PORT ORANGE SIDEWALK GAPS, Port Orange, FL: NPDES FLR10YO09 discharge permit, effluent exceedances, inspections, penalties
PORT ORANGE SIDEWALK GAPS, Port Orange, Florida: General permit coverage FLR10YO09, held by Sparks Concrete Asphalt LLC; Construction stormwater; Effective; issued June 18, 2026, term to June 17, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 14,638 were issued before FLR10YO09.
Coverages issued nearest FLR10YO09
- 2026-06-15: DSG HOS HOLLYWOOD, Hollywood: FLR20JJ00, held by Rycon Construction, Inc
- 2026-06-16: ST. FRANCIS EPISCOPAL SCHOOL, Ponte Vedra: FLR20JI80, held by Blue Ocean Construction
- 2026-06-18: BLUE SKY BOAT AND RV STORAGE, New Port Richey: FLR10YO05, held by Regency Design Engineering, Inc.
- 2026-06-18: FORMER FHP TRAINING ACADMEY, Tallahassee: FLR10YO06, held by Jimmie Crowder Excavating Land Clearing
- 2026-06-18: FDOT E53E7, Eustis: FLR10YO07, held by Lakeview Contracting Inc.
- 2026-06-18: LICATA RESIDENCE, Wellington: FLR10YO10, held by arkadia enterprises llc
- 2026-06-18: CHIPOTLE - LAND O LAKES, Land O Lakes: FLR10YO12, held by STRATEGIC COMMERCIAL CONSTRUCTION, LLC
- 2026-06-18: SEMINOLE BEND NORTH, Pensacola: FLR10YO13, held by D Squared Contractors
- 2026-06-18: SHERIDAN SUBSTATION, Hollywood: FLR10YO14, held by Haugland Energy Group
- 2026-06-18: ORANGE BLOSSOM FARMS, Wellington: FLR10YO15
Other permits in Port Orange
- ALLANWOOD VILLAS, Port Orange: FLR20IM83, minor, term to 2030-08-20
- BESTRONG USA, Port Orange: FLR10XD61, minor, term to 2029-10-02
- BIK HYDRAULICS, Port Orange: FLR10XT45, minor, term to 2030-06-22
- BROWN'S LANDING NORTH, Port Orange: FLR20BK61, minor, term to 2022-05-27
- CAMPBELL CROSSING, Port Orange: FLR10XI01, minor, term to 2029-12-20
- CHRIST THE KING COMMUNITY CHURCH, Port Orange: FLR20HL49, minor, term to 2029-08-09
- CHUCK E CHEESE - PORT ORANGE, Port Orange: FLR20HA63, minor, term to 2029-03-01
- CREEKSIDE OFFICE SUITES, Port Orange: FLR20IG47, minor, term to 2030-05-21
- DUNLAWTON FORCE MAIN REPLACEMENT AND WATER MAIN R, Port Orange: FLR20JN83, minor, term to 2031-08-27
- DUNLAWTON FORCE MAIN REPLACEMENT AND WATER MAIN-2, Port Orange: FLR20JN84, minor, term to 2031-08-27
What stands out
- Its term runs 4 years and 364 days, June 18, 2026 to June 17, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PORT ORANGE SIDEWALK GAPS |
|---|---|
| Permittee | Sparks Concrete Asphalt LLC |
| NPDES ID | FLR10YO09 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 18, 2026 |
| Expires | June 17, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Port Orange, FL 32129 |
NPDES FLR10YO09: effluent limits and exceedances
PORT ORANGE SIDEWALK GAPS (NPDES FLR10YO09): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10YO09: no pollutant row on file.
NPDES FLR10YO09: inspections, violations and enforcement
NPDES FLR10YO09 (PORT ORANGE SIDEWALK GAPS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10YO09
NPDES FLR10YO09: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10YO09
NPDES FLR10YO09: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.