NPDES KYR10U402 · Clean Water Act
KY120 MERCER SOLAR, Harrodsburg, KY: NPDES KYR10U402 discharge permit, effluent exceedances, inspections, penalties
KY120 MERCER SOLAR, Harrodsburg, Kentucky: General permit coverage KYR10U402, held by KY120 Mercer Solar; Construction stormwater; Effective; issued March 11, 2026, term to December 31, 2029, by KY DEP; discharges to Salt River.
- July 17, 2026: Evaluation (S).
- May 6, 2026: Evaluation (S).
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 1,248 were issued before KYR10U402.
Coverages issued nearest KYR10U402
- 2026-03-11: HATFIELD-INEZ 138KV STR 3-5 EMERGENCY PROJECT, Jenkins: KYR10U391, held by Hatfield-Inez 138kV Str 3-5 Emergency Project
- 2026-03-11: KY 78 BRIDGE AND ROAD CONSTRUCTION, Hustonville: KYR10U393, held by KY 78 Bridge and road construction
- 2026-03-11: ASTEMO BEREA PLANT 2 EXPANSION, Berea: KYR10U394, held by Astemo Berea Plant 2 Expansion
- 2026-03-11: SEARCY DEVELOPMENT, Sparta: KYR10U400, held by Searcy Development
- 2026-03-11: HATFIELD-INEZ 138KV STR 48A EMERGENCY PROJECT, Prestonsburg: KYR10U401, held by Hatfield-Inez 138kV Str 48A Emergency Project
- 2026-03-12: WHITEWATER CAR WASH - MT. ZION, Florence: KYR10U403, held by WhiteWater Car Wash - Mt. Zion
- 2026-03-12: BASS PRO SHOPS OUTPOST - PADUCAH, KY, Paducah: KYR10U404, held by Bass Pro Shops Outpost - Paducah, KY
- 2026-03-12: MARSHALL HEIGHTS, Benton: KYR10U405, held by Marshall Heights
- 2026-03-12: BETHEL SPRINGS SECTION 4, Mount Washington: KYR10U406, held by Bethel Springs Section 4
- 2026-03-12: ETKAC SUBDIVISION, Elizabethtown: KYR10U407, held by ETKAC Subdivision
KY120 MERCER SOLAR among its neighbors
3 discharge permits are in the Mcafee-Salt River subwatershed (HUC 051401020103); KYR10U402 is one. Its county: 33, 2 major; KYR10U402 is minor permit.
Other permits in the Mcafee-Salt River subwatershed (HUC 051401020103)
- MERCER COUNTY ATHLETIC IMPROVEMENTS - PHASE 2, Harrodsburg: KYR10U611, minor, term to 2029-12-31
- MERCER COUNTY SOLAR FACILITY SUBSTATION GRADING, Harrodsburg: KYR10T325, minor, term to 2029-12-31
What stands out
- Its term runs 3 years and 295 days, March 11, 2026 to December 31, 2029.
- Its newest dated event on file is an inspection on July 17, 2026, 89 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 2 inspections.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 5,741 discharge permits on the register in Kentucky; 1,852 of them (32%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | KY120 MERCER SOLAR |
|---|---|
| Permittee | KY120 Mercer Solar |
| NPDES ID | KYR10U402 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 11, 2026 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Harrodsburg, KY 40330 |
| Receiving water | Salt River |
| Subwatershed | Mcafee-Salt River (HUC 051401020103) |
| SIC | 1611 – Highway And Street Construction |
NPDES KYR10U402: effluent limits and exceedances
KY120 MERCER SOLAR (NPDES KYR10U402): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10U402: no pollutant row on file.
NPDES KYR10U402: inspections, violations and enforcement
NPDES KYR10U402: 2 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| July 17, 2026 | Evaluation | S |
| May 6, 2026 | Evaluation | S |
NPDES KYR10U402 (KY120 MERCER SOLAR): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10U402
NPDES KYR10U402: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10U402
NPDES KYR10U402: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.