Velarion Records
Free: one email when NPDES IDR10019G changes. Unsubscribe any time.

NPDES IDR10019G · Clean Water Act

2018 DOWNTOWN BOISE IMPLEMENTATION, Boise, ID: NPDES IDR10019G discharge permit, effluent exceedances, inspections, penalties

2018 DOWNTOWN BOISE IMPLEMENTATION, Boise, Idaho: General permit coverage IDR10019G, held by Sunroc Construction; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file.

2018 DOWNTOWN BOISE IMPLEMENTATION among its neighbors

132 discharge permits are in the Crane Creek-Boise River subwatershed (HUC 170501140403); IDR10019G is one.

Other permits in the Crane Creek-Boise River subwatershed (HUC 170501140403)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

Facility2018 DOWNTOWN BOISE IMPLEMENTATION
PermitteeSunroc Construction
NPDES IDIDR10019G
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressBoise, ID 83702
Receiving water impaired303(D) Listed
SubwatershedCrane Creek-Boise River (HUC 170501140403)

NPDES IDR10019G: effluent limits and exceedances

2018 DOWNTOWN BOISE IMPLEMENTATION (NPDES IDR10019G): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10019G: no pollutant row on file.

NPDES IDR10019G: inspections, violations and enforcement

NPDES IDR10019G (2018 DOWNTOWN BOISE IMPLEMENTATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10019G

NPDES IDR10019G: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10019G

NPDES IDR10019G: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.