NPDES MAR1003EF · Clean Water Act
THE VALE, Woburn, MA: NPDES MAR1003EF discharge permit, effluent exceedances, inspections, penalties
THE VALE, Woburn, Massachusetts: General permit coverage MAR1003EF, held by Erland Construction, Inc.; Construction stormwater; Administratively continued; issued July 20, 2021, term to February 15, 2022, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 375 were issued before MAR1003EF. Erland Construction, Inc. holds 6 permits in Massachusetts.
Other permits held by Erland Construction, Inc.
- 100 FORGE ROAD ARSENAL YARDS, Watertown: MAR10031P, issued 2021-01-06
- 101 SMITH PLACE, Cambridge: MAR10037T, issued 2021-04-09
- LIFETIME LIVING MULTI-FAMILY RESIDENTIAL, Burlington: MAR1003JT, issued 2021-10-05
- HILL STREET, Woburn: MAR1003U2, issued 2022-04-20
- THE VANTAGE, Dedham: MAR1006CH, issued 2026-05-27
Coverages issued nearest MAR1003EF
- 2021-07-07: 140 POND STREET, BILLERICA, MA, Billerica: MAR1003DP, held by Eugene T. Sullivan Inc.
- 2021-07-08: HOPKINTON VILLAGE CENTER, Hopkinton: MAR1003DS, held by Lobossier Companies
- 2021-07-09: TERRAZZA - 100 LINDEN STREET - WELLESLEY, MA, Wellesley: MAR1003DY, held by RISE Construction Management
- 2021-07-14: HUXLEY SOLAR, LLC - LUDLOW, MA, Ludlow: MAR1003E5, held by Signal Energy DG, LLC
- 2021-07-14: BEACON SOLAR LLC - EASTHAMPTON, MA, Easthampton: MAR1003E6, held by Signal Energy DG, LLC
- 2021-07-20: 1023 & 1029 EAST STREET, Tewksbury: MAR1003EG, held by East Street Tewksbury, LLC
- 2021-07-22: BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS, Lanesborough: MAR1003EH, held by WM. J Keller & Sons Construction Corp
- 2021-07-23: ACTON WATER SOLAR PROJECT - LAWSBROOK ROAD, Acton: MAR1003EI, held by Acton Water Solar Partners, LLC
- 2021-07-26: S1760-042 LUDLOW: SOUTHBRIDGE, MA - SOUTH ST WATER TRANSMISSION MAIN, Southbridge: MAR1003EM, held by Ludlow Construction Co. Inc
- 2021-07-26: #2021 WARNER BROS: NORTHAMPTON, MA - RECLAIM STREET PAVING, Northampton: MAR1003EQ, held by Warner Bros., LLC
THE VALE among its neighbors
59 discharge permits are in the Aberjona River subwatershed (HUC 010900010501); MAR1003EF is one.
Other permits in the Aberjona River subwatershed (HUC 010900010501)
- 1 ARROW DRIVE, Woburn: MAR1005RR, minor, term to 2027-02-16
- 21 INDUSTRIAL WAY, WILMINGTON, MA, Wilmington: MANOEJ0DT, minor, term to 2029-07-31
- 216 NEW BOSTON CGMP BUILDING, Woburn: MAR1005AF, minor, term to 2027-02-16
- 316 NEW BOSTON STREET, WOBURN MA, Woburn: MAR1004AN, minor, term to 2027-02-16
- 39 OLYMPIA AVENUE, WOBURN, MA, Woburn: MANOEJ0DY, minor, term to 2029-07-31
- 45 HOLTON STREET, WINCHESTER, MA, Winchester: MANOEJ0DV, minor, term to 2029-07-31
- 59 MILL STREET - MILL STREET APARTMENTS, Woburn: MAR1004YK, minor, term to 2027-02-16
- 64 HOLTON STREET, WOBURN, MA, Woburn: MANOEJ0DW, minor, term to 2029-07-31
- 8 PRESIDENTIAL WAY, WOBURN, Woburn: MAR10062D, minor, term to 2027-02-16
- 887 WOBURN, Wilmington: MAR1005H8, minor, term to 2027-02-16
What stands out
- Its term runs 210 days, July 20, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE VALE |
|---|---|
| Permittee | Erland Construction, Inc. |
| NPDES ID | MAR1003EF |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 20, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Woburn, MA 01801 |
| Subwatershed | Aberjona River (HUC 010900010501) |
NPDES MAR1003EF: effluent limits and exceedances
THE VALE (NPDES MAR1003EF): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1003EF: no pollutant row on file.
NPDES MAR1003EF: inspections, violations and enforcement
NPDES MAR1003EF (THE VALE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1003EF
NPDES MAR1003EF: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1003EF
NPDES MAR1003EF: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.