NPDES FLR20EU48 · Clean Water Act
BLAIR PROJECT, Vero Beach, FL: NPDES FLR20EU48 discharge permit, effluent exceedances, inspections, penalties
BLAIR PROJECT, Vero Beach, Florida: General permit coverage FLR20EU48, held by Croom Construction Company; Construction stormwater; Effective; issued September 20, 2021, term to September 19, 2026, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 797 were issued before FLR20EU48. Croom Construction Company holds 13 permits in Florida.
Other permits held by Croom Construction Company
- TROENDLE PROJECT, Vero Beach: FLR10VQ96, issued 2023-01-14
- LOVELL PROJECT, Vero Beach: FLR10WM00, issued 2023-12-24
- BURNS RESIDENCE, Vero Beach: FLR10YC48, issued 2025-12-06
- URBAN PROJECT, Vero Beach: FLR10YC71, issued 2025-12-11
- MILLER, Vero Beach: FLR10YD25, issued 2025-12-19
- 181 TERRAPIN POINT LLC, Vero Beach: FLR10YO19, issued 2026-06-19
- HILL DEMOLITION, Vero Beach: FLR10YP50, issued 2026-07-16
- SEGAL RESIDENCE, Vero Beach: FLR20FU43, issued 2022-10-21
- SMITH 602, Vero Beach: FLR20FU45, issued 2022-10-22
- MAGUIRE GUESTHOUSE, Vero Beach: FLR20FY26, issued 2023-01-05
Coverages issued nearest FLR20EU48
- 2021-09-19: FORUM PENINSULA APARTMENTS, Fort Myers: FLR20ET91, held by Davis Development Inc
- 2021-09-19: AVENIR STORMWATER PUMP STATION, Palm Beach Gardens: FLR20EU33, held by Murray Logan Construction, Inc.
- 2021-09-19: DOLLAR GENERAL STORE 22514, Haines City: FLR20EU40, held by Palmetto Haines City- SR 544, LLC.
- 2021-09-19: SEAGATE ALICO NORTH INDUSTRIAL PARK, Fort Myers: FLR20EU44, held by Seagate Development
- 2021-09-19: OVERLOOK AT GRASSY LAKE PHASE 3 & 4, Minneola: FLR20EU46, held by JR. DAVIS CONSTRUCTION CO, INC
- 2021-09-20: OSPREY RANCH PHASE 1, Winter Garden: FLR20EU49, held by K Hovnanian Homes
- 2021-09-20: ENCLAVE MIXED USE, Tallahassee: FLR20EU51, held by North Florida Asphalt, Inc.
- 2021-09-20: PERCY OAKS, Jacksonville: FLR20EU52, held by Towers Development Services, LLC
- 2021-09-20: MURPHY EXPRESS COCOA FL, Cocoa: FLR20EU53, held by Murphy Oil USA Inc
- 2021-09-20: ICONICA POLO, Wellington: FLR20EV81, held by Waterford Wellington Properties LLC
BLAIR PROJECT among its neighbors
Its county: 468, 2 major; FLR20EU48 is minor permit.
Other permits in the county
- 10087 NEW SINGLE FAMILY CONSTRUCTION, Vero Beach: FLR10WX89, minor, term to 2029-06-28
- 100TH CT, Vero Beach: FLR10WV17, minor, term to 2029-05-19
- 10620 92ND ST. VERO BEACH, Vero Beach: FLR10XJ74, minor, term to 2030-01-25
- 11193 HOTCHKISS DRIVE, Sebastian: FLR10WU97, minor, term to 2029-05-17
- 1124 VERO LOT, Vero Beach: FLR10XS37, minor, term to 2030-06-04
- 1125 10TH AVE SW, Vero Beach: FLR10XP24, minor, term to 2030-04-16
- 11TH DRIVE - HARBOR BLUFFS, Vero Beach: FLR20FM17, minor, term to 2027-06-08
- 1235 & 1245 11TH CT. SW, Vero Beach: FLR10XC35, minor, term to 2029-09-08
- 12975, 12985, 12995 93RD PL, FELLSMERE, Fellsmere: FLR20GS13, minor, term to 2028-10-14
- 132ST, Sebastian: FLR10WU56, minor, term to 2029-05-11
What stands out
- Its term runs 4 years and 364 days, September 20, 2021 to September 19, 2026.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BLAIR PROJECT |
|---|---|
| Permittee | Croom Construction Company |
| NPDES ID | FLR20EU48 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 20, 2021 |
| Expires | September 19, 2026 |
| Agency | Florida Department of Environmental Protection |
| Address | Vero Beach, FL 32963 |
| Receiving water impaired | 303(D) Listed |
NPDES FLR20EU48: effluent limits and exceedances
BLAIR PROJECT (NPDES FLR20EU48): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20EU48: no pollutant row on file.
NPDES FLR20EU48: inspections, violations and enforcement
NPDES FLR20EU48 (BLAIR PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20EU48
NPDES FLR20EU48: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20EU48
NPDES FLR20EU48: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.