NPDES FLR20HG28 · Clean Water Act
OASIS PHASE 1, Daytona Beach, FL: NPDES FLR20HG28 discharge permit, effluent exceedances, inspections, penalties
OASIS PHASE 1, Daytona Beach, Florida: General permit coverage FLR20HG28, held by Hazen Construction; Construction stormwater; Effective; issued May 23, 2024, term to May 22, 2029, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 6,863 were issued before FLR20HG28. Hazen Construction holds 22 permits in Florida.
Other permits held by Hazen Construction
- LPGA - GRANDE CHAMPION, Daytona Beach: FLR20GP26, issued 2023-09-08
- COGGIN HYUNDAI, Deland: FLR20GX92, issued 2024-01-25
- BERESFORD AVE EXTENSION PH A, Deland: FLR20GZ88, issued 2024-02-20
- LIFT STATION 7, New Smyrna Beach: FLR20HC23, issued 2024-03-28
- RESERVE AT VICTORIA PH 3, Deland: FLR20HC84, issued 2024-04-05
- LEGACY WOODS, Daytona Beach: FLR20HM72, issued 2024-08-25
- SPACE COAST COMMERCE PARK @ PARKTOWNE, Edgewater: FLR20HN20, issued 2024-08-31
- ENCLAVE, Ormond Beach: FLR20HY07, issued 2025-02-13
- PORT ORANGE FIELD OPS BLDG, Port Orange: FLR20HZ78, issued 2025-03-06
- HUDSON WELLFIELD EXPANSION, Ormond Beach: FLR20IE67, issued 2025-04-28
Coverages issued nearest FLR20HG28
- 2024-05-23: OSLO PARK UNIT-2B, Vero Beach: FLR10WV66, held by IRC Habitat for Humanity Inc
- 2024-05-23: LIL ABNER 3, Miami: FLR10WV70, held by CREI Holdings LLC
- 2024-05-23: MT DORA GROVES LOCHSIDE, Mount Dora: FLR10WV74, held by Hughes Brothers Construction Inc
- 2024-05-23: INTEGRA ARTEMIS, Melbourne: FLR20HG25, held by Integra Artemis LLC
- 2024-05-23: PALOMINO, Wellington: FLR20HG26, held by Lennar Homes LLC
- 2024-05-23: ALBA RESIDENCES, West Palm Beach: FLR20HG29, held by Alba Residences
- 2024-05-23: ALACHUA FORCE MAIN, Alachua: FLR20HG30, held by GWP Construction Inc.
- 2024-05-23: SPANISH OAKS MOBILE HOME PARK, Ocala: FLR20HG31, held by GWP Construction Inc.
- 2024-05-23: OUTPARCEL G AT CITRUS CROSSING, Haines City: FLR20HG33, held by East Madeira Corporation
- 2024-05-23: SFWMD CORBETT LEVEE PHASE 2, West Palm Beach: FLR20HG74, held by ENCO LLC
OASIS PHASE 1 among its neighbors
73 discharge permits are in the Lower Tomoka River subwatershed (HUC 030802010205); FLR20HG28 is one. Its county: 479, 8 major; FLR20HG28 is minor permit.
Other permits in the Lower Tomoka River subwatershed (HUC 030802010205)
- 7 ELEVEN NO 42081 DAYTONA BEACH, Daytona Beach: FLR20HY01, minor, term to 2030-02-11
- 7 ELEVEN NO 42081 DAYTONA BEACH, Daytona Beach: FLR20IB32, minor, term to 2030-03-21
- 7-ELEVEN, Daytona Beach: FLR20IA34, minor, term to 2030-03-09
- ABB INSTALLATION PRODUCTS, Ormond Beach: FLRNEF876, minor, term to 2028-03-01
- ABB INSTALLATION PRODUCTS, Ormond Beach: FLRNEF877, minor, term to 2028-03-01
- ACE HARDWARE LPGA, Daytona Beach: FLR10WI16, minor, term to 2028-10-19
- ADVENT HEALTH MOB - DAYTONA BEACH, Daytona Beach: FLR20FZ25, minor, term to 2028-01-21
- AO PRECISION MANUFACTURING LLC, Daytona Beach: FLRNEF251, minor, term to 2024-08-10
- ASHLEY FURNITURE-TOMOKA TOWN CENTER LOT 8, Daytona Beach: FLR20FN47, minor, term to 2027-07-15
- AUTOZONE, Daytona Beach: FLR10YI58, minor, term to 2031-03-20
What stands out
- Its term runs 4 years and 364 days, May 23, 2024 to May 22, 2029.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | OASIS PHASE 1 |
|---|---|
| Permittee | Hazen Construction |
| NPDES ID | FLR20HG28 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 23, 2024 |
| Expires | May 22, 2029 |
| Agency | Florida Department of Environmental Protection |
| Address | Daytona Beach, FL 32117 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Tomoka River (HUC 030802010205) |
NPDES FLR20HG28: effluent limits and exceedances
OASIS PHASE 1 (NPDES FLR20HG28): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20HG28: no pollutant row on file.
NPDES FLR20HG28: inspections, violations and enforcement
NPDES FLR20HG28 (OASIS PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20HG28
NPDES FLR20HG28: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20HG28
NPDES FLR20HG28: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.