NPDES MAR1003EH · Clean Water Act
BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS, Lanesborough, MA: NPDES MAR1003EH discharge permit, effluent exceedances, inspections, penalties
BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS, Lanesborough, Massachusetts: General permit coverage MAR1003EH, held by WM. J Keller & Sons Construction Corp; Construction stormwater; Administratively continued; issued July 22, 2021, term to February 15, 2022, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 377 were issued before MAR1003EH.
Coverages issued nearest MAR1003EH
- 2021-07-09: TERRAZZA - 100 LINDEN STREET - WELLESLEY, MA, Wellesley: MAR1003DY, held by RISE Construction Management
- 2021-07-14: HUXLEY SOLAR, LLC - LUDLOW, MA, Ludlow: MAR1003E5, held by Signal Energy DG, LLC
- 2021-07-14: BEACON SOLAR LLC - EASTHAMPTON, MA, Easthampton: MAR1003E6, held by Signal Energy DG, LLC
- 2021-07-20: THE VALE, Woburn: MAR1003EF, held by Erland Construction, Inc.
- 2021-07-20: 1023 & 1029 EAST STREET, Tewksbury: MAR1003EG, held by East Street Tewksbury, LLC
- 2021-07-23: ACTON WATER SOLAR PROJECT - LAWSBROOK ROAD, Acton: MAR1003EI, held by Acton Water Solar Partners, LLC
- 2021-07-26: S1760-042 LUDLOW: SOUTHBRIDGE, MA - SOUTH ST WATER TRANSMISSION MAIN, Southbridge: MAR1003EM, held by Ludlow Construction Co. Inc
- 2021-07-26: #2021 WARNER BROS: NORTHAMPTON, MA - RECLAIM STREET PAVING, Northampton: MAR1003EQ, held by Warner Bros., LLC
- 2021-07-28: BELLE FLEUR HOLDINGS LLC, Blanford: MAR1003F0, held by Belle Fleur Holdings, LLC
- 2021-07-29: DOHERTY HIGH SCHOOL - EARLY SITE PACKAGE, Worcester: MAR1003F3, held by Fontaine/Dimeo Joint Venture
BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS among its neighbors
6 discharge permits are in the Headwaters Hoosic River subwatershed (HUC 020200030601); MAR1003EH is one.
Other permits in the Headwaters Hoosic River subwatershed (HUC 020200030601)
- 3.23 MW DC PHOTOVOLTAIC SOLAR DEVELOPMENT, Cheshire: MAR1005J9, minor, term to 2027-02-16
- CHESHIRE HAULING FACILITY, Cheshire: MAR05J03X, minor, term to 2026-02-28
- CHESHIRE TOWN OF, Cheshire: MAR041243
- GROVE STREET SOLAR, Adams: MAR10032F, minor, term to 2022-02-15
- PARTRIDGE SOLAR, Lanesborough: MAR100355, minor, term to 2022-02-15
What stands out
- Its term runs 208 days, July 22, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS |
|---|---|
| Permittee | WM. J Keller & Sons Construction Corp |
| NPDES ID | MAR1003EH |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 22, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Lanesborough, MA 01201 |
| Subwatershed | Headwaters Hoosic River (HUC 020200030601) |
NPDES MAR1003EH: effluent limits and exceedances
BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS (NPDES MAR1003EH): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1003EH: no pollutant row on file.
NPDES MAR1003EH: inspections, violations and enforcement
NPDES MAR1003EH (BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1003EH
NPDES MAR1003EH: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1003EH
NPDES MAR1003EH: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.