NPDES KYR10U394 · Clean Water Act
ASTEMO BEREA PLANT 2 EXPANSION, Berea, KY: NPDES KYR10U394 discharge permit, effluent exceedances, inspections, penalties
ASTEMO BEREA PLANT 2 EXPANSION, Berea, Kentucky: General permit coverage KYR10U394, held by Astemo Berea Plant 2 Expansion; Construction stormwater; Effective; issued March 11, 2026, term to December 31, 2029, by KY DEP; discharges to Ballard Branch.
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 1,248 were issued before KYR10U394.
Coverages issued nearest KYR10U394
- 2026-03-10: PARKSIDE ESTATES - SECTION 1, La Grange: KYR10U397, held by Parkside Estates - Section 1
- 2026-03-10: SOUTH OLDHAM HIGH SCHOOL ADDITION & RENOVATION, Crestwood (Oldham): KYR10U398, held by South Oldham High School Addition & Renovation
- 2026-03-10: DEER LAWN PHASE 4B, Winchester: KYR10U399, held by Deer Lawn Phase 4B
- 2026-03-11: HATFIELD-INEZ 138KV STR 3-5 EMERGENCY PROJECT, Jenkins: KYR10U391, held by Hatfield-Inez 138kV Str 3-5 Emergency Project
- 2026-03-11: KY 78 BRIDGE AND ROAD CONSTRUCTION, Hustonville: KYR10U393, held by KY 78 Bridge and road construction
- 2026-03-11: SEARCY DEVELOPMENT, Sparta: KYR10U400, held by Searcy Development
- 2026-03-11: HATFIELD-INEZ 138KV STR 48A EMERGENCY PROJECT, Prestonsburg: KYR10U401, held by Hatfield-Inez 138kV Str 48A Emergency Project
- 2026-03-11: KY120 MERCER SOLAR, Harrodsburg: KYR10U402, held by KY120 Mercer Solar
- 2026-03-12: WHITEWATER CAR WASH - MT. ZION, Florence: KYR10U403, held by WhiteWater Car Wash - Mt. Zion
- 2026-03-12: BASS PRO SHOPS OUTPOST - PADUCAH, KY, Paducah: KYR10U404, held by Bass Pro Shops Outpost - Paducah, KY
ASTEMO BEREA PLANT 2 EXPANSION among its neighbors
7 discharge permits are in the Ballard Branch-Silver Creek subwatershed (HUC 051002050204); KYR10U394 is one. Its county: 126, 4 major; KYR10U394 is minor permit.
Other permits in the Ballard Branch-Silver Creek subwatershed (HUC 051002050204)
- AIRPORT 2025 TAXIWAY CONNECTOR AND RUN UP PADS, Richmond: KYR10T725, minor, term to 2029-12-31
- JEROLD YOUNG RESIDENCE, Richmond: KYG405334, minor, term to 2028-08-31
- JOSH & TESSA SALLEE RESIDENCE, Berea: KYG405921, minor, term to 2028-08-31
- MAYDE ROAD EXTENSION, Berea: KYR10T954, minor, term to 2029-12-31
- RICHMOND SILVER CREEK STP, Richmond: KYL103357, minor, term to 2025-12-31
- THE ATRIUM, Richmond: KYR10T952, minor, term to 2029-12-31
What stands out
- Its term runs 3 years and 295 days, March 11, 2026 to December 31, 2029.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,741 discharge permits on the register in Kentucky; 1,852 of them (32%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ASTEMO BEREA PLANT 2 EXPANSION |
|---|---|
| Permittee | Astemo Berea Plant 2 Expansion |
| NPDES ID | KYR10U394 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 11, 2026 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Berea, KY 40403 |
| Receiving water | Ballard Branch |
| Subwatershed | Ballard Branch-Silver Creek (HUC 051002050204) |
NPDES KYR10U394: effluent limits and exceedances
ASTEMO BEREA PLANT 2 EXPANSION (NPDES KYR10U394): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10U394: no pollutant row on file.
NPDES KYR10U394: inspections, violations and enforcement
NPDES KYR10U394 (ASTEMO BEREA PLANT 2 EXPANSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10U394
NPDES KYR10U394: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10U394
NPDES KYR10U394: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.