NPDES FLR10WV70 · Clean Water Act
LIL ABNER 3, Miami, FL: NPDES FLR10WV70 discharge permit, effluent exceedances, inspections, penalties
LIL ABNER 3, Miami, Florida: General permit coverage FLR10WV70, held by CREI Holdings LLC; Construction stormwater; Effective; issued May 23, 2024, term to May 22, 2029, by Florida Department of Environmental Protection.
- September 8, 2026: State CWA Penalty AO (State), $23,230 state or local penalty.
- July 1, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
- July 1, 2025: WW Storm Water Construction - Failure to Maintain Records (ST6).
- July 1, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- July 1, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 6,863 were issued before FLR10WV70.
Coverages issued nearest FLR10WV70
- 2024-05-23: SR 200 MARION COUNTY, Ocala: FLR10WV28, held by ANDERSON COLUMBIA CO
- 2024-05-23: MULTIPLE LOTS N VERO LAKE ESTATES, Vero Beach: FLR10WV29, held by Onelove Enterprise Homes LLC
- 2024-05-23: JARRETT GORDAN FORD SERVICE FACILITY, Davenport: FLR10WV30, held by ROGGEN CLYNE DEVELOPMENT
- 2024-05-23: HOLMAN PORSCHE SOLE MIA, North Miami: FLR10WV31, held by Miller Construction Company
- 2024-05-23: OSLO PARK UNIT-2B, Vero Beach: FLR10WV66, held by IRC Habitat for Humanity Inc
- 2024-05-23: MT DORA GROVES LOCHSIDE, Mount Dora: FLR10WV74, held by Hughes Brothers Construction Inc
- 2024-05-23: INTEGRA ARTEMIS, Melbourne: FLR20HG25, held by Integra Artemis LLC
- 2024-05-23: PALOMINO, Wellington: FLR20HG26, held by Lennar Homes LLC
- 2024-05-23: OASIS PHASE 1, Daytona Beach: FLR20HG28, held by Hazen Construction
- 2024-05-23: ALBA RESIDENCES, West Palm Beach: FLR20HG29, held by Alba Residences
LIL ABNER 3 among its neighbors
124 discharge permits are in the Tamiami Canal subwatershed (HUC 030902061500); FLR10WV70 is one. Its county: 1,003, 37 major; FLR10WV70 is minor permit.
Other permits in the Tamiami Canal subwatershed (HUC 030902061500)
- 130 ALMERIA, Coral Gables: FLR10YC05, minor, term to 2030-11-21
- 1400 BADIA SPICE, Doral: FLRNEG053, minor, term to 2030-04-23
- 1500 BADIA SPICES, Doral: FLRNEG055, minor, term to 2030-04-23
- 1551 BADIA SPICES, Doral: FLRNEG056, minor, term to 2030-04-23
- 1571 BADIA SPICES LLC, Doral: FLRNEG057, minor, term to 2030-04-23
- 1600 BADIA SPICES LLC, Doral: FLRNEG054, minor, term to 2030-04-23
- 1700 BADIA SPICES, Doral: FLRNEG058, minor, term to 2030-04-23
- 2200 BADIA SPICES, Miami: FLRNEG059, minor, term to 2030-04-23
- 301-341 MADEIRA AVENUE, Coral Gables: FLR10VN91, minor, term to 2027-10-30
- 36TH ST STORAGE BUILDING A AND B RENOVATIONS, Virginia Gardens: FLR10XN01, minor, term to 2030-02-26
What stands out
- Its term runs 4 years and 364 days, May 23, 2024 to May 22, 2029.
- Its newest dated event on file is a formal enforcement action on September 8, 2026, 7 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 formal enforcement action.
- EPA's file dates 5 events for it, from 2025 to 2026; the busiest year is 2025 with 4.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LIL ABNER 3 |
|---|---|
| Permittee | CREI Holdings LLC |
| NPDES ID | FLR10WV70 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 23, 2024 |
| Expires | May 22, 2029 |
| Agency | Florida Department of Environmental Protection |
| Address | Miami, FL 33172 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Tamiami Canal (HUC 030902061500) |
NPDES FLR10WV70: effluent limits and exceedances
LIL ABNER 3 (NPDES FLR10WV70): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10WV70: no pollutant row on file.
NPDES FLR10WV70: inspections, violations and enforcement
NPDES FLR10WV70: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| July 1, 2025 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
| July 1, 2025 | WW Storm Water Construction - Failure to Maintain Records | ST6 |
| July 1, 2025 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| July 1, 2025 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
NPDES FLR10WV70: 1 formal enforcement action
1 of them with a penalty assessed. How penalties are shown.
| Date | What EPA recorded | Agency | Federal penalty | State or local penalty |
|---|---|---|---|---|
| September 8, 2026 | State CWA Penalty AO | State | $23,230 |
NPDES FLR10WV70 (LIL ABNER 3): no inspection and informal enforcement action on file.
Watch NPDES FLR10WV70
NPDES FLR10WV70: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10WV70
NPDES FLR10WV70: 0 pollutant rows, 5 dated events; ICIS-NPDES download, loaded September 15, 2026.