NPDES MAR1002W7 · Clean Water Act
BEDFORD WOODS - LOT 1, Bedford, MA: NPDES MAR1002W7 discharge permit, effluent exceedances, inspections, penalties
BEDFORD WOODS - LOT 1, Bedford, Massachusetts: General permit coverage MAR1002W7, held by Gutierrez Construction Co. Inc.; Construction stormwater; Administratively continued; issued October 12, 2020, term to February 15, 2022, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 226 were issued before MAR1002W7. Gutierrez Construction Co. Inc. holds 2 permits in Massachusetts.
Other permits held by Gutierrez Construction Co. Inc.
- 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, issued 2021-08-03
Coverages issued nearest MAR1002W7
- 2020-10-01: MILL POND ESTATES, Burlington: MAR1002VB, held by GTH Homes, LLC
- 2020-10-05: MILE LANE & LINEBROOK ROAD OPEN SPACE PRESERVATION ZONING (PHASE II), Ipswich: MAR1002VN, held by Symes Development & Permitting, LLC
- 2020-10-06: STURBRIDGE, MA - RESURFACING ALONG I-90, Sturbridge: MAR1002VS, held by Northeast Paving
- 2020-10-07: BALTAZAR CONTRACTORS, INC: FRAMINGHAM, MA - EDGELL ROAD AT EDMANDS RD/WATER ST, Framingham: MAR1002VW, held by Baltazar Contractors, Inc.
- 2020-10-09: MASSDOT 606718-110953 HATHAWAY ROAD AT MOUNT PLEASANT AND NAUSET STREETS, New Bedford: MAR1002W2, held by K. R. Rezendes, Inc.
- 2020-10-13: WALTHAM HIGH SCHOOL, Waltham: MAR1002WA, held by Consigli Construction
- 2020-10-15: AMHERST DOG PARK, Amherst: MAR1002WG, held by Valiant Group
- 2020-10-21: SPENCER SOLAR FACILITY, Spencer: MAR1002WV, held by Nextera Energy, Inc.
- 2020-10-27: WINTHROP ESTATES SUBDIVISION, Medford: MAR1002X5, held by Waypoint Development LLC
- 2020-10-27: JOANNE DRIVE, Stow: MAR1002X6, held by Kendall Homes, Inc.
BEDFORD WOODS - LOT 1 among its neighbors
88 discharge permits are in the Upper Shawsheen River subwatershed (HUC 010700061301); MAR1002W7 is one.
Other permits in the Upper Shawsheen River subwatershed (HUC 010700061301)
- 1366 TECHNOLOGIES INC., Bedford: MANOEJ033, minor, term to 2024-11-20
- 17 HARTWELL AVE, Lexington: MAR1005MV, minor, term to 2027-02-16
- 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, minor, term to 2022-02-15
- 2019 EMD MILLIPORE DEMOLITION PROJECT, Bedford: MAR1002E0, minor, term to 2022-02-15
- 25 NETWORK DRIVE OFFICE/LAB/MANUFACTURING BUILDING, Burlington: MAR100411, minor, term to 2027-02-16
- 28 MERIAM STREET, Lexington: MAR1005DR, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006CF, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006FY, minor, term to 2027-02-16
- 40 MIDDLESEX TURNPIKE, Bedford: MAR1005LP, minor, term to 2027-02-16
- 7 HARTWELL AVENUE, Lexington: MAG912279, minor, term to 2027-08-01
What stands out
- Its term runs 1 year and 126 days, October 12, 2020 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BEDFORD WOODS - LOT 1 |
|---|---|
| Permittee | Gutierrez Construction Co. Inc. |
| NPDES ID | MAR1002W7 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 12, 2020 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Bedford, MA 01730 |
| Subwatershed | Upper Shawsheen River (HUC 010700061301) |
NPDES MAR1002W7: effluent limits and exceedances
BEDFORD WOODS - LOT 1 (NPDES MAR1002W7): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1002W7: no pollutant row on file.
NPDES MAR1002W7: inspections, violations and enforcement
NPDES MAR1002W7 (BEDFORD WOODS - LOT 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1002W7
NPDES MAR1002W7: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1002W7
NPDES MAR1002W7: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.