Clean Water Act discharge permit · NPDES GA0004154
GEORGIA POWER COMPANY (NACOOCHEE HYDROELECTRIC PLANT), Lakemont, GA: NPDES GA0004154 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
GEORGIA POWER COMPANY (NACOOCHEE HYDROELECTRIC PLANT), held by Georgia Power Company, holds NPDES permit GA0004154. EPA’s file records it issued March 16, 2017 and expiring March 31, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What stands out
- Its term runs 5 years and 15 days, March 16, 2017 to March 31, 2022; the term ended 1,658 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; the file names no program for it, and it is a minor discharger.
Identity
| Facility as filed | GEORGIA POWER COMPANY (NACOOCHEE HYDROELECTRIC PLANT) |
|---|---|
| Permittee as filed | Georgia Power Company |
| NPDES ID | GA0004154 |
| Permit status | Effective |
| Permit type | Individual permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Issued | March 16, 2017 |
| Expiration date | March 31, 2022 |
| Address | Lakemont, GA 30552 |
| Subwatershed | Lower Brasstown Creek (HUC 060200020302) |
| NAICS | 221111 – Hydroelectric Power Generation |
| SIC | 4911 – Electric Services |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 1Pollutants on file
- 0Under a numeric limit
- 1With a violation of any kind
- 0With an effluent exceedance
An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.
| Pollutant or measure | Limits | Violations, any kind | Effluent exceedances | Latest exceedance | Largest exceedance, as filed |
|---|---|---|---|---|---|
| Flow, in conduit or thru treatment plant | 0 | 292 | 0 |
EPA’s effluent violation file records no exceedance of a numeric limit for NPDES GA0004154.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES GA0004154.
Inspections
EPA’s inspection file holds no inspection for NPDES GA0004154.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES GA0004154.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GA0004154.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID GA0004154 there.
GEORGIA POWER COMPANY (NACOOCHEE HYDROELECTRIC PLANT), Lakemont, Georgia: Individual permit GA0004154, held by Georgia Power Company; Effective; issued March 16, 2017, term to March 31, 2022; Hydroelectric Power Generation.
- Flow, in conduit or thru treatment plant: 0 limits, 292 violations of any kind.
Other permits held by Georgia Power Company
- MCDONOUGH-ATKINSON COMBINED-CYCLE FACILITY, Smyrna: GA0001431, issued 2016-04-20
- GEORGIA POWER COMPANY (PLANT BOWEN), Cartersville: GA0001449, issued 2007-11-09
- GEORGIA POWER COMPANY (PLANT HAMMOND), Rome: GA0001457, issued 2024-03-22
- GEORGIA POWER COMPANY (PLANT MITCHELL), Albany: GA0001465, issued 2017-08-18
- GEORGIA POWER COMPANY (PLANT YATES), Newnan: GA0001473, issued 2019-03-01
- GEORGIA POWER COMPANY (GOAT ROCK HYDROELECTRIC PLANT), Fortson: GA0001503, issued 2018-09-28
- GEORGIA POWER COMPANY (MORGAN FALLS HYDROELECTRIC PLANT), Dunwoody: GA0001511, issued 2017-06-26
- GEORGIA POWER COMPANY (OLIVER DAM HYDROELECTRIC PLANT), Columbus: GA0001520, issued 2018-09-28
- GEORGIA POWER COMPANY (NORTH HIGHLANDS HYDROELECTRIC PLANT), Columbus: GA0001538, issued 2018-09-28
- GEORGIA POWER COMPANY (FLINT RIVER HYDROELECTRIC PLANT), Albany: GA0001546, issued 2018-09-28
GEORGIA POWER COMPANY (NACOOCHEE HYDROELECTRIC PLANT) among its neighbors
100 discharge permits are in the Lower Brasstown Creek subwatershed (HUC 060200020302); GA0004154 is one. Its county: 17, 1 major; GA0004154 is minor permit.
Other permits in the Lower Brasstown Creek subwatershed (HUC 060200020302)
- (J-425) UNIVERSITY OF NORTH GEORGIA - STEM BUILDING, Dahlonega: GAR18C1D3, minor, term to 2028-07-31
- A&D CAMPING, LLC (BLUE RIDGE RV RESORT WPCP), Mineral Bluff: GAJ040048, minor, term to 2028-05-31
- BALDWIN, CITY OF (BALDWIN WPCP), Cornelia: GA0033243, minor, term to 2024-01-31
- BALDWIN, CITY OF (BALDWIN WTP), Baldwin: GAG640036, minor, term to 2025-12-31
- BLAIRSVILLE, CITY OF (BLAIRSVILLE WPCP), Blairsville: GA0033375, minor, term to 2018-12-31
- BLUE RIDGE HYDRO PLANT, Blue Ridge: GA0026948, minor, term to 2024-12-31
- BLUE RIDGE, CITY OF (BLUE RIDGE WPCP), Blue Ridge: GA0037583, major, term to 2020-09-30
- BRANNON RIDGE RESERVE LOT 8, Unknown: GAR381136, minor, term to 2018-07-31
- BROWN HAVEN HOMES- UNION COUNTY SUBDIVISION, Blairsville: GAR18C1BF, minor, term to 2028-07-31
- C.W. MATTHEWS ? BLAIRSVILLE ASPHALT PLANT #15, Blairsville: GAIS14686, minor, term to 2027-05-31
Nearby on the register
- Discharge permits in Lakemont
- Every permit record in Lakemont, A to Z
- Discharge permits in Georgia
- Every permit record in Georgia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The GEORGIA POWER COMPANY (NACOOCHEE HYDROELECTRIC PLANT) permit is one of 6 individual permits in Rabun County, and 100.0% of those 6 permits have a violation on file. Among all 6 individual permits in Rabun County, 16.7% carry an earlier issue date than this one, and the permit sits within a subwatershed that holds 97 NPDES permits, this one included. The permit shows no pollutants under a numeric limit and no effluent exceedances.