NPDES IDR10C1QM · Clean Water Act
MACE 1, LLC, Eagle, ID: NPDES IDR10C1QM discharge permit, effluent exceedances, inspections, penalties
MACE 1, LLC, Eagle, Idaho: General permit coverage IDR10C1QM, held by Mace 1, LLC; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Boise River.
- October 9, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- October 9, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- October 9, 2025: Management Practice Violations - Improper Operation and Maintenance (ST6).
- October 9, 2025: WW Storm Water Construction - Narrative effluent violation (ST6).
- October 9, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
- October 9, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- September 24, 2025: WW Storm Water Construction - Narrative effluent violation (ST6).
- September 8, 2025: WW Storm Water Construction - Narrative effluent violation (ST6).
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1QM. Mace 1, LLC holds 2 permits in Idaho.
Other permits held by Mace 1, LLC
- MACE 1, LLC (MACE), Eagle: IDR10C1VO, issued 2022-01-10
Coverages issued nearest IDR10C1QM
- 2022-01-10: CITY OF MCCALL WATER STORAGE TANK, Mccall: IDR10C1QG, held by City of McCall
- 2022-01-10: IRISH ACRES, Tetonia: IDR10C1QH, held by Brandon Lerwill
- 2022-01-10: TETON HEIGHTS, Victor: IDR10C1QI, held by Austin
- 2022-01-10: TWIN BRIDGES LANDING PARK, Blackfoot: IDR10C1QJ, held by Steadman Construction, Inc.
- 2022-01-10: IRON MOUNTAIN VISTA SUBDIVISION, Star: IDR10C1QK, held by Richmond American Homes of Idaho, Inc.
- 2022-01-10: 19129 COVE ROAD BRIDGE - LHTAC, Weiser: IDR10C1QN, held by The Local Highway Technical Assistance Council
- 2022-01-10: MICRON ID1, Boise: IDR10C1QO, held by Hoffman Construction Company
- 2022-01-10: HOME2SUITES, Twin Falls: IDR10C1QP, held by Engineered Structures Inc
- 2022-01-10: HOWE LANDFILL, Howe: IDR10C1QS, held by Bud Johnson
- 2022-01-10: DAWSON TRAILS (OPERATOR), Mccall: IDR10C1QT, held by Nick Louie
MACE 1, LLC among its neighbors
223 discharge permits are in the North Slough-Boise River subwatershed (HUC 170501140404); IDR10C1QM is one. Its county: 668, 5 major; IDR10C1QM is minor permit.
Other permits in the North Slough-Boise River subwatershed (HUC 170501140404)
- 106 W. 53RD ST., Garden City: IDR1001QA
- 112 RIVERSEDGE DRIVE, Eagle: IDR10C27E, minor, term to 2027-02-09
- 323003 TVR1 TACO 1701 CHIB-05 CHINDEN CAMPUS PARKING LOTS, Boise: IDR10C1K5, minor, term to 2027-02-09
- 35TH STREET WATER MAIN REPLACEMENT, Garden City: IDR10C1R3, minor, term to 2027-02-09
- 45TH PLACE SUBDIVISION, Garden City: IDR10C1W8, minor, term to 2027-02-09
- 4658 & 4526 WEST OLD VALLEY ROAD, Eagle: IDR10C1VR, minor, term to 2027-02-09
- A SHELL ADDITION FOR VN PROPERTIES, Boise: IDR1002NN
- ACHD EAGLE & STATE ST PH I, Eagle: IDR10L0F7
- ADA COUNTY GLENWOOD PATHWAY RESTORATION 2025, Garden City: IDR10L0IZ
- ADA COUNTY HIGHWAY DISTRICT MS4, Boise: IDS028185, minor, term to 2014-10-14
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- Its newest dated event on file is a single-event violation on October 9, 2025, 341 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 7 single-event violations.
- EPA's file dates 8 events for it, all in 2025.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MACE 1, LLC |
|---|---|
| Permittee | Mace 1, LLC |
| NPDES ID | IDR10C1QM |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Eagle, ID 83616 |
| Receiving water | Boise River |
| Subwatershed | North Slough-Boise River (HUC 170501140404) |
NPDES IDR10C1QM: effluent limits and exceedances
MACE 1, LLC (NPDES IDR10C1QM): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C1QM: no pollutant row on file.
NPDES IDR10C1QM: inspections, violations and enforcement
NPDES IDR10C1QM: 8 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| October 9, 2025 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| October 9, 2025 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| October 9, 2025 | Management Practice Violations - Improper Operation and Maintenance | ST6 |
| October 9, 2025 | WW Storm Water Construction - Narrative effluent violation | ST6 |
| October 9, 2025 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
| October 9, 2025 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| September 24, 2025 | WW Storm Water Construction - Narrative effluent violation | ST6 |
| September 8, 2025 | WW Storm Water Construction - Narrative effluent violation | ST6 |
NPDES IDR10C1QM (MACE 1, LLC): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C1QM
NPDES IDR10C1QM: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C1QM
NPDES IDR10C1QM: 0 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.