SENECA SPRINGS SUBDIVISION, Star, ID: NPDES IDR10C02R discharge permit, effluent exceedances, inspections, penalties

SENECA SPRINGS SUBDIVISION, Star, Idaho: General permit coverage IDR10C02R, held by Conger Group; Construction stormwater; Administratively continued; issued October 26, 2021, term to February 16, 2022; discharges to Big Gulch Creek.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 451 were issued before IDR10C02R. Conger Group holds 13 permits in Idaho.

Other permits held by Conger Group

Coverages issued nearest IDR10C02R

SENECA SPRINGS SUBDIVISION among its neighbors

197 discharge permits are in the Mill Slough-Boise River subwatershed (HUC 170501140410); IDR10C02R is one.

Other permits in the Mill Slough-Boise River subwatershed (HUC 170501140410)

What stands out

  • Its term runs 113 days, October 26, 2021 to February 16, 2022; the term ended 1,701 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilitySENECA SPRINGS SUBDIVISION
PermitteeConger Group
NPDES IDIDR10C02R
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedOctober 26, 2021
ExpiresFebruary 16, 2022
AddressStar, ID 83669
Receiving waterBig Gulch Creek
SubwatershedMill Slough-Boise River (HUC 170501140410)

NPDES IDR10C02R: effluent limits and exceedances

SENECA SPRINGS SUBDIVISION (NPDES IDR10C02R): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10C02R: no pollutant row on file.

NPDES IDR10C02R: inspections, violations and enforcement

NPDES IDR10C02R (SENECA SPRINGS SUBDIVISION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10C02R

NPDES IDR10C02R: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10C02R

NPDES IDR10C02R: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.