NPDES GAR394AD3 · Clean Water Act
HAMILTON LAKES PHASE 1 & 2 (FORMERLY KNOWN AS RAVENWOOD LAKES), Loganville, GA: NPDES GAR394AD3 discharge permit, effluent exceedances, inspections, penalties
HAMILTON LAKES PHASE 1 & 2 (FORMERLY KNOWN AS RAVENWOOD LAKES), Loganville, Georgia: General permit coverage GAR394AD3, held by DRB Group; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; New Single-Family Housing Construction [except For-Sale Builders].
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR394AD3. DRB Group holds 14 permits in Georgia.
Other permits held by DRB Group
- TRADITIONS AT CRYSTAL LAKE PHASE 3 LOT 298, Hampton: GAR395210, issued 2023-08-01
- BERKELEY LAKES LOT 1, Mcdonough: GAR395DCB, issued 2018-08-01
- BERKELEY LAKES LOT 2, Mcdonough: GAR395DCC, issued 2018-08-01
- BERKELEY LAKES LOT 3, Mcdonough: GAR395DCE, issued 2018-08-01
- LANGLEY OVERLOOK, Loganville: GAR39650E, issued 2023-08-01
- NORTHCROFT, Loganville: GAR396B47, issued 2023-08-01
- BARRETT POINTE, Kennesaw: GAR396B48, issued 2023-08-01
- CURRY BEND, Fairburn: GAR396C1C, issued 2023-08-01
- ANSLEY TRAILS SUBDIVISION, Douglasville: GAR396F8E, issued 2023-08-01
- AMBROSIA, Mcdonough: GAR397079, issued 2023-08-01
Coverages issued nearest GAR394AD3
- 2023-08-01: CROSSVINE VILLAGE PHASE II, Lagrange: GAR394ACC, held by Not Applicable
- 2023-08-01: FIELDSTONE, PHASE 4, Centerville: GAR394ACD, held by Lennar Georgia, LLC
- 2023-08-01: NORTH HAVEN SUBDIVISION, Rome: GAR394ACF, held by Buildmore Enterprise Services
- 2023-08-01: THE SUMMIT, Dahlonega: GAR394AD0, held by Lindsay Ewing
- 2023-08-01: SUGAR CREEK SUBDIVISION PHASE 2, Perry: GAR394AD2, held by Cal-Mar Homes
- 2023-08-01: HARBIN WOODS LOT 51 (PIERCE), Blarsville: GAR394AE4, held by Scott Pierce
- 2023-08-01: GRANDVIEW, Jasper: GAR394AE6, held by Bagwell & Spears, Inc
- 2023-08-01: VINEYARD AT YUKON PHASE 5 LOT 177, Ellijay: GAR394AE7, held by Michelle A Laduca
- 2023-08-01: VINEYARD AT YUKON PHASE 5 LOT 177, Ellijay: GAR394AE8, held by Michelle A Laduca
- 2023-08-01: LANE CREEK PLANTATION - LOT 43C, Bishop: GAR394AEF, held by RAC Properties
HAMILTON LAKES PHASE 1 & 2 (FORMERLY KNOWN AS RAVENWOOD LAKES) among its neighbors
118 discharge permits are in the Bay Creek subwatershed (HUC 030701030703); GAR394AD3 is one.
Other permits in the Bay Creek subwatershed (HUC 030701030703)
- 2421 WEVOK WAY, GRAYSON, GA 30017 LOT 1A, Grayson: GAR375842, minor, term to 2018-07-31
- 2471 WEVOK WAY, GRAYSON, GA 30017, Grayson: GAR376061, minor, term to 2018-07-31
- 2521 WEVOK WAY, GRAYSON, GA 30017, Grayson: GAR376052, minor, term to 2018-07-31
- 2531 WEVOK WAY, GRAYSON, GA 30017, Grayson: GAR376045, minor, term to 2018-07-31
- ASHLAND FALLS - LOT 1, Unknown: GAR381782, minor, term to 2018-07-31
- ASHLAND FALLS - LOT 38, Unknown: GAR381786, minor, term to 2018-07-31
- ASHLAND FALLS - LOT 50, Unknown: GAR381787, minor, term to 2018-07-31
- ASHLAND FALLS - LOT 51, Unknown: GAR381788, minor, term to 2018-07-31
- ASHLAND FALLS - LOTS 25 & 27, Unknown: GAR381784, minor, term to 2018-07-31
- ASHLAND FALLS - LOTS 30, 40, 45, Unknown: GAR381772, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HAMILTON LAKES PHASE 1 & 2 (FORMERLY KNOWN AS RAVENWOOD LAKES) |
|---|---|
| Permittee | DRB Group |
| NPDES ID | GAR394AD3 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Loganville, GA 30052 |
| Subwatershed | Bay Creek (HUC 030701030703) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1521 – Single-Family Housing Construction |
NPDES GAR394AD3: effluent limits and exceedances
HAMILTON LAKES PHASE 1 & 2 (FORMERLY KNOWN AS RAVENWOOD LAKES) (NPDES GAR394AD3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR394AD3: no pollutant row on file.
NPDES GAR394AD3: inspections, violations and enforcement
NPDES GAR394AD3 (HAMILTON LAKES PHASE 1 & 2 (FORMERLY KNOWN AS RAVENWOOD LAKES)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR394AD3
NPDES GAR394AD3: one email when its EPA record changes — $99/month.
Permits near NPDES GAR394AD3
NPDES GAR394AD3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.