NPDES IDR10L00P · Clean Water Act
MICKELSEN CONSTRUCTION, INC., Blackfoot, ID: NPDES IDR10L00P discharge permit, effluent exceedances, inspections, penalties
MICKELSEN CONSTRUCTION, INC., Blackfoot, Idaho: General permit coverage IDR10L00P, held by Mickelsen Construction, Inc.; Construction stormwater; Not needed; issued September 13, 2021, term to November 15, 2022.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 397 were issued before IDR10L00P.
Coverages issued nearest IDR10L00P
- 2021-09-01: BROTHER'S PARK, Caldwell: IDR10L00N, held by Jaime Edelmayer
- 2021-09-07: THE MODERN CRAFTSMEN AT TEN MILE, Meridian: IDR10C00O, held by Engineered Structures, Inc.
- 2021-09-07: EDMARK TOYOTA AFTERMARKET AND RECONDITIONING CENTER, Nampa: IDR10L00O, held by The Russel Corporation
- 2021-09-10: HERITAGE PARK DIVERSION AND GRADING, Idaho Falls: IDR10C00Q, held by Knife River Corporation - Mountain West
- 2021-09-10: WINCO FOODS DISTRIBUTION CENTER, Boise: IDR10C00S, held by Engineered Structures, Inc.
- 2021-09-16: ELEVATE ACADEMY NAMPA, Nampa: IDR10C00X, held by Engineered Structures, Inc.
- 2021-09-16: IDAHO OUTDOOR FIELD HOUSE, Boise: IDR10C00Y, held by Engineered Structures, Inc.
- 2021-09-17: LEWISTON - NEZ PERCE COUNTY AIRPORT, Lewiston: IDR10C010, held by Knife River Corporation - Mountain West
- 2021-09-21: AZEK CO WESTING FACILITY RAIL SIDING ADDITION, Boise: IDR10C011, held by Knife River Corporation - Mountain West
- 2021-09-21: LAKE VISTA ESTATES SUBDIVISION, Nampa: IDR10C012, held by Subdivision Maker LLC
MICKELSEN CONSTRUCTION, INC. among its neighbors
3 discharge permits are in the Watson Slough subwatershed (HUC 170402060209); IDR10L00P is one. Its county: 22, 2 major; IDR10L00P is a permit EPA has not classed major or minor.
Other permits in the Watson Slough subwatershed (HUC 170402060209)
- CIRCLE K - BLACKFOOT, Blackfoot: IDR10C24A, minor, term to 2027-02-09
- SIMPLOT BLACKFOOT SITE, Blackfoot: IDR10L00I, term to 2021-10-25
What stands out
- Its term runs 1 year and 63 days, September 13, 2021 to November 15, 2022; the term ended 1,400 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as not needed.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | MICKELSEN CONSTRUCTION, INC. |
|---|---|
| Permittee | Mickelsen Construction, Inc. |
| NPDES ID | IDR10L00P |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 13, 2021 |
| Expires | November 15, 2022 |
| Address | Blackfoot, ID 83221 |
| Subwatershed | Watson Slough (HUC 170402060209) |
| Other EPA IDs (FRS) | RCRA handler IDE000000007 |
NPDES IDR10L00P: effluent limits and exceedances
MICKELSEN CONSTRUCTION, INC. (NPDES IDR10L00P): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10L00P: no pollutant row on file.
NPDES IDR10L00P: inspections, violations and enforcement
NPDES IDR10L00P (MICKELSEN CONSTRUCTION, INC.): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10L00P
NPDES IDR10L00P: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10L00P
NPDES IDR10L00P: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.