NPDES IDR10C02O · Clean Water Act
BILLINGSLEY CREEK DEVELOPMENT, Hagerman, ID: NPDES IDR10C02O discharge permit, effluent exceedances, inspections, penalties
BILLINGSLEY CREEK DEVELOPMENT, Hagerman, Idaho: General permit coverage IDR10C02O, held by Compliance Solutions and Contracting; Construction stormwater; Administratively continued; issued October 26, 2021, term to February 16, 2022; discharges to Billingsley Creek.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 451 were issued before IDR10C02O. Compliance Solutions and Contracting holds 2 permits in Idaho.
Other permits held by Compliance Solutions and Contracting
- LUXE THEATER AT LAKEMOORE, Eagle: IDR1001FB
Coverages issued nearest IDR10C02O
- 2021-10-21: HARSB WASTEWATER TREATMENT PLANT, Hayden: IDR10C02H, held by TML Construction, Inc.
- 2021-10-25: MANDALAY RANCH SUBDIVISION, Caldwell: IDR10C02J, held by Lennar Homes LLC
- 2021-10-26: GOLDEN TEE ESTATES 12TH ADDITION, Sandpoint: IDR10C02L, held by Harvey Rutherford
- 2021-10-26: LEDGESTONE 3, Kuna: IDR10C02M, held by Challenger
- 2021-10-26: SADDLEBACK SUBDIVISION NO. 3, Caldwell: IDR10C02N, held by Challenger Development, Inc.
- 2021-10-26: CRYSTAL SPRINGS, Star: IDR10C02P, held by Engineered Structures, Inc.
- 2021-10-26: SENECA SPRINGS SUBDIVISION, Star: IDR10C02Q, held by Seneca Subdivision LLC
- 2021-10-26: SENECA SPRINGS SUBDIVISION, Star: IDR10C02R, held by Conger Group
- 2021-10-27: SHAFER VIEW TERRACE SUBDIVISION PHASE 1, Meridian: IDR10C02S, held by HMH Construction, LLC
- 2021-10-27: VERVE BOISE, Boise: IDR10C02U, held by Brinkmann Constructors
BILLINGSLEY CREEK DEVELOPMENT among its neighbors
7 discharge permits are in the Billingsley Creek subwatershed (HUC 170402121104); IDR10C02O is one.
Other permits in the Billingsley Creek subwatershed (HUC 170402121104)
- ARK FISHERIES INC - BABINGTON PONDS, Hagerman: IDG130130, minor, term to 2004-09-10
- BILLINGSLEY CREEK RANCH, LLC, Hagerman: IDG130066, minor, term to 2004-09-10
- BLIND CANYON AQUA RANCH INC - BOYER PONDS, Hagerman: IDG130096, minor, term to 2004-09-10
- HIDDEN SPRINGS FARM PONDS, Hagerman: IDG130048, minor, term to 2004-09-10
- RIVERENCE FARMS LLC - LEE PONDS, Hagerman: IDG130050, minor, term to 2004-09-10
- RIVERENCE FARMS LLC - RANGEN HATCHERY, Hagerman: IDG130015, major, term to 2004-09-10
What stands out
- Its term runs 113 days, October 26, 2021 to February 16, 2022; the term ended 1,672 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BILLINGSLEY CREEK DEVELOPMENT |
|---|---|
| Permittee | Compliance Solutions and Contracting |
| NPDES ID | IDR10C02O |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 26, 2021 |
| Expires | February 16, 2022 |
| Address | Hagerman, ID 83332 |
| Receiving water | Billingsley Creek |
| Subwatershed | Billingsley Creek (HUC 170402121104) |
NPDES IDR10C02O: effluent limits and exceedances
BILLINGSLEY CREEK DEVELOPMENT (NPDES IDR10C02O): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C02O: no pollutant row on file.
NPDES IDR10C02O: inspections, violations and enforcement
NPDES IDR10C02O (BILLINGSLEY CREEK DEVELOPMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C02O
NPDES IDR10C02O: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C02O
NPDES IDR10C02O: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.