NPDES MAR1003F3 · Clean Water Act
DOHERTY HIGH SCHOOL - EARLY SITE PACKAGE, Worcester, MA: NPDES MAR1003F3 discharge permit, effluent exceedances, inspections, penalties
DOHERTY HIGH SCHOOL - EARLY SITE PACKAGE, Worcester, Massachusetts: General permit coverage MAR1003F3, held by Fontaine/Dimeo Joint Venture; Construction stormwater; Administratively continued; issued July 29, 2021, term to February 15, 2022, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 382 were issued before MAR1003F3.
Coverages issued nearest MAR1003F3
- 2021-07-22: BERKSHIRE VILLAGE WATERLINE IMPROVEMENTS, Lanesborough: MAR1003EH, held by WM. J Keller & Sons Construction Corp
- 2021-07-23: ACTON WATER SOLAR PROJECT - LAWSBROOK ROAD, Acton: MAR1003EI, held by Acton Water Solar Partners, LLC
- 2021-07-26: S1760-042 LUDLOW: SOUTHBRIDGE, MA - SOUTH ST WATER TRANSMISSION MAIN, Southbridge: MAR1003EM, held by Ludlow Construction Co. Inc
- 2021-07-26: #2021 WARNER BROS: NORTHAMPTON, MA - RECLAIM STREET PAVING, Northampton: MAR1003EQ, held by Warner Bros., LLC
- 2021-07-28: BELLE FLEUR HOLDINGS LLC, Blanford: MAR1003F0, held by Belle Fleur Holdings, LLC
- 2021-07-29: LINE 312 STRUCTURE REPLACEMENT PROJECT, Hinsdale: MAR1003F5, held by Eversource Energy
- 2021-07-29: LOGAN AIRPORT - REHABILITATION OF RUNWAY 14-32, TAXIWAY S J/J1, East Boston: MAR1003F8, held by Massachusetts Port Authority
- 2021-07-30: PROPOSED BUILDING EXPANSION, 200 SHUMAN AVENUE, STOUGHTON, MA, Stoughton: MAR1003F9, held by Integrated Builders, Inc.
- 2021-08-03: 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, held by Gutierrez Construction Co. Inc.
- 2021-08-04: RACHEL'S WAY SUBDIVISION, Lakeville: MAR1003FJ, held by Bisio & Son Constuction, Inc.
DOHERTY HIGH SCHOOL - EARLY SITE PACKAGE among its neighbors
76 discharge permits are in the Tatnuck Brook-Blackstone River subwatershed (HUC 010900030102); MAR1003F3 is one.
Other permits in the Tatnuck Brook-Blackstone River subwatershed (HUC 010900030102)
- #605377, MILLBURY, MCCRACKEN RD & GREENWOOD ST RECONSTRUCTION, Millbury: MAR100554, minor, term to 2027-02-16
- 185 MADISON ST, Worcester: MAR1003T6, minor, term to 2027-02-16
- 185 MADISON STREET, Worcester: MAR10033S, minor, term to 2022-02-15
- 222 BROOKS STREET - RESIDENTIAL, Worcester: MAR1003WY, minor, term to 2027-02-16
- 222 BROOKS STREET - RESIDENTIAL, Worcester: MAR1003WZ, minor, term to 2027-02-16
- 47R FOURTH STREET, Worcester: MAR1004MI, minor, term to 2027-02-16
- 50 & 190 WASHINGTON STREET, AUBURN, Auburn: MAR1005R1, minor, term to 2027-02-16
- 91 WORCESTER-PROVIDENCE TURNPIKE, MILLBURY, MA, Millbury: MAR1005SM, minor, term to 2027-02-16
- 92 GRAND STREET, Worcester: MAR10035U, minor, term to 2022-02-15
- 939 SOUTHBRIDGE STREET REPAVING AND GARAGE EXPANSION, Worcester: MAR10064P, minor, term to 2027-02-16
What stands out
- Its term runs 201 days, July 29, 2021 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DOHERTY HIGH SCHOOL - EARLY SITE PACKAGE |
|---|---|
| Permittee | Fontaine/Dimeo Joint Venture |
| NPDES ID | MAR1003F3 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 29, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Worcester, MA 01602 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Tatnuck Brook-Blackstone River (HUC 010900030102) |
NPDES MAR1003F3: effluent limits and exceedances
DOHERTY HIGH SCHOOL - EARLY SITE PACKAGE (NPDES MAR1003F3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1003F3: no pollutant row on file.
NPDES MAR1003F3: inspections, violations and enforcement
NPDES MAR1003F3 (DOHERTY HIGH SCHOOL - EARLY SITE PACKAGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1003F3
NPDES MAR1003F3: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1003F3
NPDES MAR1003F3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.