NPDES IDR10021B · Clean Water Act
CRESCENT LAKE SUBDIVISION, Middleton, ID: NPDES IDR10021B discharge permit, effluent exceedances, inspections, penalties
CRESCENT LAKE SUBDIVISION, Middleton, Idaho: General permit coverage IDR10021B, held by HMH Construction, LLC; Construction stormwater; Administratively continued; issued September 6, 2019, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 69 were issued before IDR10021B. HMH Construction, LLC holds 8 permits in Idaho.
Other permits held by HMH Construction, LLC
- STEEL NATIONAL GRADING AND DRAINAGE, Caldwell: IDR1002FB
- CRESCENT LAKES SUBDIVISION NO. 2, Middleton: IDR1002FL, issued 2020-04-17
- CIRRUS POINTE BY THE LAKE PHASE 3, Caldwell: IDR10033B, issued 2021-04-21
- DENNIS DILLON RV STORAGE, Boise: IDR10036R, issued 2021-06-15
- SHAFER VIEW TERRACE SUBDIVISION PHASE 1, Meridian: IDR10C02S, issued 2021-10-27
- VISTA RIM TOWNHOMES, Twin Falls: IDR10C0G2, issued 2022-07-06
- MOUNTAIN VIEW TOWN HOMES, Garden City: IDR10C0PE, issued 2023-04-06
Coverages issued nearest IDR10021B
- 2019-08-06: SABANA SUBDIVISION, Meridian: IDR1001Z9, held by Challenger Development, Inc.
- 2019-08-13: CREATION ROW SUBDIVISION, Garden City: IDR1001ZT, held by Perryman Construction
- 2019-08-14: WINDSOR CREEK SUBDIVISION NO. 6, Caldwell: IDR1001ZU, held by Challenger Development, Inc.
- 2019-08-26: COPPER RIVER BASIN SUBDIVISION NO. 8, Nampa: IDR10020J, held by Challenger Development, Inc.
- 2019-08-30: EDGEHILL SUBDIVISION NO. 2, Meridian: IDR10020S, held by Challenger Development, Inc.
- 2019-09-11: LINDER VILLAGE CENTRE, Meridian: IDR10021Y, held by the Russell Corporation
- 2019-09-19: VIRGINIA PARK SUBDIVISION NO. 11, Caldwell: IDR10022H, held by Challenger Development, Inc.
- 2019-09-19: NEW YORK LANDING SUBDIVISION NO. 1, Nampa: IDR10022I, held by Challenger Development, Inc.
- 2019-10-01: IDAHO FALLS EVENT CENTER PHASE I SITE & PIONEER ROAD IMPROVEMENTS PHASE II, Idaho Falls: IDR100236, held by Bateman-Hall, Inc.
- 2019-10-02: IDAHO FALLS EVENT CENTER PHASE I SITE & PIONEER ROAD IMPROVEMENTS PHASE II, Idaho Falls: IDR100238, held by City of Idaho Falls Auditorium District
CRESCENT LAKE SUBDIVISION among its neighbors
197 discharge permits are in the Mill Slough-Boise River subwatershed (HUC 170501140410); IDR10021B is one.
Other permits in the Mill Slough-Boise River subwatershed (HUC 170501140410)
- 1ST STREET TOWNHOMES SUBDIVISION, Star: IDR10C20H, minor, term to 2027-02-09
- 2684 BEACON LIGHT IMPROVEMENT PROJECT, Eagle: IDR10C1O0, minor, term to 2027-02-09
- 9335 SH-44 4 ACRE LOT, Middleton: IDR1002ZU
- ACHD LINDRE: SH44 TO FLOATING FEATHER, Eagle: IDR10C1TT, minor, term to 2027-02-09
- AMBERLY RANCH SUBDIVISION, Eagle: IDR10L0FX
- AMERICAN STAR SUBDIVISION NO. 2, Star: IDR1002TO, minor, term to 2022-02-15
- AMERICAN STAR SUBDIVISION NO. 3, Star: IDR10C05M, minor, term to 2022-02-16
- ARTESIAN SPRINGS SUBDIVISION, Middleton: IDR10C1JY, minor, term to 2027-02-09
- ARVORY CREST SUBDIVISION PHASE 4, Star: IDR10C1YC, minor, term to 2027-02-09
- BALD EAGLE POINTE SUBDIVISION NO. 1, Eagle: IDR1002PH, minor, term to 2022-02-15
What stands out
- Its term runs 2 years and 162 days, September 6, 2019 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CRESCENT LAKE SUBDIVISION |
|---|---|
| Permittee | HMH Construction, LLC |
| NPDES ID | IDR10021B |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 6, 2019 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Middleton, ID 83644 |
| Subwatershed | Mill Slough-Boise River (HUC 170501140410) |
NPDES IDR10021B: effluent limits and exceedances
CRESCENT LAKE SUBDIVISION (NPDES IDR10021B): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10021B: no pollutant row on file.
NPDES IDR10021B: inspections, violations and enforcement
NPDES IDR10021B (CRESCENT LAKE SUBDIVISION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10021B
NPDES IDR10021B: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10021B
NPDES IDR10021B: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.