NPDES IDR1002P2 · Clean Water Act
UNIVERSITY PARK, Sandpoint, ID: NPDES IDR1002P2 discharge permit, effluent exceedances, inspections, penalties
UNIVERSITY PARK, Sandpoint, Idaho: General permit coverage IDR1002P2, held by Lippert Excavation and Pipeline, Inc; Construction stormwater; Administratively continued; issued September 18, 2020, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 154 were issued before IDR1002P2.
Coverages issued nearest IDR1002P2
- 2020-09-15: SKY MESA HIGHLANDS SUBDIVISION NO 1, Meridian: IDR1002ON, held by Woodside Harris, LLC
- 2020-09-16: GRAN PRADO SUBDIVISION NO 2, Meridian: IDR1002OS, held by DB Development, LLC
- 2020-09-16: ARBOR RIDGE SUBDIVISION NO. 7, Kuna: IDR1002OT, held by Challenger Development, Inc.
- 2020-09-16: MADRONE HEIGHTS SUBDIVISION NO. 1, Kuna: IDR1002OU, held by DB Development, LLC
- 2020-09-16: SPRINGHILL SUBDIVISION NO. 2, Meridian: IDR1002OV, held by DB Development, LLC
- 2020-09-18: UNIVERSITY PARK, Sandpoint: IDR1002P3, held by K-M Enterprises of Idaho, LLC
- 2020-09-23: WHITECLIFFE ESTATES SUBDIVISION NO. 2, Meridian: IDR1002P8, held by 943 W. MCMILLAN RD LLC
- 2020-09-23: SOUTHSIDE MULTIFAMILY APARTMENTS - PHASE 1, Nampa: IDR1002PA, held by Perryman Construction Management, Inc.
- 2020-09-29: BALD EAGLE POINTE SUBDIVISION NO. 1, Eagle: IDR1002PH, held by Woodbridge Pacific Group
- 2020-09-30: TETON MESA APARTMENTS, Idaho Falls: IDR1002PQ, held by Jared Arnell
UNIVERSITY PARK among its neighbors
36 discharge permits are in the Sand Creek subwatershed (HUC 170102140205); IDR1002P2 is one.
Other permits in the Sand Creek subwatershed (HUC 170102140205)
- AIRPORT, Sandpoint: IDR10C1SZ, minor, term to 2027-02-09
- BASE CAMP, Sandpoint: IDR10C105, minor, term to 2027-02-09
- BIG SKY DEVELOPMENT - SPIRES PUD 2ND ADDITION, Sandpoint: IDR10CO38
- BIG SKY DEVELOPMENT - THE SPIRES PUD 1ST ADDITION, Sandpoint: IDR10CF85
- BOYER COMMERS PARK, Sandpoint: IDR10C20C, minor, term to 2027-02-09
- BOYER FARM ESTATES, Sandpoint: IDR10C0KY, minor, term to 2027-02-09
- BOYER HANGERS, Sandpoint: IDR10L0LG
- BRONX ROAD SUBSTATION, Sandpoint: IDR10C24E, minor, term to 2027-02-09
- CEDARS AT SANDCREEK, Sandpoint: IDR10BK79
- CEDARS BLOCK 2, Sandpoint: IDR10L00F, term to 2021-10-06
What stands out
- Its term runs 1 year and 150 days, September 18, 2020 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | UNIVERSITY PARK |
|---|---|
| Permittee | Lippert Excavation and Pipeline, Inc |
| NPDES ID | IDR1002P2 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 18, 2020 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Sandpoint, ID 83864 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Sand Creek (HUC 170102140205) |
NPDES IDR1002P2: effluent limits and exceedances
UNIVERSITY PARK (NPDES IDR1002P2): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR1002P2: no pollutant row on file.
NPDES IDR1002P2: inspections, violations and enforcement
NPDES IDR1002P2 (UNIVERSITY PARK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR1002P2
NPDES IDR1002P2: one email when its EPA record changes — $99/month.
Permits near NPDES IDR1002P2
NPDES IDR1002P2: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.