NPDES IDR1002OT · Clean Water Act
ARBOR RIDGE SUBDIVISION NO. 7, Kuna, ID: NPDES IDR1002OT discharge permit, effluent exceedances, inspections, penalties
ARBOR RIDGE SUBDIVISION NO. 7, Kuna, Idaho: General permit coverage IDR1002OT, held by Challenger Development, Inc.; Construction stormwater; Administratively continued; issued September 16, 2020, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 150 were issued before IDR1002OT. Challenger Development, Inc. holds 126 permits in Idaho.
Other permits held by Challenger Development, Inc.
- BARNWOOD SUBDIVISION NO. 1, Boise: IDR1000Z6, issued 2018-03-09
- BARAYA APARTMENTS SUBDIVISION, Meridian: IDR1001E3, issued 2018-09-25
- BROOKDALE ESTATES SUBDIVISION NO. 6 & 7, Namapa: IDR1001IH, issued 2018-11-30
- BARAYA SUBDIVISION NO. 3 & 4, Meridian: IDR1001LO, issued 2019-02-12
- ARBOR RIDGE SUBDIVISION NO. 6, Kuna: IDR1001MY, issued 2019-02-26
- CEDAR CROSSING SUBDIVISION NO. 4, Caldwell: IDR1001P1, issued 2019-03-25
- MERIWETHER PARK SUBDIVISION NO. 3, Nampa: IDR1001PE, issued 2019-03-28
- FALCON VALLEY SUBDIVISION NO. 6, Middleton: IDR1001PM, issued 2019-03-28
- MEMORY RANCH SUBDIVISION NO. 3, Meridian: IDR1001RY, issued 2019-04-26
- DOVER PLACE SUBDIVISION NO. 1 & 2, Caldwell: IDR1001TR, issued 2019-05-15
Coverages issued nearest IDR1002OT
- 2020-09-09: SH-55, SMITHS FERRY TO ROUND VALLEY KN01004, Smiths Ferry: IDR1002OB, held by Idaho Transportation Department
- 2020-09-11: CITY OF POST FALLS, IDAHO WRF TERTIARY TREATMENT IMPROVEMENTS, Post Falls: IDR1002OG, held by Sletten Construction Companies
- 2020-09-15: DRY CREEK RANCH VILLAGE SUBDIVISION NO 1, Boise: IDR1002OM, held by Brookside Developers, Inc.
- 2020-09-15: SKY MESA HIGHLANDS SUBDIVISION NO 1, Meridian: IDR1002ON, held by Woodside Harris, LLC
- 2020-09-16: GRAN PRADO SUBDIVISION NO 2, Meridian: IDR1002OS, held by DB Development, LLC
- 2020-09-16: MADRONE HEIGHTS SUBDIVISION NO. 1, Kuna: IDR1002OU, held by DB Development, LLC
- 2020-09-16: SPRINGHILL SUBDIVISION NO. 2, Meridian: IDR1002OV, held by DB Development, LLC
- 2020-09-18: UNIVERSITY PARK, Sandpoint: IDR1002P2, held by Lippert Excavation and Pipeline, Inc
- 2020-09-18: UNIVERSITY PARK, Sandpoint: IDR1002P3, held by K-M Enterprises of Idaho, LLC
- 2020-09-23: WHITECLIFFE ESTATES SUBDIVISION NO. 2, Meridian: IDR1002P8, held by 943 W. MCMILLAN RD LLC
ARBOR RIDGE SUBDIVISION NO. 7 among its neighbors
358 discharge permits are in the Lower Indian Creek subwatershed (HUC 170501140507); IDR1002OT is one.
Other permits in the Lower Indian Creek subwatershed (HUC 170501140507)
- 11TH AVE S 2-WAY CONVERSION CITY OF NAMPA, Nampa: IDR10L0LN
- 11TH AVE S TWO-WAY CONVERSION, Nampa: IDR10L0LO
- 12TH-15TH 2ND-7TH ST. SOUTH WATERLINES REPLACEMENT, Nampa: IDR10C27N, minor, term to 2027-02-09
- 1908 SUNNY RIDGE, Nampa: IDR1001JD
- 1ST ST. & ROOSEVELT AVE. WATERLINE, Nampa: IDR1000GJ
- 2025 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C1UW, minor, term to 2027-02-09
- 203 AND 212 1ST AVE., Nampa: IDR10L0J9
- 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, minor, term to 2027-02-09
- 24229 MIDDLETON RD, SH 55 TO FLAMINGO AVE, Nampa: IDR10L0LR
- 6TH STREET MULTI-PLEXES, Nampa: IDR1001D8
What stands out
- Its term runs 1 year and 152 days, September 16, 2020 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ARBOR RIDGE SUBDIVISION NO. 7 |
|---|---|
| Permittee | Challenger Development, Inc. |
| NPDES ID | IDR1002OT |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 16, 2020 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Kuna, ID 83634 |
| Subwatershed | Lower Indian Creek (HUC 170501140507) |
NPDES IDR1002OT: effluent limits and exceedances
ARBOR RIDGE SUBDIVISION NO. 7 (NPDES IDR1002OT): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR1002OT: no pollutant row on file.
NPDES IDR1002OT: inspections, violations and enforcement
NPDES IDR1002OT (ARBOR RIDGE SUBDIVISION NO. 7): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR1002OT
NPDES IDR1002OT: one email when its EPA record changes — $99/month.
Permits near NPDES IDR1002OT
NPDES IDR1002OT: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.