NPDES IDR10L08C · Clean Water Act
11TH ST MTCE & BIKEWAY PROJECT PHASE 2, Boise, ID: NPDES IDR10L08C discharge permit, effluent exceedances, inspections, penalties
11TH ST MTCE & BIKEWAY PROJECT PHASE 2, Boise, Idaho: General permit coverage IDR10L08C, held by Ada County Highway District; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Ada County Highway District holds 36 permits in Idaho.
Other permits held by Ada County Highway District
- W 4TH STREET, BROADWAY AVE TO MAPLE AVE, Meridian: IDR100011
- CAMERON @ FAIRFIELD PEDESTRIAN IMPROVEMENTS PROJECTS, Boise: IDR10009W
- ALPINE ST, ORCHARD ST TO RANDALL ST, Boise: IDR10009X
- PLAZA DRIVE EXPANSION, Eagle: IDR1000AF
- JEFFERSON ST. AND MADISON ST FROM WHITEWATER PARK TO 27TH ST, Boise: IDR1000G7
- W CAMAS ST PEDESTRIAN IMPROVEMENTS, Boise: IDR1000G8
- EMERALD ST. & AMERICANA BLVD. IMPROVEMENTS, Boise: IDR1000Y1
- ORCHARD ST. INTERIM TRAFFIC IMPROVEMENTS, Boise: IDR10012E
- 2018 RESIDENTIAL CAPITAL MAINTENANCE, Boise: IDR100138
- 2018 ROADWAY AND PEDESTRIAN IMPROVMENTS, Boise: IDR100146
11TH ST MTCE & BIKEWAY PROJECT PHASE 2 among its neighbors
132 discharge permits are in the Crane Creek-Boise River subwatershed (HUC 170501140403); IDR10L08C is one.
Other permits in the Crane Creek-Boise River subwatershed (HUC 170501140403)
- 11TH STREET MAINTENANCE & BIKEWAY - PHASE 2, Boise: IDR10L08B
- 1250 S. DIVISION AVE., Boise: IDR1002V8, minor, term to 2022-02-15
- 2018 DOWNTOWN BOISE IMPLEMENTATION, Boise: IDR10017Z
- 2018 DOWNTOWN BOISE IMPLEMENTATION, Boise: IDR10019G
- 2018 RESIDENTIAL CAPITAL MAINTENANCE, Boise: IDR100138
- 2020 DOWNTOWN BOISE IMPLEMENTATION PLAN: 9TH ST, UNIVERSITY DRIVE TO FRONT ST, Boise: IDR10034X
- 24TH & MAIN STREET DEMOLITION - BOISE MARINE, Boise: IDR1000NX
- 5 CR IMPROVEMENT, Nampa: IDR1001TB
- 5TH AND MYRTLE TEMP PARKING LOT, Boise: IDR1000ZX
- 8TH ST BIKEWAY & STREETSCAPE, Boise: IDR10L0GO
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | 11TH ST MTCE & BIKEWAY PROJECT PHASE 2 |
|---|---|
| Permittee | Ada County Highway District |
| NPDES ID | IDR10L08C |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Boise, ID 83702 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Crane Creek-Boise River (HUC 170501140403) |
NPDES IDR10L08C: effluent limits and exceedances
11TH ST MTCE & BIKEWAY PROJECT PHASE 2 (NPDES IDR10L08C): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10L08C: no pollutant row on file.
NPDES IDR10L08C: inspections, violations and enforcement
NPDES IDR10L08C (11TH ST MTCE & BIKEWAY PROJECT PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10L08C
NPDES IDR10L08C: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10L08C
NPDES IDR10L08C: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.