NPDES GAR396B48 · Clean Water Act
BARRETT POINTE, Kennesaw, GA: NPDES GAR396B48 discharge permit, effluent exceedances, inspections, penalties
BARRETT POINTE, Kennesaw, Georgia: General permit coverage GAR396B48, held by DRB Group; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR396B48. DRB Group holds 14 permits in Georgia.
Other permits held by DRB Group
- HAMILTON LAKES PHASE 1 & 2 (FORMERLY KNOWN AS RAVENWOOD LAKES), Loganville: GAR394AD3, issued 2023-08-01
- TRADITIONS AT CRYSTAL LAKE PHASE 3 LOT 298, Hampton: GAR395210, issued 2023-08-01
- BERKELEY LAKES LOT 1, Mcdonough: GAR395DCB, issued 2018-08-01
- BERKELEY LAKES LOT 2, Mcdonough: GAR395DCC, issued 2018-08-01
- BERKELEY LAKES LOT 3, Mcdonough: GAR395DCE, issued 2018-08-01
- LANGLEY OVERLOOK, Loganville: GAR39650E, issued 2023-08-01
- NORTHCROFT, Loganville: GAR396B47, issued 2023-08-01
- CURRY BEND, Fairburn: GAR396C1C, issued 2023-08-01
- ANSLEY TRAILS SUBDIVISION, Douglasville: GAR396F8E, issued 2023-08-01
- AMBROSIA, Mcdonough: GAR397079, issued 2023-08-01
Coverages issued nearest GAR396B48
- 2023-08-01: 1740 CATO RD, Greensboro: GAR396B43, held by Heather Black
- 2023-08-01: GRAND OAK VILLAGE, Valdosta: GAR396B44, held by Trevor Shaw
- 2023-08-01: DOBBS LANDING, Covington: GAR396B45, held by Brian Walker
- 2023-08-01: SOUTHLAND STATION SUBDIVISION DEVELOPMENT, Warner Robins: GAR396B46, held by Dylan Wingate
- 2023-08-01: NORTHCROFT, Loganville: GAR396B47, held by DRB Group
- 2023-08-01: 1248 TANYARD CREEK DRIVE - LOT 53, Thomson: GAR396B49, held by Kerry Sherrill
- 2023-08-01: FOX CREEK LOT 46, Haddock: GAR396B4A, held by Buyside Capital Advisors
- 2023-08-01: TWIN RIVERS PHASE 4 LOT 60, Covington: GAR396B4C, held by Century Complete Homes
- 2023-08-01: TWIN RIVERS PHASE 4 LOT 62, Covington: GAR396B4E, held by Century Complete Homes
- 2023-08-01: TWIN RIVERS PHASE 4 LOT 63, Covington: GAR396B4F, held by Century Complete Homes
BARRETT POINTE among its neighbors
127 discharge permits are in the Upper Noonday Creek subwatershed (HUC 031501040807); GAR396B48 is one.
Other permits in the Upper Noonday Creek subwatershed (HUC 031501040807)
- 3000 COBB INTERNATIONAL BLVD, Kennesaw: GAR151915, minor, term to 2018-07-31
- 4145 GEORGE BUSBEE PARKWAY NW, Kennesaw: GAR18C054, minor, term to 2028-07-31
- 481 PIEDMONT ROAD SUBDIVISION (HAVEN POINTE) LOT 1, Marietta: GAR385EB2, minor, term to 2018-07-31
- 481 PIEDMONT ROAD SUBDIVISION (HAVEN POINTE) LOT 2, Marietta: GAR383D7E, minor, term to 2018-07-31
- 481 PIEDMONT ROAD SUBDIVISION (HAVEN POINTE) LOT 3, Marietta: GAR383202, minor, term to 2018-07-31
- 481 PIEDMONT ROAD SUBDIVISION (HAVEN POINTE) LOT 7, Marietta: GAR385DFF, minor, term to 2018-07-31
- ASHTON GARDENS ATLANTA WEST, Marietta: GAR149579, minor, term to 2018-07-31
- ATLANTA KNIGHTS SPORTS CENTER, Marietta: GAR148598, minor, term to 2018-07-31
- AVIATION PARK, Kennesaw: GAR152997, minor, term to 2018-07-31
- BELLS FERRY ES MODULAR BUILDINGS, Marietta: GAR18B35C, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BARRETT POINTE |
|---|---|
| Permittee | DRB Group |
| NPDES ID | GAR396B48 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Kennesaw, GA 30144 |
| Subwatershed | Upper Noonday Creek (HUC 031501040807) |
NPDES GAR396B48: effluent limits and exceedances
BARRETT POINTE (NPDES GAR396B48): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR396B48: no pollutant row on file.
NPDES GAR396B48: inspections, violations and enforcement
NPDES GAR396B48 (BARRETT POINTE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR396B48
NPDES GAR396B48: one email when its EPA record changes — $99/month.
Permits near NPDES GAR396B48
NPDES GAR396B48: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.