NPDES IDR10L00Z · Clean Water Act
FRUITLAND SUBSTATION, Fruitland, ID: NPDES IDR10L00Z discharge permit, effluent exceedances, inspections, penalties
FRUITLAND SUBSTATION, Fruitland, Idaho: General permit coverage IDR10L00Z, held by Idaho Power Company; Construction stormwater; Not needed; issued October 12, 2021, term to February 28, 2022.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 431 were issued before IDR10L00Z. Idaho Power Company holds 48 permits in Idaho.
Other permits held by Idaho Power Company
- LANSING SUBSTATION, Middleton: IDR1000L4
- FILER SUBSTATION, Filer: IDR1001QK
- LINE 440 REBUILD, Picabo: IDR10020Y
- UPPER MALAD UNDERGROUND POWERLINE, Hagerman: IDR10027Z
- BEACON LIGHT SUBSTATION, Eagle: IDR100280
- WARM LAKE UNDERGROUND, Yellow Pine: IDR1002I4
- MIDPOINT STAGING YARD, Jerome: IDR1002KF
- EMMETT YARD DRAINAGE IMPROVEMENTS, Emmett: IDR1002UP
- LINE 172 REBUILD, Jerome: IDR1002WJ, issued 2021-01-26
- CALDWELL ROADS, Caldwell: IDR10033N, issued 2021-04-26
Coverages issued nearest IDR10L00Z
- 2021-10-12: FULLER 84 BUSINESS PARK - PHASE 2, Nampa: IDR10C020, held by Engineered Structures, Inc.
- 2021-10-12: HOPE PLAZA APARTMENTS - PHASE 3, Caldwell: IDR10C021, held by Wright Brothers The Building Company
- 2021-10-12: MTC PHASE 3 OFFSITE ROADWAY IMPROVEMENTS, Meridian: IDR10C022, held by Idaho Materials and Construction
- 2021-10-12: ASHTON ESTATES SUBDIVISION NO. 5, Kuna: IDR10C023, held by Hayden Homes Idaho, LLC
- 2021-10-12: COYOTE HOLLOW PHASE 3, Inkom: IDR10C024, held by Idaho Materials and Construction
- 2021-10-12: LSWCD LEMHI RIVER SEIFERT BANK PHASE 1, Salmon: IDR10L010, held by H&N Irrigation & Excavation Pam Hoggan
- 2021-10-14: DOVETAIL APARTMENTS, Meridian: IDR10C026, held by ARCO Murray
- 2021-10-15: HOLLYHOCK, Eagle: IDR10C028, held by Maddyn Homes, LLC
- 2021-10-15: CLARK FORK DRIFTYARD, Clark Fork: IDR10C029, held by Idaho Department of Fish and Game
- 2021-10-15: COLUMBIA SUBSTATION, Meridian: IDR10L011, held by Idaho Power Company
FRUITLAND SUBSTATION among its neighbors
12 discharge permits are in the Forty-nine Slough-Payette River subwatershed (HUC 170501220905); IDR10L00Z is one.
Other permits in the Forty-nine Slough-Payette River subwatershed (HUC 170501220905)
- 2ND AVE. S. SEWER REPLACEMENT, Payette: IDR10022K
- ASPEN MEADOWS (APEX), Fruitland: IDR10C0TT, minor, term to 2027-02-09
- FRUITLAND IDAHO PACKAGE, Fruitland: IDR1001W1
- HENGGELER PACKING CO., INC, Fruitland: ID0027901, minor, term to 2026-09-30
- ITD KN 22232 - US-95, FRUITLAND TO PAYETTE, Fruitland: IDR10C1ZB, minor, term to 2027-02-09
- JORDAN LANDING SENIOR LIVING TOWN HOMES SUB, Payette: IDR10C117, minor, term to 2027-02-09
- ORCHARD HEIGHTS SUBDIVISION NO. 1, Fruitland: IDR10C1XF, minor, term to 2027-02-09
- PARK CROSSING SUBDIVISION, Payette: IDR10C0SL, minor, term to 2027-02-09
- TRAPPERS PERCH APARTMENTS (PPA), Payette: IDR10C14Z, minor, term to 2027-02-09
- UPS PAYETTE, Payette: IDNOEJ00B
What stands out
- Its term runs 139 days, October 12, 2021 to February 28, 2022; the term ended 1,660 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as not needed.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | FRUITLAND SUBSTATION |
|---|---|
| Permittee | Idaho Power Company |
| NPDES ID | IDR10L00Z |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 12, 2021 |
| Expires | February 28, 2022 |
| Address | Fruitland, ID 83619 |
| Subwatershed | Forty-nine Slough-Payette River (HUC 170501220905) |
NPDES IDR10L00Z: effluent limits and exceedances
FRUITLAND SUBSTATION (NPDES IDR10L00Z): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10L00Z: no pollutant row on file.
NPDES IDR10L00Z: inspections, violations and enforcement
NPDES IDR10L00Z (FRUITLAND SUBSTATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10L00Z
NPDES IDR10L00Z: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10L00Z
NPDES IDR10L00Z: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.