Clean Water Act discharge permit · NPDES IDR10C1IP
CHESTNUT HEIGHTS SOUTH SUBDIVISION, Caldwell, ID: NPDES IDR10C1IP discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
CHESTNUT HEIGHTS SOUTH SUBDIVISION, held by Trilogy Development, Inc., holds NPDES permit IDR10C1IP, which discharges to 25.1 Lateral. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for CHESTNUT HEIGHTS SOUTH SUBDIVISION: its NPDES ID, its permit type and status, its dates, its address in Caldwell, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C1IP.
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | CHESTNUT HEIGHTS SOUTH SUBDIVISION |
|---|---|
| Permittee as filed | Trilogy Development, Inc. |
| NPDES ID | IDR10C1IP |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Caldwell, ID 83607 |
| Receiving water | 25.1 Lateral |
| Subwatershed | Dixie Slough (HUC 170501140802) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C1IP.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C1IP.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C1IP.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C1IP.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C1IP.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C1IP there.
CHESTNUT HEIGHTS SOUTH SUBDIVISION, Caldwell, Idaho: Coverage under a general permit IDR10C1IP, held by Trilogy Development, Inc.; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to 25.1 Lateral.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1IP. Trilogy Development, Inc. holds 102 permits in Idaho.
Other permits held by Trilogy Development, Inc.
- PAD THAI HOUSE, Boise: IDR1000UK
- AEGEAN ESTATES STOCKPILES, Meridian: IDR1002A2
- JUMP CREEK SUBDIVISION: CREASON LATERAL OFFSITE, Meridian: IDR1002BF
- AEROSKY PARK 'A' DRAIN TILING, Caldewll: IDR1002VJ
- PROMINENCE SUBDIVISION, Boise: IDR10C0NS, issued 2023-02-07
- MIDDLEBURY NORTH SUBDIVISION NO. 1 & STONE LATERAL TILING, Nampa: IDR10C0NU, issued 2023-02-07
- WAVERLY PARK SUBDIVISION NO. 1, Middleton: IDR10C0OJ, issued 2023-03-13
- JASPER RIDGE SUBDIVISION NO. 2, Nampa: IDR10C0PV, issued 2023-04-17
- LEDGESTONE SUBDIVISION NO. 4, Kuna: IDR10C0Q8, issued 2023-04-21
- CALLISTO HEIGHTS SUBDIVISION, Boise: IDR10C0TJ, issued 2022-01-10
Coverages issued nearest IDR10C1IP
- 2022-01-10: TALEGA VILLAGE, Eagle: IDR10C1IK, held by Ramsey Construction LLC
- 2022-01-10: TSC DISTRIBUTION FACILITY #846, Nampa: IDR10C1IL, held by H&M Construction Co., Inc.
- 2022-01-10: WHITEROCK SUBDIVSION, Null: IDR10C1IM, held by Linder Land LLC
- 2022-01-10: 21ST AVENUE MARRIOTT, Caldwell: IDR10C1IN, held by Faber Construction
- 2022-01-10: CHESTNUT HEIGHT SUBDIVISION NO. 2, Caldwell: IDR10C1IO, held by Trilogy Development, Inc.
- 2022-01-10: SABINO'S ROCKY RIDGE SUBDIVISION NO 2, Kuna: IDR10C1IQ, held by Hubble Homes, LLC
- 2022-01-10: SUNNYVALE SUBDIVISION NO 6, Nampa: IDR10C1IR, held by Hubble Homes, LLC
- 2022-01-10: FRANKLIN VILLAGE NORTH SUBDIVISION NO 4 & 5, Nampa: IDR10C1IS, held by Hubble Homes, LLC
- 2022-01-10: PRESCOTT RIDGE SUBDIVISION NO 4 & 5, Meridian: IDR10C1IT, held by Hubble Homes, LLC
- 2022-01-10: BAKER PARK SUBDIVISION NO. 1, Nampa: IDR10C1IU, held by Trilogy Development, Inc.
CHESTNUT HEIGHTS SOUTH SUBDIVISION among its neighbors
62 discharge permits are in the Dixie Slough subwatershed (HUC 170501140802); IDR10C1IP is one.
Other permits in the Dixie Slough subwatershed (HUC 170501140802)
- 10TH AVENUE HEIGHTS, Caldwell: IDR100349
- ALYSON MEADOWS SUBDIVISION, Caldwell: IDR10C23O, minor, term to 2027-02-09
- ARROWROCK FARM SUBDIVISION NO 1 (CHALLENGER), Caldwell: IDR10C21C, minor, term to 2027-02-09
- ARROWROCK FARM SUBDIVISION NO. 2, Caldwell: IDR10C1VN, minor, term to 2027-02-09
- BEAR LANE PAVEMENT REHAB 2024, Caldwell: IDR10L0DK
- BRIAN AVENUE APARTMENTS, Caldwell: IDR10C0HJ, minor, term to 2027-02-09
- BROTHER'S PARK, Caldwell: IDR10L00N, term to 2021-11-01
- BROTHER'S PARK EXPANSION, Caldwell: IDR10L005, term to 2021-11-01
- BUD'S MARKETPLACE, Caldwell: IDR10C1E0, minor, term to 2027-02-09
- CALDWELL PARKS & REC - NEW OFFICE, Caldwell: IDR10L025, term to 2022-12-31
Nearby on the register
- Discharge permits in Caldwell
- Every permit record in Caldwell, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
CHESTNUT HEIGHTS SOUTH SUBDIVISION appears among 151 storm water construction permits in Caldwell, with 0.0% carrying a violation on file. The Dixie Slough subwatershed holds 62 NPDES permits, this permit included, and 56.3% of the 87 Caldwell storm water construction permits, this permit included, were issued before it.