NPDES MAR10043D · Clean Water Act
PINE HILL REDEVELOPMENT, Concord, MA: NPDES MAR10043D discharge permit, effluent exceedances, inspections, penalties
PINE HILL REDEVELOPMENT, Concord, Massachusetts: General permit coverage MAR10043D, held by Builtech Services LLC; Construction stormwater; Effective; issued June 27, 2022, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 824 were issued before MAR10043D. Builtech Services LLC holds 2 permits in Massachusetts.
Other permits held by Builtech Services LLC
- PINE HILL REDEVELOPMENT, Concord: MAR10042L, issued 2022-06-17
Coverages issued nearest MAR10043D
- 2022-06-24: DEMOLITION AND STOCKPILING ACTIVITIES RELATED TO THE SUFFOLK DOWNS REDEVELOPMENT, Revere: MAR100437, held by John Moriarty and Associates
- 2022-06-24: LIFE STORAGE REDEVELOPMENT, Salem: MAR100438, held by Nardone Inc.
- 2022-06-24: REVERE DPW FACILITY CONSTRUCTION, Revere: MAR100439, held by G.V.W., Inc.
- 2022-06-24: PENNIE LANE (LOTS 2,4,5), Stow: MAR10043B, held by Thomas Bergeron
- 2022-06-24: TOWER HEIGHTS PHASE V, East Bridgewater: MAR10043C, held by MJL Construction Corp.
- 2022-06-27: LAFLEUR & SON - FRANKLIN STREET, Belchertown: MAR10043G, held by Lafleur & Son
- 2022-06-27: TRIDENT LOGISTICS CENTER, Revere: MAR10043I, held by Revere MA Owner LLC
- 2022-06-28: 800-810 LYNNWAY, Lynn: MAR10042Y, held by Plumb House, Inc.
- 2022-06-28: PARK DRIVE SOLAR PV DEVELOPMENT, Acushnet: MAR10043J, held by Mill Creek Renewables
- 2022-06-28: BRIDE REPLACEMENT NEW BOSTON STREET OVER THE MBTA RR, Woburn: MAR10043L, held by A.A. Will Construction Corp.
PINE HILL REDEVELOPMENT among its neighbors
88 discharge permits are in the Upper Shawsheen River subwatershed (HUC 010700061301); MAR10043D is one.
Other permits in the Upper Shawsheen River subwatershed (HUC 010700061301)
- 1366 TECHNOLOGIES INC., Bedford: MANOEJ033, minor, term to 2024-11-20
- 17 HARTWELL AVE, Lexington: MAR1005MV, minor, term to 2027-02-16
- 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, minor, term to 2022-02-15
- 2019 EMD MILLIPORE DEMOLITION PROJECT, Bedford: MAR1002E0, minor, term to 2022-02-15
- 25 NETWORK DRIVE OFFICE/LAB/MANUFACTURING BUILDING, Burlington: MAR100411, minor, term to 2027-02-16
- 28 MERIAM STREET, Lexington: MAR1005DR, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006CF, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006FY, minor, term to 2027-02-16
- 40 MIDDLESEX TURNPIKE, Bedford: MAR1005LP, minor, term to 2027-02-16
- 7 HARTWELL AVENUE, Lexington: MAG912279, minor, term to 2027-08-01
What stands out
- Its term runs 4 years and 234 days, June 27, 2022 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PINE HILL REDEVELOPMENT |
|---|---|
| Permittee | Builtech Services LLC |
| NPDES ID | MAR10043D |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 27, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Concord, MA 01742 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Upper Shawsheen River (HUC 010700061301) |
NPDES MAR10043D: effluent limits and exceedances
PINE HILL REDEVELOPMENT (NPDES MAR10043D): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR10043D: no pollutant row on file.
NPDES MAR10043D: inspections, violations and enforcement
NPDES MAR10043D (PINE HILL REDEVELOPMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR10043D
NPDES MAR10043D: one email when its EPA record changes — $99/month.
Permits near NPDES MAR10043D
NPDES MAR10043D: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.