NPDES FLR10YP50 · Clean Water Act
HILL DEMOLITION, Vero Beach, FL: NPDES FLR10YP50 discharge permit, effluent exceedances, inspections, penalties
HILL DEMOLITION, Vero Beach, Florida: General permit coverage FLR10YP50, held by Croom Construction Company; Construction stormwater; Effective; issued July 16, 2026, term to July 15, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 14,974 were issued before FLR10YP50. Croom Construction Company holds 13 permits in Florida.
Other permits held by Croom Construction Company
- TROENDLE PROJECT, Vero Beach: FLR10VQ96, issued 2023-01-14
- LOVELL PROJECT, Vero Beach: FLR10WM00, issued 2023-12-24
- BURNS RESIDENCE, Vero Beach: FLR10YC48, issued 2025-12-06
- URBAN PROJECT, Vero Beach: FLR10YC71, issued 2025-12-11
- MILLER, Vero Beach: FLR10YD25, issued 2025-12-19
- 181 TERRAPIN POINT LLC, Vero Beach: FLR10YO19, issued 2026-06-19
- BLAIR PROJECT, Vero Beach: FLR20EU48, issued 2021-09-20
- SEGAL RESIDENCE, Vero Beach: FLR20FU43, issued 2022-10-21
- SMITH 602, Vero Beach: FLR20FU45, issued 2022-10-22
- MAGUIRE GUESTHOUSE, Vero Beach: FLR20FY26, issued 2023-01-05
Coverages issued nearest FLR10YP50
- 2026-07-13: PALMETTO RIDGE MASS GRADE PHASE TWO, Land O Lakes: FLR20JK79, held by Ripa Associates LLC
- 2026-07-13: OLD KINGS VILLAGE PHASE I II, Flagler Beach: FLR20JK80, held by JW Site Development, Inc
- 2026-07-13: USMC SUPPORT FACILITY - BLOUNT ISLAND, Jacksonville: FLR20JK81, held by USMC Support Facility - Blount Island
- 2026-07-16: THE COMMONS AT PARKLAND PH1, Milton: FLR10YP48, held by Heaton Brothers Construction Company, Inc.
- 2026-07-16: FL TECH L3 HARRIS COMMONS PARKING ADDITION PROJECT, Melbourne: FLR10YP49, held by CDM Trucking, Inc.
- 2026-07-16: CITRUS COUNTY FIRE STATION, Crystal River: FLR10YP51, held by CITRUS COUNTY
- 2026-07-16: CUTLER BAY LEGACY PARK, Cutler Bay: FLR10YP52, held by The Redland Company Inc
- 2026-07-16: TARA ESMERALDA PHASE 2, Gainesville: FLR10YP53, held by D.R. Horton, Inc.
- 2026-07-16: TARA VERDE, Newberry: FLR10YP54, held by D.R. Horton, Inc.
- 2026-07-16: BANYAN RESIDENCE, Sarasota: FLR10YP55, held by Timeless Life Care
Other permits in Vero Beach
- 10087 NEW SINGLE FAMILY CONSTRUCTION, Vero Beach: FLR10WX89, minor, term to 2029-06-28
- 100TH CT, Vero Beach: FLR10WV17, minor, term to 2029-05-19
- 10620 92ND ST. VERO BEACH, Vero Beach: FLR10XJ74, minor, term to 2030-01-25
- 1065 74TH AVE., Vero Beach: FLR10WL18, minor, term to 2028-12-14
- 1124 VERO LOT, Vero Beach: FLR10XS37, minor, term to 2030-06-04
- 1125 10TH AVE SW, Vero Beach: FLR10XP24, minor, term to 2030-04-16
- 11TH DRIVE - HARBOR BLUFFS, Vero Beach: FLR20FM17, minor, term to 2027-06-08
- 1235 & 1245 11TH CT. SW, Vero Beach: FLR10XC35, minor, term to 2029-09-08
- 125 49TH AVE, Vero Beach: FLR10XZ52, minor, term to 2030-10-08
- 16TH STREET APARTMENTS, Vero Beach: FLR20GS04, minor, term to 2028-10-13
What stands out
- Its term runs 4 years and 364 days, July 16, 2026 to July 15, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HILL DEMOLITION |
|---|---|
| Permittee | Croom Construction Company |
| NPDES ID | FLR10YP50 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 16, 2026 |
| Expires | July 15, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Vero Beach, FL 32963 |
NPDES FLR10YP50: effluent limits and exceedances
HILL DEMOLITION (NPDES FLR10YP50): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10YP50: no pollutant row on file.
NPDES FLR10YP50: inspections, violations and enforcement
NPDES FLR10YP50 (HILL DEMOLITION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10YP50
NPDES FLR10YP50: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10YP50
NPDES FLR10YP50: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.