NPDES GAR3959F6 · Clean Water Act
THE PENINSULA S/D, LOT 4, 220 PENINSULA AVE, MBC, ESPCP & SEPTIC DESIGN, Macon, GA: NPDES GAR3959F6 discharge permit, effluent exceedances, inspections, penalties
THE PENINSULA S/D, LOT 4, 220 PENINSULA AVE, MBC, ESPCP & SEPTIC DESIGN, Macon, Georgia: General permit coverage GAR3959F6, held by Joel Davis; Construction stormwater; Effective; issued August 1, 2018, term to January 31, 2025.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 30,681 were issued before GAR3959F6.
Coverages issued nearest GAR3959F6
- 2018-08-01: LOT 130 HIGH RIVER, Ellijay: GAR3959DB, held by Mamta Borole & Sumeet Chaudhari
- 2018-08-01: LOT 153 HIGH RIVER, Ellijay: GAR3959DC, held by Carl Winters
- 2018-08-01: HEARTWOOD POD 6, Richmond Hill: GAR3959F1, held by LMS Real Estate Management, LLC
- 2018-08-01: GREER / SOUTHERN LUXURY HOMES JR0119, Greensboro: GAR3959F2, held by Southern Luxury Homes / Greer
- 2018-08-01: LOT 3 EAGLES WAY, Eatonton: GAR3959F4, held by GREEN PARK HOMES, LLC
- 2018-08-01: LEDGESTONE SUBDIVISION, Lawrenceville: GAR395A2E, held by Lebanon Road - Lawrenceville, L.P. c/o Hearthstone, Inc.
- 2018-08-01: HIDDEN HARBOR LOT 37, Greensboro: GAR395A30, held by Waterford Homes
- 2018-08-01: HARBOR CLUB - WATERFORD HOMES (LOT 1130) BAKER RESIDENCE, Greensboro: GAR395A31, held by Waterford Homes
- 2018-08-01: SHEFFIELD HIGHLANDS UNIT 1 PHASE 2, Dallas: GAR395A37, held by D.R. Horton
- 2018-08-01: LAKE ARROWHEAD PHASE 2 UNIT 12, Waleska: GAR395A39, held by Matthew Wilkes
THE PENINSULA S/D, LOT 4, 220 PENINSULA AVE, MBC, ESPCP & SEPTIC DESIGN among its neighbors
65 discharge permits are in the Lake Tobesofkee subwatershed (HUC 030701031405); GAR3959F6 is one.
Other permits in the Lake Tobesofkee subwatershed (HUC 030701031405)
- 1638 BONNER GILBERT RD, MBC, ESPCP, Macon: GAR3973FD, minor, term to 2028-07-31
- 504 BLUEWATER BAY DR, Macon: GAR18BCDA, minor, term to 2028-07-31
- 6375 MOSELEY DIXON RD, MBC, ESPCP & SEPTIC, Macon: GAR397407, minor, term to 2028-07-31
- ARROWHEAD BY THE LAKE, PHASE 3, Macon: GAR397429, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 21, Macon: GAR395295, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 22, Macon: GAR395296, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 23, Macon: GAR39679D, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 24, Macon: GAR39679E, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 25, Macon: GAR395570, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 26, Macon: GAR39679F, minor, term to 2028-07-31
What stands out
- Its term runs 6 years and 183 days, August 1, 2018 to January 31, 2025; the term ended 592 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE PENINSULA S/D, LOT 4, 220 PENINSULA AVE, MBC, ESPCP & SEPTIC DESIGN |
|---|---|
| Permittee | Joel Davis |
| NPDES ID | GAR3959F6 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2018 |
| Expires | January 31, 2025 |
| Address | Macon, GA 31220 |
| Subwatershed | Lake Tobesofkee (HUC 030701031405) |
NPDES GAR3959F6: effluent limits and exceedances
THE PENINSULA S/D, LOT 4, 220 PENINSULA AVE, MBC, ESPCP & SEPTIC DESIGN (NPDES GAR3959F6): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR3959F6: no pollutant row on file.
NPDES GAR3959F6: inspections, violations and enforcement
NPDES GAR3959F6 (THE PENINSULA S/D, LOT 4, 220 PENINSULA AVE, MBC, ESPCP & SEPTIC DESIGN): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR3959F6
NPDES GAR3959F6: one email when its EPA record changes — $99/month.
Permits near NPDES GAR3959F6
NPDES GAR3959F6: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.