES FLR05I263: 4 pollutant rows, 6 dated events; ICIS-NPDES download, loaded September 15, 2026.