Clean Water Act discharge permit · NPDES IDR10L00O
EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER, Nampa, ID: NPDES IDR10L00O discharge permit, effluent exceedances, inspections, penalties
- Not neededPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER, held by The Russel Corporation, holds NPDES permit IDR10L00O. EPA’s file records it issued September 7, 2021 and expiring April 30, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER: its NPDES ID, its permit type and status, its dates, its address in Nampa, Idaho. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10L00O.
What stands out
- Its term runs 235 days, September 7, 2021 to April 30, 2022; the term ended 1,599 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as not needed.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility as filed | EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER |
|---|---|
| Permittee as filed | The Russel Corporation |
| NPDES ID | IDR10L00O |
| Permit status | Not needed |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | September 7, 2021 |
| Expiration date | April 30, 2022 |
| Address | Nampa, ID 83867 |
| Subwatershed | Mason Creek (HUC 170501140407) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10L00O.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10L00O.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10L00O.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10L00O.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10L00O.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10L00O there.
EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER, Nampa, Idaho: Coverage under a general permit IDR10L00O, held by The Russel Corporation; Construction stormwater; Not needed; issued September 7, 2021, term to April 30, 2022.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 393 were issued before IDR10L00O.
Coverages issued nearest IDR10L00O
- 2021-08-30: EVENING VIEW SUBDIVISION, Pocatello: IDR10L00L, held by Matt Shiozawa
- 2021-08-31: SAWTOOTH LANDING OFFICE CONDOMINIUMS, Meridian: IDR10L00M, held by Julie Rivers Construction
- 2021-09-01: RIVERBEND CONDOS, Post Falls: IDR10C00N, held by Jacklin Land Company LLP
- 2021-09-01: BROTHER'S PARK, Caldwell: IDR10L00N, held by Jaime Edelmayer
- 2021-09-07: THE MODERN CRAFTSMEN AT TEN MILE, Meridian: IDR10C00O, held by Engineered Structures, Inc.
- 2021-09-10: HERITAGE PARK DIVERSION AND GRADING, Idaho Falls: IDR10C00Q, held by Knife River Corporation - Mountain West
- 2021-09-10: WINCO FOODS DISTRIBUTION CENTER, Boise: IDR10C00S, held by Engineered Structures, Inc.
- 2021-09-13: MICKELSEN CONSTRUCTION, INC., Blackfoot: IDR10L00P, held by Mickelsen Construction, Inc.
- 2021-09-16: ELEVATE ACADEMY NAMPA, Nampa: IDR10C00X, held by Engineered Structures, Inc.
- 2021-09-16: IDAHO OUTDOOR FIELD HOUSE, Boise: IDR10C00Y, held by Engineered Structures, Inc.
EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER among its neighbors
360 discharge permits are in the Mason Creek subwatershed (HUC 170501140407); IDR10L00O is one.
Other permits in the Mason Creek subwatershed (HUC 170501140407)
- 10 MILE RETAIL, Meridian: IDR10037Z
- 1209 ANDY LANE TRUCK YARD, Caldwell: IDR1002I9
- 17270 NORTHSIDE BOULEVARD, Nampa: IDR10L0KV
- 22102 FRANKLIN BLVD & KARCHER RD INT, Nampa: IDR10L0E1
- 4-LOT FLEX BUILDING SUBDIVISION, Caldwell: IDR1002R2
- 500 LATERAL RELOCATION, Caldwell: IDR10026E
- 620 N. 39TH STREET NORTH BUILDING, Nampa: IDR10L07V
- ABC ROOFING SUPPLY COMPANY, Nampa: IDR1000K1
- ADAMS RIDGE APARTMENTS, Nampa: IDR10C27V, minor, term to 2027-02-09
- ADAMS RIDGE SUBDIVISION NO 7, Nampa: IDR10C0UC, minor, term to 2027-02-09
Nearby on the register
- Discharge permits in Nampa
- Every permit record in Nampa, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER is in a Nampa group of 208 storm water construction permits, 0.0% of which carry a violation on file. Counting this permit, 45.2% of the 84 Nampa storm water construction permits were issued before it. The Mason Creek subwatershed holds 360 NPDES permits, this permit included.