NPDES IDR10L010 · Clean Water Act
LSWCD LEMHI RIVER SEIFERT BANK PHASE 1, Salmon, ID: NPDES IDR10L010 discharge permit, effluent exceedances, inspections, penalties
LSWCD LEMHI RIVER SEIFERT BANK PHASE 1, Salmon, Idaho: General permit coverage IDR10L010, held by H&N Irrigation & Excavation Pam Hoggan; Construction stormwater; Not needed; issued October 12, 2021, term to December 31, 2021.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 431 were issued before IDR10L010.
Coverages issued nearest IDR10L010
- 2021-10-12: HOPE PLAZA APARTMENTS - PHASE 3, Caldwell: IDR10C021, held by Wright Brothers The Building Company
- 2021-10-12: MTC PHASE 3 OFFSITE ROADWAY IMPROVEMENTS, Meridian: IDR10C022, held by Idaho Materials and Construction
- 2021-10-12: ASHTON ESTATES SUBDIVISION NO. 5, Kuna: IDR10C023, held by Hayden Homes Idaho, LLC
- 2021-10-12: COYOTE HOLLOW PHASE 3, Inkom: IDR10C024, held by Idaho Materials and Construction
- 2021-10-12: FRUITLAND SUBSTATION, Fruitland: IDR10L00Z, held by Idaho Power Company
- 2021-10-14: DOVETAIL APARTMENTS, Meridian: IDR10C026, held by ARCO Murray
- 2021-10-15: HOLLYHOCK, Eagle: IDR10C028, held by Maddyn Homes, LLC
- 2021-10-15: CLARK FORK DRIFTYARD, Clark Fork: IDR10C029, held by Idaho Department of Fish and Game
- 2021-10-15: COLUMBIA SUBSTATION, Meridian: IDR10L011, held by Idaho Power Company
- 2021-10-19: CONCORD SQUARE SUBDIVISION, Boise: IDR10C02B, held by Peter Harris Construction, Inc.
LSWCD LEMHI RIVER SEIFERT BANK PHASE 1 among its neighbors
1 discharge permits are in the Lower Lemhi Valley-Lemhi River subwatershed (HUC 170602040809); IDR10L010 is one.
What stands out
- Its term runs 80 days, October 12, 2021 to December 31, 2021; the term ended 1,719 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as not needed.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | LSWCD LEMHI RIVER SEIFERT BANK PHASE 1 |
|---|---|
| Permittee | H&N Irrigation & Excavation Pam Hoggan |
| NPDES ID | IDR10L010 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 12, 2021 |
| Expires | December 31, 2021 |
| Address | Salmon, ID 83467 |
| Subwatershed | Lower Lemhi Valley-Lemhi River (HUC 170602040809) |
NPDES IDR10L010: effluent limits and exceedances
LSWCD LEMHI RIVER SEIFERT BANK PHASE 1 (NPDES IDR10L010): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10L010: no pollutant row on file.
NPDES IDR10L010: inspections, violations and enforcement
NPDES IDR10L010 (LSWCD LEMHI RIVER SEIFERT BANK PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10L010
NPDES IDR10L010: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10L010
NPDES IDR10L010: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.