NPDES KYR10U398 · Clean Water Act
SOUTH OLDHAM HIGH SCHOOL ADDITION & RENOVATION, Crestwood (Oldham), KY: NPDES KYR10U398 discharge permit, effluent exceedances, inspections, penalties
SOUTH OLDHAM HIGH SCHOOL ADDITION & RENOVATION, Crestwood (Oldham), Kentucky: General permit coverage KYR10U398, held by South Oldham High School Addition & Renovation; Construction stormwater; Effective; issued March 10, 2026, term to December 31, 2029, by KY DEP; discharges to South Fork Harrods Creek.
- March 18, 2026: Evaluation (S).
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 1,243 were issued before KYR10U398.
Coverages issued nearest KYR10U398
- 2026-03-09: HAMPTON INN CAMPBELLSVILLE, Campbellsville: KYR10U390, held by Hampton Inn Campbellsville
- 2026-03-09: BIG SANDY-THELMA 138KV STR 72-73 EMERGENCY PROJECT, Salyersville: KYR10U392, held by Big Sandy-Thelma 138kV Str 72-73 Emergency Project
- 2026-03-10: PROJECT WAVE, Franklin: KYR10U395, held by Project Wave
- 2026-03-10: OLD HERITAGE SUBDIVISION - SECTION 4, Shelbyville: KYR10U396, held by Old Heritage Subdivision - Section 4
- 2026-03-10: PARKSIDE ESTATES - SECTION 1, La Grange: KYR10U397, held by Parkside Estates - Section 1
- 2026-03-10: DEER LAWN PHASE 4B, Winchester: KYR10U399, held by Deer Lawn Phase 4B
- 2026-03-11: HATFIELD-INEZ 138KV STR 3-5 EMERGENCY PROJECT, Jenkins: KYR10U391, held by Hatfield-Inez 138kV Str 3-5 Emergency Project
- 2026-03-11: KY 78 BRIDGE AND ROAD CONSTRUCTION, Hustonville: KYR10U393, held by KY 78 Bridge and road construction
- 2026-03-11: ASTEMO BEREA PLANT 2 EXPANSION, Berea: KYR10U394, held by Astemo Berea Plant 2 Expansion
- 2026-03-11: SEARCY DEVELOPMENT, Sparta: KYR10U400, held by Searcy Development
SOUTH OLDHAM HIGH SCHOOL ADDITION & RENOVATION among its neighbors
34 discharge permits are in the South Fork Harrods Creek subwatershed (HUC 051401010504); KYR10U398 is one. Its county: 350, 3 major; KYR10U398 is minor permit.
Other permits in the South Fork Harrods Creek subwatershed (HUC 051401010504)
- BLUEGRASS BUILDERS GROUP, Crestwood: KYG405153, minor, term to 2028-08-31
- BRIAN & KRISTI BRISCOE RESIDENCE, Crestwood: KYG402687, minor, term to 2023-08-31
- BRIAN WALTRIP RESIDENCE, Pee Wee Valley: KYG405883, minor, term to 2028-08-31
- CLORE STATION SECTION 1, Crestwood (Oldham): KYR10T689, minor, term to 2029-12-31
- DAKKOTA INTEGRATED SYSTEMS - LOUISVILLE OPERATIONS [CHAMBERLAIN 1], Louisville: KYR004386, minor, term to 2023-07-31
- DAMARR PRICE RESIDENCE, Crestwood: KYG405463, minor, term to 2028-08-31
- EDITH M BROWN RESIDENCE, Crestwood: KYG402852, minor, term to 2023-08-31
- ELIZABETH & JOSEPH CLAY RESIDENCE, Crestwood: KYG405139, minor, term to 2028-08-31
- ETHAN ADAMS RESIDENCE, Pee Wee Valley: KYG405882, minor, term to 2028-08-31
- FLOYD & STEPHANIE HORSLEY RESIDENCE, Crestwood: KYG402941, minor, term to 2023-08-23
What stands out
- Its term runs 3 years and 296 days, March 10, 2026 to December 31, 2029.
- Its newest dated event on file is an inspection on March 18, 2026, 181 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 5,741 discharge permits on the register in Kentucky; 1,852 of them (32%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SOUTH OLDHAM HIGH SCHOOL ADDITION & RENOVATION |
|---|---|
| Permittee | South Oldham High School Addition & Renovation |
| NPDES ID | KYR10U398 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 10, 2026 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Crestwood (Oldham), KY 40014 |
| Receiving water | South Fork Harrods Creek |
| Subwatershed | South Fork Harrods Creek (HUC 051401010504) |
NPDES KYR10U398: effluent limits and exceedances
SOUTH OLDHAM HIGH SCHOOL ADDITION & RENOVATION (NPDES KYR10U398): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10U398: no pollutant row on file.
NPDES KYR10U398: inspections, violations and enforcement
NPDES KYR10U398: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 18, 2026 | Evaluation | S |
NPDES KYR10U398 (SOUTH OLDHAM HIGH SCHOOL ADDITION & RENOVATION): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10U398
NPDES KYR10U398: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10U398
NPDES KYR10U398: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.