Velarion Records
Free: one email when NPDES IDR10033B changes. Unsubscribe any time.

NPDES IDR10033B · Clean Water Act

CIRRUS POINTE BY THE LAKE PHASE 3, Caldwell, ID: NPDES IDR10033B discharge permit, effluent exceedances, inspections, penalties

CIRRUS POINTE BY THE LAKE PHASE 3, Caldwell, Idaho: General permit coverage IDR10033B, held by HMH Construction, LLC; Construction stormwater; Administratively continued; issued April 21, 2021, term to February 15, 2022, by U.S. EPA.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 276 were issued before IDR10033B. HMH Construction, LLC holds 8 permits in Idaho.

Other permits held by HMH Construction, LLC

Coverages issued nearest IDR10033B

CIRRUS POINTE BY THE LAKE PHASE 3 among its neighbors

358 discharge permits are in the Lower Indian Creek subwatershed (HUC 170501140507); IDR10033B is one.

Other permits in the Lower Indian Creek subwatershed (HUC 170501140507)

What stands out

  • Its term runs 300 days, April 21, 2021 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityCIRRUS POINTE BY THE LAKE PHASE 3
PermitteeHMH Construction, LLC
NPDES IDIDR10033B
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedApril 21, 2021
ExpiresFebruary 15, 2022
AgencyU.S. EPA
AddressCaldwell, ID 83605
SubwatershedLower Indian Creek (HUC 170501140507)

NPDES IDR10033B: effluent limits and exceedances

CIRRUS POINTE BY THE LAKE PHASE 3 (NPDES IDR10033B): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10033B: no pollutant row on file.

NPDES IDR10033B: inspections, violations and enforcement

NPDES IDR10033B (CIRRUS POINTE BY THE LAKE PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10033B

NPDES IDR10033B: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10033B

NPDES IDR10033B: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.